Public Service Commission of Utah Workshop 12/4/2007 Generation Interconnection Utility perspective Rocky Mountain Power Les Bahls, director transmission.

Slides:



Advertisements
Similar presentations
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Advertisements

GEORGIA POWERS SMALL POWER PRODUCERS FUNDAMENTALS.
Course Material Overview of Process Safety Compliance with Standards
Distributed Generation (DG)
Study Committee Representatives Annual Report December, 2012
Small Wind and Solar Systems Kristi Robinson Steele-Waseca Cooperative Electric.
Does owning a solar array make you a utility?...and other questions A presentation to the Kentucky Environmental Quality Commission Andrew Melnykovych.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
DRA Advocacy Joe Como, Acting Director. 2 DRA Facts The Voice of Consumers, Making a Difference! 3  History: CPUC created DRA (formerly known as the.
PowerPoint ® Presentation Chapter 12 Utility Interconnection Distributed Generation Generators Inverters Interconnection Codes and Standards Interconnection.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Federal Energy Regulatory Commission Large Generator Interconnection Final Rule RM July 23, 2003.
U.S. Small Business Administration
Topics to Cover Interconnection Process Overview
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Entity Registration Under EPAct 2005 Public Power Council April 6, 2006 Louise McCarren Chief Executive Officer WECC.
Summary Overview: MADRI Model Small Generator Interconnection Procedures Prepared by Brad Johnson* June 15, 2006 ACN Energy Ventures
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
IEEE 1547: The DG Interconnection Standard
Tom MAZOUR IAEA, Division of Nuclear Power
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
Technical Conference on Net Metering Load Research Study November 5, 2014.
Small Generation Interconnection Standards - IOU Dennis Reed Westar Energy Topeka, KS September 26, 2007.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
OSC Meeting April 27, Transmission Cost Allocation Overview.
AmerenUE SHOW ME SOLAR June 15, 2010 MISSOURI NET METERING AND SOLAR REBATE PROGRAM Lisa Cosgrove – Renewables Specialist.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
PUBLIC POWER UTILITIES IN IDAHO Presented to Legislative Generation Sub-Committee by Idaho Energy Authority (IDEA) and Idaho Consumer Owned Utilities Association.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
CENE 386 Engineering Design: The Methods. Getting Ready to Get the Job Getting as much information as possible prior to making the proposal –Profile the.
05/18/001 N.Treadway Distributed Resources and Competitive Energy Markets in Illinois Workshop Session III, “Interconnection Issues” Thursday, May 18,
1 Distributive Generation Wind Landfill Solar Fuel CellMicro-Turbine.
©2004 PJMwww.pjm.com 1 PJM's Perspective on Reliability – Summer 2004 and Beyond Karl Pfirrmann President -- PJM Western Region FERC Summer Reliability.
March 30, 2012 Wholesale Generation Interconnection Process Photovoltaic Program Power Purchase Agreements Request for Offers.
Role of the Commission and Recent Policy Actions Interconnection Workshop Carol Revelt Utah Public Service Commission December 4, 2007.
Standards Review Subcommittee Update August 17, 2010.
Utah Geothermal Power Generation Workshop Regulatory Issues August 17, 2005 Presented by Becky Wilson Utility Economist Utah Public Service Commission.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
Business Process Mapping “Power Sector - Distribution”
S T A T E O F C A L I F O R N I A. Expediting the Application Review Process Building Schools — Putting Californians to Work.
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Contestability Working Group Consultation Report and Recommendations NIE Networks / SONI Joint Presentation 26 January 2016.
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
Interconnected Generation Preliminary Engineering Work Related to Fees.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Real Estate & Leasing Services Carie Carman Deputy Director Real Estate and Leasing Services Section (REALS) Construction & Properties.
Summary Overview: Maryland Straw Man Interconnection Rule Prepared by Brad Johnson* January 11, 2007 ACN Energy Ventures *National.
Black Start Service in New England System Operator’s Perspective Robert B. Burke ISO New England Inc. July 23, 2002 IEEE - Chicago, Illinois.
Interconnection Practice, Policies, Procedures ComEd Illinois
IID Generating Facility Interconnection Process
Integrated Distribution Planning Process
Systems Analysis and Design
City Council April 30, 2018 Item 13
Transforming Scenario Narratives into Study Cases
TxMAG presentation
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Public Service Commission of Utah Workshop 12/4/2007 Generation Interconnection Utility perspective Rocky Mountain Power Les Bahls, director transmission service

Distribution system generator interconnection Utility concern and duties Engineering and operating issues Cost and economic issues Customer service issues Sample process chart

The utility's engineering and operating concerns about generator interconnection.  Safety of public, neighbors on the circuit, utility employees, generator and customer employees.  We do this by applying codes and good utility practices. The study considers the original condition of the interconnection, the generator must have duty to maintain their plant in condition to avoid safety risk.  reliability other customers on shared lines  We do this by study of the generator technical data and apply protection and control tools to protect the reliability of other customers when necessary to trip the generator.  power quality of other customers on shared lines  An example- customers are seldom happy when their lights flicker every time the neighbors generator starts up.  grid stability and our NERC and WECC duties  affected systems, other utilities can be affected beyond RMP.

The utility's cost and economic concerns about generator interconnections.  PURPA requirement against cost shifting - Rate Payer Neutrality  Thus the study, construction, inspection, maintenance and administration costs should be borne by the customer generator  Power purchase is from our merchant, must be sought separately.  Interconnection and power purchase agreement (PPA) must be sought separately, we recommend in parallel  Generator's incentive to operate safely, reliability  On going maintenance, responsibility of the generator and utility side facilities.  Utility's costs increased by inefficient staffing driven by surge in demand for studies  We rely on protection and control, metering, communication, planning engineers with one specialist for generator interconnects, a surge ion demand can overwhelm this resource.  Customer generator's rights to existing capacity based on queue position and obligation if no capacity available.

The utility's customer service concerns about generator interconnection  Getting the applicant in the queue  Triggered by application, deposit for study and full technical data  Remaining flexible in approach yet providing timely responses.  Customer has economic driver to get connected ASAP, balance with safety, reliability duty of utility.  Explaining cost estimates.  Utility grade materials as well as labor and overheads, these are unknown costs when the customer begins planning.  Applying six sets of rules in six states

Joint Work: Developer and PacifiCorp PacifiCorp Developer Overview: Standard Distribution Interconnection Process Power Purchase Agreement (PPA) discussions and negotiations Interconnection Agreement (ICA) discussions and negotiations 1) See the interconnection Study Process map for details related to the study process High level technical requirements sent Sign ISLA, deposit required funds, provide technical data Construct project, including interconnection facilities Initial consultation to scope interconnectio n options Field visit and feasibility study as necessary Finalize PPA Prepare and finalize facility construction agreement Finalize ICA Energize, test and commission interconnection project True-up costs for interconnection facilities Interconnection Process complete Send information packet to Developer Technical study agreement (ISLA) prepared Perform study and submit results to Developer (1) Project in queue True-up study costs Procurement and construction of PPW interconnection facilities *Gray lines denote approximate timing Initial request for interconnection

Interconnection process is complete  Interconnection agreement is signed  Construction agreement is satisfied, commissioning and inspection are done.  Power purchase agreement is signed and approved.