I.GS Action List following the 94 th meeting held on 7 December 2011 II.CERN Hotel I.Program of Work II.Accommodation :Future Evolution III.Ongoing Improvements.

Slides:



Advertisements
Similar presentations
Everything you ever wanted to know about 774….
Advertisements

Panorama AGM 2014 Bansko Summary of year Accounts The future of Panorama.
Service Management Status 107 th ACCU Meeting 10 March 2015.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
1 WW 2 History Club 25 – Jan European Theater DDay to The Bulge.
1. Contents I. GS Action list following the 98th meeting held on 7 December 2012 II. CERN Hotel III. LS1 i. Increased car fleet IV. Restaurant & Snack.
Implementing a Calibration Management System Cory Otto Principal Metrology Engineer, Boston Scientific 10 October 2012.
GW101 presents… Financial Matters Presented by Colonial Central.
Service Management Status 108 th ACCU Meeting 09 June 2015.
CERNAccommodation Facilities (FAC) meeting A.Rozanov CERN ACCU Outlook Accommodation Facilities meetings Sigurd Lettow, Thomas Pettersson,
GW 101 FINANCIAL MATTERS. GW 101: FINANCIAL MATTERS Spring 2015.
League/LSC Monthly Update Wednesday, March 17, 2010.
Housing Service Review Service Report 24 November 2014.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE’06 Conference logistics Alan Silverman – CERN IT Dept., Local Organising Committee.
CERNAccommodation Facilities (FAC) meeting A.Rozanov CERN ACCU Outlook Report on Accommodation Facilities meetings Sigurd Lettow, Catherine.
M. Tiirakari 9 December2009. CERN regular shuttle services CERN Hostel services and WWW booking Miscellaneous 9 December 2009 M. Tiirakari 2 Summary.
1.CERN Hotel 2.Mobility 3.Long-term parking 4.AOB 2 Contents.
Click to add text Dealer Pre-Qualification Information Session STATE OF MICHIGAN Department of Technology, Management and Budget Purchasing Operations.
Section Events IES Annual Planning/Reporting District Events July New Officers and Board of Managers Aug President to Schedule Section BOM Yearly Meeting.
1.Building 42 2.Mobility and Transport – on-going actions 3.CERN Hotel a Program of work b.Statistics c.Ongoing improvements 4.CERN Master Plan.
Accommodation Single occupancy 24-hour internet access and Wifi. Internet password and username has attached with your key.
CERN European Organization for Nuclear Research M. Nonis – ACCU Meeting – 3/12/2008 HOSTEL BOOKING SOFTWARE.
Time Series Analysis Predicting future sales from past numbers.
RICA. Agenda Progress to date Initiatives since Aug 2009 Challenges experienced Planned initiatives going forward.
A pilgrimage of a lifetime introducing WYD KRAKOV March 2014.
Report from Accommodation Facilities meeting ACCU A.Rozanov Outlook Accommodation Facilities meeting Patrick Geeraert, Chris Onions,
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Service Management Status 102 th ACCU Meeting 04 December 2013.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
PROGRESS REPORT ON TURNARROUND PLAN 2015 PRESENTATION BY: PACOFS MANAGEMENT TO DAC FINAL REPORT UPDATES
QUARTERLY TRAVEL COORDINATOR MEETING Department of General Services Statewide Travel Program Tuesday, March 3, 2015.
Agency Charging Statement Overview of Consultation 11 th February 2008.
100 th ACCU meeting – 25 Years of ACCU Michael Hauschild - CERN - 4 June 2013, page 1 25 Years of ACCU Some historical view back in time.
Service Management Status 104 th ACCU Meeting 03 June 2014.
Labour Migration Management in the GMS December 2009 In collaboration with Mekong Migration Network (MMN) Sponsored.
M. Tiirakari 1 9 September CERN Hostel Service 2 As requested by ACCU and the Management -Implementation of the WWW booking -New deals with hotels.
Furniture Prequalification Scheme SCM0771 Briefing 17 th November 2014.
SMB Service Status 111 th ACCU Meeting Tuesday, 8 march 2016.
ACCU Report News and User Issues Darin Acosta (Non-Member State representative) U.S. LHC Users Meeting, Oct.20, 2012ACCU Report ~ Darin Acosta 1.
1.CERN Hotel 2.Mobility 3.Storage 4.Hazardous waste 5.Green spaces 6.AOB 2 Contents.
Community Comments MCA Purpose & History 2015 Performance & Activities 2016 Draft Budget 2016 Delegate Election.
ACCU Meeting - M. Tiirakari June Civil engineering projects 2.Construction and work maintenance 3.HVAC and electricity 4.Design Office and Patrimony.
I.GS Action List following the 96 th meeting held on 15 June 2012 II.CERN Hotel III.Shuttle IV.Bicycle entries V.NOVAE snack service improvement VI.Parking.
1.CERN Hotel 2.Mobility 3.AOB 2 Contents B. 38 (In progress) 1.Formulate and implement a safety plan for the whole building (In progress); Replacement.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
Housing Service Review Service Report 1 June 2015.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
SMB Service Status 113th ACCU Meeting
Food Suppliers Implementation of EDI &PAV March 2010
SMB Service Status 114th ACCU Meeting
89th ACCU Meeting 8th September 2010
4th Housing Service Review Meeting Service Report
SMB Service Status 116th ACCU Meeting
85th ACCU Meeting of 9 September 2009
SMB Service Status 112th ACCU Meeting
SMB Service Status 118th ACCU Meeting
Springbrook Estates Sewer Improvement Area Informational Meeting
Recent developments in GST
Unit 1 School Life. Unit 1 School Life Reporting school activities Task Reporting school activities.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Passenger Mobility Statistics 21 May 2015
Prof. dr. Giedrius Vanagas
Agricultural Marketing
Agricultural Marketing
Agricultural Marketing
Agricultural Marketing
Let’s Talk about Agricultural Marketing
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Agricultural Marketing
Agricultural Marketing
Presentation transcript:

I.GS Action List following the 94 th meeting held on 7 December 2011 II.CERN Hotel I.Program of Work II.Accommodation :Future Evolution III.Ongoing Improvements IV.Occupancy Rates V.Summer Student Programme 2012 VI.Agreement with Saint-Genis Foyer III.Mobility I.Green Monkeys II.Shuttle Service IV.CO4 - Reminder V.Expression of interest by Delegations for new/improved services on CERN sites I.Fitness Club II.Food Shop - Restaurants III.Next > An in-house Conciergerie Service? VI.AOB 2 Contents

3 GS Action List following the 94 th meeting held on 7 December 2011

B. 38 Replacement of old furniture in the rooms: Under process; o Office chairs and desks Under process; Done o Bedside lamps - Done; Done o Telephones - Done; Done o Bedding – Expected date: Done (3 rd, 4 th, 5 th floor); o 2 additional rooms - 1rst and 2 nd floor, single wash basin. B Renovation of the rooms - Replacement of old furniture: Done o Bedding Done; Done. o Office lamps – Done Creation of 5 additional rooms – Expected date: Offices are going to be moved during March 2012 ; Replacement of the wall to wall carpeting in the corridors and the lounges – Expected date: 2013; B. 41 Done 1.Painting in the rooms - Done Done 2.Coat racks – Done APPARTMENTS 2013 Renewal of furniture – Expected date: 2013 Spring 2012 All 3 Buildings: Improvement of general signing – Spring CERN Hotel program of work

A.B38 has to be refurbished, which type of rooms in B 38? 1.Shared rooms? 2.Single with showers? 3.Single with washing basin? 4.Studios? B.What is the most important criteria for you? 1.The price? 2.Not to share your room? 3.To be on CERN site? C.What about external hotels with negotiated prices? 1.Is it your first option? 2.Only if CERN hotel cannot provide a room? D.An external hotel with a shuttle service gives an equivalent level of service to CERN hotel? 1.Yes 2.No 3.Only if the price is the same 5 Accomodation Future Evolution? A first set of questions to be answered

E.Should we extend the maximum duration of the stay (2 months today)? F.Do you prefer being hosted in Saint Genis rather than the CERN hotel? 1.No 2.Yes if the price is lower than the ones in CERN Hotel 3.Yes if I work in Prevessin A more detailed questionnaire will be sent to the CERN hotel customers community 6 Accomodation Future Evolution?

A. Computing related enhancements FIDELIO upgrade planned the night of the 5 th of March 1.Long Term waiting list – Following the FIDELIO upgrade planned the night of the 5 th of March; : “News at CERN Hotel “ 2.Review of the web page with : “News at CERN Hotel “ 3.Booking modifications to be done after the planned upgrade. B. On-going deals with external hotels - Other enhancements 1.Price enquiry to be launched with hotels in the local areas including shuttle service to/from CERN – Technical specification written. C. NEW services Done 1.laundry service for CERN hotel residents - Done Done 2.Washing powder provided with laundry cards- Done Done 3.Short term waiting list (via to avoid queuing at the reception desk) - Done March Prepaid telephone cards available at CERN Hotel reception – Contract under discussion with NAVILLE - Expected date: March CERN Hotel On-going improvements

8 CERN Hotel- Occupancy rates (excluding St Genis Foyer) Mar Apr June Aug Sept OctNov Dec July Jan FebMay Occupancy rates already registered for the six coming months:

9 CERN Hotel- Occupancy rates (excluding St Genis Foyer) Jan Feb Mar Apr May June Aug Sept Oct Nov Dec July * During 2011 Bat 38 has been closed from January until mid-February, having a big impact on the annual average occupancy rate. If Bat 38 would have been opened the global OR would have been 78%. Also take into account the forecasted closure of B38 during November and December 2011.

10 OCSTAT Bulletin - February 2012

o We had last year nearly 290 students; o We should have more or less the same number of students this year hosted in shared and low cost rooms in B38 and in Saint Genis. 11 Summer Student Programme 2012

On – going Improvements 1.We should get up to 151 rooms (81 at present) in total made available for CERN by the end of 2012 (+20 in March; +20 in April; +20 in May; +10 in June) 2.These 71 rooms are single with washbasin (Painting, heating, furniture and floors have been renovated); 3.Rooms cleaned 7days a week; 4.Lounge refurbished; - TV room available as of Spring 2012; 5.30 potential additional rooms at 9.20 Euros /night? 6.Additional rooms to be possibly allocated to CERN in their new building they intend to build on the Technoparc in Saint-Genis by the end of 2013 – beginning Saint – Genis Foyer Confirmation prices are frozen for 3 years unless the price of gas increases by more than 5%.

New mobility alternative New mobility alternative to be considered, already working with the Etat de Geneve, HUG, CICR, Geneva Canton etc. 1.Car pooling between individuals; 2.Can define where you want to go, starting from where, when and how many times; 3.As a driver or a passenger; 4.Green Monkeys supplies the software; 5.Price is fixed per km 0.24CHF/km as a passenger, 0.16CHF if 2 passengers during a trip; 6.Green Monkeys commission per km = 0.04CHF 7.Personnel data remains confidential; 8.Electronic payment via an electronic “porte - monnaie”. 13 Green Monkeys Information Campaign: 20 March in Restaurant No March Restaurant No 2 22 March Restaurant No 3 Between am and 2pm

Shuttle service Overall Performance The Shuttle Service transported in 2011, see Figures [1 & 2]: A quarter of the total visitors received by the visits service, ~ persons; persons for the regular circuits 1,2,5,6 and the shifts circuit; persons for the CERN – airport circuit; persons for VIP visits. In 2011 nearly persons have been transported by the CERN Shuttle Service. It should be noted that certain activities are not accounted for in the activities listed above, such as the regular transport of official documents for the embassies, permanent missions and other official organisations (3 days/ week). In 2011: o 797 groups of visitors o 245 VIP groups

Shuttle service Circuit 3 - Timetable Revision Review following Technical Shut Down Schedule – Forecasted until July

16 CO4 - Reminder docs/opcirc/en/OC-04.pdf

17 CO4 - Reminder

Expression of interest by Delegations for new/improved services on CERN site 18 CERN CERN 1.Rachel Bray from the SA informed us about a new and accessible power lifting installation to all Fitness Club members starting from March 2012;

Expression of interest by Delegations for new/improved services on CERN site 19 CERN CERN 2.On going discussions with the Fire Brigade to make their power lifting room accessible during lunch time (Max. 20 people) ; 3.As a reminder you can also always access, the “Parcours du Bois de Serves” for running.

20 CERN CERN Some discussions are also starting with the Commune de Meyrin to develop a collaboration with the Centre Sportif de Maisonnex and add new sport activities (Fitness courses, power lifting room and review access conditions to the swimming pool) Expression of interest by Delegations for new/improved services on CERN site

FOOD SHOP - Discussions took place with NOVAE regarding a proposal to get fresh food and toiletries via vending machines available 24h/day 7days a week; PRICE FRESH o - 2 main parameters: the PRICE and the food to be really FRESH; o - A test will be made starting from Spring 2012 with fresh food items in the Main Building; o - Toiletries will also be made available at the Hotel Reception. 21

Expression of interest by Delegations for new/improved services on CERN site OTHER SERVICES A possible answer could be an in-house conciergerie as Merck Serono provides to its collaborators covering services such as: ironing, washing, dry cleaning, shoe repairs, optician, keys, taxis, personnel couriers, public transportation tickets, food shopping, gifts (flowers, toys, chocolates, perfume etc.), car washing and servicing for private vehicles. 22

Many thanks for your attention Q&A and Discussion 23