Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov 07.02.2011.

Slides:



Advertisements
Similar presentations
The Lightweight Straw Tube Tracker for PANDA Detector at GSI Andrey Sokolov *,1, James Ritman 1, Peter Wintz 1, Paola Gianotti 2, Dario Orecchini 2 1 Institut.
Advertisements

NSS Requirements Review: Utilities Michelle Everett Lab Coordinator Scientific Activities Division November 12, 2014.
Water Treatment Plant Reflections S 1 Raw Water alum QT S 2 S 4 m 1 S 3 Flocculation Sedimentation p 1 S 5 Clearwell Clean Water S 1 S 1 Raw Water alum.
1 BAM Activity at CERN New welding tools Alternative folding brick: dimension measurements Leakage test measurements in destructive mode Pressure test.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
18-Sep-15S.Movchan Straw manufacturing and QC1 Remove metallization from tape by laser. Part 2 laser mode optimization for Hostaphane RNK 2600 samples.
CONFIDENTIAL Pressure Cure Oven (PCO). CONFIDENTIAL System Overview  Pressure Cure Oven (PCO) or Autoclave is used to minimize voiding and increase adhesion.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th february 2011 CERN1 Straw Material and development.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
1 MicroPot Prototype Work in Progress Jaak Lippmaa Helsinki Group, Helsinki Institute of Physics, University of Helsinki CERN, February, 2006.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
ECAL LED monitoring system upgrade R&D status V. Egorychev, P. Shatalov, A. Zhokhov (ITEP, Moscow, Russia) E. Chernov, Yu. Guz, V. Obraztsov (IHEP Protvino,
ECAL LED monitoring system upgrade Pavel Shatalov ITEP, Moscow, Russia Yuri Guz IHEP Protvino, Russia.
20-Nov-15S.Movchan Straw manufacturing and QC1 Straw machine status straw fabrication option 1: removing metallization from tape edges by laser study straw.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
Qualification of the longitudinal weld of thin wall PET tubes of the straw tracker of the NA62 experiment Master thesis presented 28 th of june 2011 by:
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Straw manufacturing current status T.Enic, Yu.Potrebenikov
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
N. Dixon PH / DT Straw working group meeting Monday 14 December 2010 CERN1 Straw Material and development.
DB Current Status Polenkevich Irina. The general requirements on DB Access through the Internet; DB backup to do automatically (once per week);
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
IPN Lyon ILD integration April 2015 Jean-Christophe Ianigro & Imad Laktineh - IPN Lyon -
Sietz discussion document for Shigeru Kogyo visit v6.pptx 0 HYDRAULIC TUBING – TRACTORS.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status 01_09_2010 machine alignment check by laser level control device machine set up after.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Presented by: De Carlo Livio Supervisor: Scheubel Maud Section: EN/MME-MM.
Neil Dixon PH/DT Dubna July 1010 Straw Material latest news and plans 1.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
10-Jun-16S.Movchan Straw manufacturing and QC1 Straw manufacturing conditions and QC tape and straw parameters specification conditions of straw production.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
S.Movchan Straw manufacturing and QC
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
14 Refrigerant Recovery, Recycling, and Recharging.
We started last December: 32 channels prototype “Julich like” to:
HYDRAULIC TUBING – TRACTORS
S.Movchan Straw manufacturing and QC
S.Movchan Straw manufacturing and QC
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Quality Control in Straw Production
Complementary ISTC Projects #3888, 3889p
Opti-Purge® FAST INFLATION PURGE SYSTEM
S.Movchan Straw manufacturing and QC
S.Movchan Straw manufacturing and QC
Status of straw production straw module assembling
Laminated Tube Making Machine for 90 tubes/min
Wire Diameter Variation
Gluing machine A semi automatic machine to glue emulsion plate on adhesive tape (as done by Japanese colleagues) was realized and delivered to Bologna.
CNGS horn / reflector in 2005: The story of the glass ring insulator
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Presentation transcript:

Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov

“Raw” straw 139 straws (2700 mm) are ready. 46 ring samples from the beginning of straws (5 mm width) and 22 ones from the end of straws were broken off on base material ~ 70 straws from one tape roll “raw” straws per day Example of a bar code 07/02/11Yu.Potrebenikov2

“Raw” straw quality A piece of the straw #3 remain alive at 7 Atm overpressure more then 10 days (end plug is formed by thermo glue) Blue – start of the straw; Red – end of the straw A piece of the straw #14 (~40 cm) remain Alive at 9 Atm overpressure more than 1 min; 1,5 mm elongation after break 07/02/11Yu.Potrebenikov3 We propose min=3 mm

“Raw” straw quality Blue – start of the straw; Red – end of the straw 07/02/11Yu.Potrebenikov4 Min=4 kg Min=3 mm

Last configuration of the welding machine Thermo stabilization zone near welding point New visualization: 2 microscope Visual control Frequency control Automatic (computer) control 07/02/11Yu.Potrebenikov5

Thermo stabilization of the welding area General cooling Local sonotrode cooling ( air blowing by thin injector ) Small air overpressure into straw ( diameter stabilization ) 07/02/11Yu.Potrebenikov6

Straw quality before and after modification of the welding machine Straw #83: only 5 rings from 26 broken along the seam 07/02/11Yu.Potrebenikov7

Straw diameter distribution Blue – star of the straw; Red – end of the straw More than 95% straws have the same diameter 9.77 mm (20 microns precision) 07/02/11Yu.Potrebenikov8

Straw leakage Straw and PVC tube with 4 Atm He overpressure in cooled boiled water 07/02/11Yu.Potrebenikov9

Straw plugging and connection for long term overpressure test 07/02/11Yu.Potrebenikov10

Conclusion and plans 1.After modification of the welding machine straw quality seams good 2.Long term overpressure test and leakage test are under preparation 3.It is necessary to produce more than 500 straw till the end of February to deliver their to CERN at the beginning of March 4.It is necessary to define minimal straw quality test before sending straws to CERN and minimal straw quality test at CERN before their installation into Module-0 07/02/11Yu.Potrebenikov11