STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.

Slides:



Advertisements
Similar presentations
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Advertisements

J. Strait Fermilab October 21, 2005 The Neutrino Detector of the Future: A Massive Liquid Argon TPC.
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
U.S. Department of Energy Brookhaven Science Associates BNL’s Role in High Energy Physics Thomas B.W. Kirk Associate Director for High Energy and Nuclear.
ESS End-to-End Optics and Layout Integration Håkan Danared European Spallation Source Catania, 6 July 2011.
Reactor & Accelerator Thanks to Bob McKeown for many of the slides.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
Neutrino Study Group Dec 21, 2001 Brookhaven Neutrino Super-BeamStephen Kahn Page 1 Horn and Solenoid Capture Systems for a BNL Neutrino Superbeam Steve.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
Alain Blondel Neutrino Factory scenarios I will endeavour to address some principle design issues related to the physics use of high intensity muon beams.
February 19, 2001Neutrino Beams from BNL to Homestake Stephen Kahn Page 1 A Super-Neutrino Beam From BNL to Homestake Steve Kahn
J-PARC upgrade T. Nakadaira (KEK / J-PARC). Outline J-PARC overview & on-going program Motivation of future experiment in J-PARC Overview of future experiment.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
ESSnuSB Project for Leptonic CP Violation Discovery based on the European Spallation Source Linac NOW 2014, 10/9E. Wildner, CERN 2 Elena WILDNER CERN for.
The Earth Matter Effect in the T2KK Experiment Ken-ichi Senda Grad. Univ. for Adv. Studies.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
Dec. 13, 2001Yoshihisa OBAYASHI, Neutrino and Anti-Neutrino Cross Sections and CP Phase Measurement Yoshihisa OBAYASHI (KEK-IPNS) NuInt01,
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Harold G. Kirk Brookhaven National Laboratory Target Considerations for Nufact and Superbeams ISS Meeting RAL April 26, 2006.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
Acceleration of Protons in FFAG with Non-Scaling Lattice and Linear Field Profile Alessandro G. Ruggiero Semi-Annual International 2006 FFAG Workshop November.
Long Baseline Neutrino Beams and Large Detectors Nicholas P. Samios Istanbul, Turkey October 27, 2008.
FFAG Accelerators for Proton Driver Alessandro G. Ruggiero Brookhaven National Laboratory FFAG 2007, Grenoble, France April 12-17, 2007.
Proton Driver Main Linac Parameter Optimization G. W. Foster Proton Driver General Meeting Jan 19, 2005.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
Proton FFAG Accelerator R&D at BNL Alessandro G. Ruggiero Brookhaven National Laboratory Alessandro G. Ruggiero Brookhaven National Laboratory.
1 The BNL Super Neutrino Beam Project W. T. Weng Brookhaven National Laboratory APS April Meeting ( T13 ) Tampa, Florida April 18, 2005.
Fermilab Proton Driver Project Weiren Chou for Bill Foster Fermilab, U.S.A. October 20, 2004 Presentation at the Proton Driver Session ICFA-HB2004, Bensheim,
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
July 30, 2004S. Kahn1 Very Long Baseline experiment with a Super Neutrino Beam Brookhaven National Laboratory Presented to the NuFact04, Osaka University.
DESIGN OF THE BNL SUPER NEUTRINO BEAM FACILITY W. T. Weng Brookhaven National Laboratory Neutrino Super Beam, Detectors and Proton Decay BNL/UCLA/APS Workshop.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
Monday, Mar. 3, 2003PHYS 5326, Spring 2003 Jae Yu 1 PHYS 5326 – Lecture #12 Monday, Mar. 3, 2003 Dr. Jae Yu 1.Neutrino Oscillation Measurements 1.Atmospheric.
September 10, 2002M. Fechner1 Energy reconstruction in quasi elastic events unfolding physics and detector effects M. Fechner, Ecole Normale Supérieure.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
Steering Group Meeting 10:30 – 12:30 am CDT Monday, July 23, 2007 Y2K.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
U.S. Plans for High Power Proton Drivers Steve Holmes Fermilab Workshop on Physics with a Multi-MW Proton Source CERN May 25, 2004.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Summary Vyacheslav Yakovlev Fermilab, USA.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
UK Neutrino Factory Conceptual Design
Superbeams with SPL at CERN
FFAG Accelerator Proton Driver for Neutrino Factory
Progress towards Pulsed Multi-MW CERN Proton Drivers
A Superconducting Proton/Electron Linac
AC Power for a Super-B Factory
Presentation transcript:

STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003

OUTLINE Physics Reach from a Very Long Baseline Neutrino Beam AGS High Intensity Performance AGS Upgrade (1MW): AGS Upgrade (4MW) Chronology of BNL Super Neutrino Beam Program Conclusion

Physics Goals of the Very Long Baseline Neutrino Program We introduce a plan to provide the following goals in a single facility:  precise determination of the oscillation parameters  m 32 2 and sin 2 2  23  detection of the oscillation of   e and measurement of sin 2 2  13  measurement of  m 21 2 sin 2 2  12 in a   e appearance mode, independent of the value of  13  verification of matter enhancement and the sign of  m 32 2  determination of the CP-violation parameter  CP in the neutrino sector The use of a single neutrino super beam source and half-megaton neutrino detector will optimize the efficiency and cost-effectiveness of a full program of neutrino measurements. If the value of sin 2 2  13 happens to be larger than ~0.01, then all the parameters, including CP-violation can be determined in the VLB program presented here.

Advantages of a Very Long Baseline  neutrino oscillations result from the factor sin 2 (  m 32 2 L / 4E) modulating the flux for each flavor (here  disappearance)  the oscillation period is directly proportional to distance and inversely proportional to energy  with a very long baseline actual oscillations are seen in the data as a function of energy  the multiple-node structure of the very long baseline allows the  m 32 2 to be precisely measured by a wavelength rather than an amplitude (reducing systematic errors)

Baseline Length and Neutrino Energy  for a fixed phase angle, e.g.  /2, the ratio of distance to energy is fixed (see sloped lines in Figure)  the useful neutrino energy range in a beam derived from a proton production source is restricted: below ~1 GeV by Fermi mom. in the target nucleus above ~8 GeV by inelastic interactions background  these conditions prescribe a needed baseline of greater than 2000 km from source to detector  by serendipity, the distance from BNL to the Homestake Mine in Lead, SD is 2540 km

Mass -ordering and CP-violation Parameter  CP  the CP-violation parameter  CP can be measured in the VLB exp. And is relatively insensitive to the value of sin 2 2  13  the mass-ordering of the neutrinos is determined in the VLB exp; 1 < 2 < 3 is the natural order but 1 < 3 < 2 is still possible experimentally; VLB determines this, using the effects of matter on the higher-energy neutrinos

AGS Intensity History 1 MW AGS

Total Accelerated Protons at the AGS 0.8     Total accelerated protons 1.0   Slow extracted beam (Kaon decay) Fast extracted beam (g-2) Note: Lower total accelerated protons in later years due to much shorter running time

AGS Upgrade to 1 MW 200 MeV Drift Tube Linac BOOSTER High Intensity Source plus RFQ Superconducting Linacs To RHIC 400 MeV 800 MeV 1.2 GeV To Target Station AGS 1.2 GeV  28 GeV 0.4 s cycle time (2.5 Hz) 0.2 s 200 MeV l 1.2 GeV superconducting linac extension for direct injection of ~ 1  protons low beam loss at injection; high repetition rate possible further upgrade to 1.5 GeV and 2  protons per pulse possible (x 2) l 2.5 Hz AGS repetition rate triple existing main magnet power supply and magnet current feeds double rf power and accelerating gradient further upgrade to 5 Hz possible (x 2)

AGS 1 MW Upgrade and SC Linac Parameters Proton Driver Parameters ItemValue Total beam power1 MW Protons per bunch0.4  Beam energy28 GeV Injection turns230 Average beam current38 mA Repetition rate2.5 Hz Cycle time400 ms Pulse length0.72 ms Number of protons per fill9.6  Chopping rate0.75 Number of bunches per fill24 Linac average/peak current20/30 mA Superconducting Linac Parameters Linac Section LE ME HE Av Beam Pwr, kW Av Beam Curr, mA K.E. Gain, MeV Frequency, MHz Total Length, m Accel Grad, MeV/m norm rms ,  mm-mr

Neutrino Beam Production 1 MW He gas-cooled Carbon- carbon target New horn design Target on down-hill slope for long baseline experiment Beam dump well above ground water table to avoid activation

Neutrino Spectrum at 1 km Low Z (Carbon) target seems feasible for 1 MW, 28 GeV proton beam. Thin low Z target minimizes reabsorption which increases flux of high energy neutrinos

Upgrade to 4MW 1. Raise SCL energy to 1.5 GeV, AGS repetition rate to 5Hz with 2 x ppp. 2. Add post AGS accelerator to 40 GeV, raise AGS rep rate to 5 Hz with 1.4 x ppp.

Chronology of BNL Super Neutrino Beam Program 1. June/01 US Feasibility Study-II of a Neutrino Factory 2. Dec/01 Establishment of BNL Neutrino Working Group for 2MW neutrino superbeam 3.April/02 Presentation of HIHB Hadron Beam Workshop at FNAL 4.June/02 Presentation of NuFact 2002 Workshop, London 5.Oct/02 BNL NWG Report-I 6.Feb/03 HEPAP Facility Subcommittee presentation

Chronology of BNL Super Neutrino Beam Program (cont’d.) 7.April/03 BNL NWG Report-II 8.Aug/03 Phys. Rev. D68, (2003) 9.Nov/03 NBI2003, KEK 10.Dec/03 UCLA Workshop on Detector 11.April/04 BNL Workshop on Source

Conclusions 1.The VLBL approach is capable of resolving most of the neutrino physics issues, including that of cp violation. 2.The feasibility has been demonstrated for a 1MW upgrade for the AGS 3.It is possible to further upgrade the AGS to 4MW Such a high power proton driver is essential for very long base line neutrino experiment and also for the neutrino factory.