Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Vacuum Vessel Production Readiness Review
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
WA105 General Meeting at CERN 21 & 22-January-2014 Enrique Calvo Alamillo.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Compressor status AWAKE Technical Board meeting 19 May 2015.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 December 2013 LAV construction & installation status.
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
LAV damage and repair – M. Moulson (Frascati) – Photon Veto WG – CERN – 5 April 2011 Damage to A3 during transport 2 10 blocks were broken during transport.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Test beam setup: status report 02/03/2009 M. Alfonsi (CERN)
Compressor status AWAKE Technical Board meeting 19 August 2015.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 14 December 2010.
Development of the Room Temperature CH-DTL in the frame of the HIPPI-CARE Project Gianluigi Clemente,
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Mass Simulator Concepts Robert Besuner 12 October 2005.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
Beam Vacuum Interconnect Design Options Ray Veness.
MICE Construction Project Update: SSs, PRY, Cavities, Tracker… 1MAP Friday Meeting – January 30, 2015 Alan Bross.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 A11 transport 2 Departure for CERN 24/07 with delivery originally.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
US Construction Project: SSs, PRY, Cavities and test program 1.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Nam seung woo. 8month ago… Principle of reactor pressure vessel.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
S.Movchan Straw manufacturing and QC
LAV HV repair plans Matthew Moulson
NA62 LAV Anti1 REMOVAL & TESTS
S.Movchan Straw manufacturing and QC
Status of design and production of LEP connection cryostat
Preliminary Y-chamber specifications – First draft
Atlas Calorimeter with LN2 Cooling Loops, Revision B
On the accuracy of port assembly at Wendelstein 7-X
PP 14° Bi-Weekly meeting S1-Global, June 1, 2009
Atlas Calorimeter with LN2 Cooling Loops
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Phase II Secondary Collimator RC-0 and RC-1
SNS Coupler Shipping Plans
Presentation transcript:

Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 17 July 2012 A11 construction status 2 Completed and tested 6/7 Rotation and vacuum testing week of 9/7 Full survey with laser tracker 17/7 and 18/7 Shipment scheduled for 24/7 (delivery 25/7) Leak test: < 2×10 −9 mbar∙ℓ/s

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 17 July 2012 A11 transport plans 3 Shipment with Fasoli scheduled for 24/07 – Delivery to CERN 25/07 A8 transport 10 May Shipping container modified Outer diameter ~ 3 m Container width ~ 3.5 m Width > 3 m = Wide Load Need police escort! Mount Blanc Tunnel shut down both directions (Approval requested)

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 17 July 2012 Status of A9, A10 vessels 4 Start-up meeting INFN-Fantini on 9 May at Fantini (Anagni) Can stainless steel with μ/μ 0 = 1.01 be obtained? Generally suppliers will make no guarantees about μ/μ 0 Fantini-INFN tour of proposed suppliers of stainless steel to take measurements of 304L plate stock (plus comparisons 304LN, 316L, etc.) INFN will investigate if criterion for μ/μ 0 can be relaxed Measurement of μ/μ 0 for existing stainless steel segments of blue tube Average μ/μ 0 for 304L plate stock (before working): – 1.020

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 17 July 2012 Measurements of μ/μ 0 for existing tubes 5

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 17 July 2012 Conclusions: μ/μ 0 for existing tubes 6 Typical μ/μ 0 measurements for tube inside magnet gap (#25) Flanges1,05-1,10 Tube wall1,01-1,04 Supports 1,04-1,10 Welds 1,60-1,90* *Also verified that there are no peaks of μ/μ 0 on flanges that could suggest the presence of welds Typical μ/μ 0 measurements for adjacent tubes (#24, #27) Flanges1,05-1,10 Tube wall1,01-1,30* *These tubes are made from individual plates welded together. The value of μ/μ 0 varies significantly from plate to plate.

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 17 July 2012 Status of A9, A10 vessels 7 Plate steel for A9 cylinder: Ordered from Outokumpu (CR) 2 plates, 9 m long, 40 mm thick, 304LN (stabilized in nitrogen) Characteristically low permeability Usually very expensive (€17/kg ~ 4× cost of 304L), but highly discounted Flanges: Ordered from a foundry near Varese Forged 304L, to be solubilized after forging to obtain low μ/μ 0 Production will be monitored 200-mm nozzles: Cut from whole steel on cannon mill, can be solubilized if needed All material should be delivered by end of Sep 2012 A9 vessel delivery: late Jan/early Feb 2013 A10 vessel delivery: late Jun 2013