NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.

Slides:



Advertisements
Similar presentations
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
Advertisements

HVACR316 - Piping Piping and Fitting.
Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
Ss Hefei, China July 19, 2011 Nuclear, Plasma, and Radiological Engineering Center for Plasma-Material Interactions Contact: Flowing.
Flowing Heat Matt Weisenberger, University of Kentucky, Center for Applied Energy Research 2540 Research Park Dr., Lexington,
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
Project Summary. Mission Statement To develop a Volumetric Flow Sensor to measure the volume of gas flowing through a quadrant and into the combustion.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Design and Development of a Thermoelectric Beverage Cooler By: Brandon Carpenter Andrew Johnston Tim Taylor Faculty Advisor: Dr. Quamrul Mazumder University.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Instructions for Printing Fluid Power Task Cards Print slides 2-5 and then take to a copy machine to make double sided copies Copy slide 2 to the front.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Update on Thermal Performance of the Gas- Cooled.
NSTX TF Bundle & Center Stack Curing Oven Mike Viola Joe Rushinski Frank Jones April 14, 2003.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
NCSX Helium Bakeout System M. Kalish 3/25/02
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
NCSX VACUUM VESSEL PL Goranson Comprehensive Final Design Review May 05, 2005 Vacuum Vessel Supports Heating/Cooling System NCSX.
HVAC523 Piping and Fittings.
1 NCSX Modular coil winding pack To shim or not to shim? NCSX WBS 1 Engineering Meeting July 7, 2004 What is requirement? What is baseline winding pack.
Senior Design Team #18 Lacey Ednoff Brianna Beconovich Jarimy Passmore Jesse Poorman.
Work toward Stainless Steel SRF Helium Vessels at Fermilab Tom Peterson (presenter), Information from Jeff Brandt, Serena Barbanotti, Harry Carter, Sergei.
2-d Insulation Analysis of Clamp / Vacuum Vessel Insulation crushing
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski, B. H. Mills, and J. D. Rader G. W. Woodruff School of Mechanical Engineering Correlations for the Plate Divertor.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Twisted Racetrack Manufacturing & Metrology. Winding/metrology prototype chronology Various keystoning tests – Completed. –Established keystone effect.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
NCSX Operation of the C1 Modular Coil in the Coil Test Facility Peer Review June1, 2006 NCSX.
1 Modular Coil Winding Keystoning Issues NCSX Technical Meeting May 29, 2003 What is the current baseline winding? What is the problem? What are the variables.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
The integration of 420 m detectors into the LHC
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Final Design Review April 4, 2006 Coolant Hose Assemblies and Thermo- hydraulics NCSX.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
Pierre Barroca ITK LAPP – Goals 2.Simulation 3.Prototype measurements 4.Setup 5.Results 6.Conclusions 1.Goals 2.Simulation 3.Prototype measurements.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
1 NCSX radial build NCSX Project Meeting December 18, Modular coil build assumptions 2.Vessel build assumptions 3.FW/internal build assumptions.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
SPS High Energy LSS5 Thermal contact & cooling aspects
704 MHz cavity design based on 704MHZ_v7.stp C. Pai
Flowing Heat 4th grade science experiment
M1M3 Fan Coil Unit Status Gary Muller & Brian Johnson LSST 2017 Project & Community Workshop 8/17/2017.
Design ideas for a cos(2q) magnet
The EMC cooling F. Raffaelli INFN - Pisa 06/09/2017.
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
X.R. Wang, M. S. Tillack, S. Malang, F. Najmabadi and the ARIES Team
Testing and installation of prototype diode insulation system in MB2950 Florian Meuter, 3rd Meeting on Diode Consolidation during LS2,
FP420 Detector Cooling Thermal Considerations
Internal review of the 11T dipole reaction fixture and impregnation mould Outcome of the meeting F. Savary 19 October CERN.
Date of download: 3/4/2018 Copyright © ASME. All rights reserved.
Real Solutions Product Introduction
SNS PPU Cryomodule Thermal Shield
SNS PPU Cryomodule Thermal Shield & MLI
Presentation transcript:

NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX

Talk Overview P. Goranson GOALS TEST SUMMARIES TEST RESULTS K. Freudenberg ANALYSES ANALYSES/TEST COMPARISONS P. Goranson CONCLUSIONS/RECOMMENDATIONS/STATUS

NCSX GOALS Compare thermal performance of smooth tube vs. braided corrugated hose. Benchmark ANSYS analyses. Project the test results across to VV cooling performance. Determine baseline design for VV heating/cooling tracing configuration. Evaluate alternative conductive materials (thermal caulk). Measure pressure drop in braided hose. Test effectiveness of Copper ground strap (doily)

NCSX MDL TEST SETUP

NCSX TEST ASSY Utilized existing MDL resources –Oven –Thermocouple controllers –Braided hose –Building compressed air for cooling Setup geometry was not meant to be completely duplicate VV system. A helium source was not available nor was very high pressure air. - Curved SS plate represented VV NSTX center stack mockup with studs - Cu saddles were fabricated to correct geometry - Hose was prototypic Smooth tubing test used Cu tube with SS insert to represent tube wall - permitted using same saddles and at same time duplicating hose flow parameters (h, v) - large SS tube overloaded building capacity Test Assembly With Braided Hose ss Tube Assy Saddle Tube Gasket

NCSX AIR FLOW/PRESSURE/TEMP MONITORING

NCSX TEST COMPONENTS Saddles –Cu precision fit to hose & tubing insert Saddle Gaskets –1/16” Grafoil –0.005” Cu shim Tube and Hose gaskets –0.005” Cu shim –0.01” Grafoil Clamps 1/8” x 1” steel to permit large clamping force

NCSX TEST PROCEDURE Test assembly was covered in insulation and heated to test temperature by the oven. When assy temperature equilibrated, oven was turned off; door remained closed. Temperature of thermocouple at varying positions around saddles were recorded in 2 minute intervals, for 30 minutes total. Air flow (scfm), temperature, inlet pressure, and outlet pressure across test section were monitored. Tests were performed using different combinations of gasket materials under the saddles and under the tubing inserts.

Straight tube Approximation TC Locations NCSX

TEST RESULTS braided with both Grafoil smooth, Grafoil gasket braided, Cu gasket smooth with both Grafoil braided, Grafoil gasket smooth, Cu gasket Braided hose does cool.

NCSX Ground Strap (doily) Results of the test were disappointing. Test performed with 0.04” x 1” x 6” Cu strap wrapped and clamped to hose with Grafoil. Other end bolted down by stud, washer, and Grafoil gasket. Results - temperature drop after 15 minutes – 6.5 C - temperature drop after 30 minutes – 13 C

NCSX FACS Un-cooled plate temperature fell less than 2 degrees C in 30 minutes, none in 15 minutes. Cooled plate dropped by as much as 24 C in 15 minutes. Cu foil under the braided hose decreased performance. Grafoil under the braided hose increased performance. Grafoil under the smooth tube improved performance. Grafoil under the saddle improved braided both hose and smooth tube performance. Grafoil was required under both the saddle and the tube insert to attain the theoretical cool down time of the smooth tube. Pressure drop in braided hose is ~6 times the equivalent smooth tube with same I.D., At these flow regimes, twice the manufacturer’s estimate.

NCSX CONCLUSIONS Where we are headed: Braided hose does not perform as well as smooth tube but is good enough. We propose to go with it. Neither tubing nor hose is proving to be as effective as previously predicted. Braided hose is: more cost effective (more studs cost a lot less than segmented hose) easier to install quicker procurement time more suppliers probably more reliable The VV will require twice the number of studs and saddles, and a redistribution of some of the tracing, regardless of whether or not the tracing is tubes or hose. Presently, the only alternative to hose is segmented hose made up of short braided sections intervened with shot straight tube sections, essentially a lot of braided hoses with end fittings welded together. None of the thermal caulks tested has proven to be advantageous. Only one, Pyro-Putty 950, adhered and exhibited structural integrity through bakeout; unfortunately its conductivity was 7.4 time worse than saddles.

NCSX Design Changes Simplified saddle assy Saddle is two pieces rather than one Reduces machining Assures good alignment and clamping Two clamps rather than one Permits spacing tubes further apart in some locations One saddle cools almost as well as two so wider spacing can be more effective WAS NOW

STUD LOCATION INDICATED WITH 1INCH RADIUS BALLS STUD LOCATION THE RIGHT HAND SIDE REPRESENTS A 5 INCH SPACING BETWEEN STUD LOCATIONS THE LEFT HAND SIDE IS THE ORIGINAL SPACING. THE SPACING VARIES FROM A NOMINAL OF 8 INCHES +/- 2 INCHES. THE TOTAL NO. OF STUD LOCATIONS ON THE RIGHT HAND SIDE IS ~ 356 FOR A HALF PERIOD THE TOTAL NO. OF STUD LOCATIONS ON THE LEFT HAND SIDE IS ~ 226 FOR A HALF PERIOD THE STUD LOCATIONS HAVE NOT BEEN OPTIMIZED RELATIVE TO THE MAGNETIC LOOPS. TOP VIEW

STUD LOCATIONS ON THE FRONT AND BACK SIDE 5 INCH SPACING BETWEEN STUDS NOMINAL 8 INCH SPACING +/- 2 INCHES 5 INCH SPACING BETWEEN STUDS Outboard view Inboard view

STUD LOCATIONS ON THE FRONT AND BACK SIDE NOMINAL 8 INCH SPACING +/- 2 INCHES 5 INCH SPACING BETWEEN STUDS Inboard view

HEATING/COOLING CLAMP ASSY GRAFFOIL 2.5X1.25X.06 COPPER 1.0X1.25X.333 GRAFFOIL.01 THICK STUD 5/16ODX3/4LG WASHER NUT HEATING/COOLING TUBE.48OD CLAMP