1 -TBWG next meeting 8 - Presentation of Parties, in particular on action 17 and action 19 (TBWG-15), including: Progress of work Impact on TBMs of frame.

Slides:



Advertisements
Similar presentations
Creating a Schedule Using Network Diagrams; Defining Task Durations
Advertisements

Ensure Vendor/Engineer of Choice Product Quality
J-1 Next Steps Jordan Dentz. J-2 Assignments 1. Establish core continuous improvement team (April 21) 2. Current state value stream map (draft April 28;
US TBM Activities Update 1- Quick background 2- Recent Activities Mohamed Abdou FNST Meeting held at UCLA, August 2-4,
US TBM Activities and Collaboration Discussion Mohamed Abdou FNST Meeting held at UCLA, August 18-20, 2009.
US ITER TBM DCLL TBM Design, Analysis and Development C. Wong, M. Dagher, S. Smolentsev and S. Malang FNS/TBM Meeting UCLA, September 19-20, 2007.
Suggested US Plans and Strategy for ITER Test Blanket Mohamed Abdou Presented at APEX/TBM Meeting, UCLA, November 3-5, 2003.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
1 Brief Status of ITER TBM A High-Level Ad Hoc Group (AHG) met April 10-11, per request of the ITER Council. In that meeting, Parties intentions were stated,
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Chapter 3: The Project Management Process Groups
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Tom Lindstrom TL TooLs, Inc
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Project Management Considerations B. Nelson US ITER TBM Meeting INEL August 11, 2005.
RUP Fundamentals - Instructor Notes
Workshops Tech Com: Progress Reports Terminology from the first class period Goal: What it is you are trying to accomplish; the bottom line. Milestone:
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Briefings to the Materials Community on ITER Test Blanket Module (TBM) Mohamed Abdou August 11, 2003 Outline 1.What is going on with ITER and TBWG 2.Other.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
WBS activity and Cost Summary (Focus on Design) Clement Wong TBM Conference Call Oct. 27, 2005.
Dec 12-14, 2005TBM Planning and Costing Meeting DCLL R&D Evaluations Summary Compiled by Neil Morley for the TBM Planning and Costing Meeting Dec 12-14,
PLANNING AND SCHEDULING
HFT project Overview and Status October 14, 2010 F.Videbaek BNL.
Electronic Engineering Department Final Year Projects September 2008.
Special assignment, OFES, USA 1 ITER, Cadarache, January 26, 2007 Clement Wong, General Atomics, USA Valery Chuyanov, Chang Shuk Kim, at this time the.
TBM Costing Lessons from Recent ITER Activities Scott Willms Los Alamos National Laboratory Presented at INL August 10, 2005.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
1 U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, Overview of R&D, Time Schedule, and Cost Estimation M. Abdou (25 min.) 2.Possible.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
1 VLT Research Highlights ITER Test Blanket Module (TBM) M. Abdou and the ITER-TBM Team Outline 1.Introduction and TBWG activities 2.Technical planning.
Conference Call, June 23, 2005 Remarks on US Costing Activities for the US ITER-TBM Mohamed Abdou.
IMPACT OF FRAME DESIGN AND FRAME REPLACEMENT PROCEDURE ON DCLL TBM By Mo Dagher Presented by Clement Wong TBWG-16 meeting, November, 15-17, 2005, Beijing,
Preliminary Project Descriptions/Outline Specifications
Project Management Process Transition & Closure Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team.
DCLL TBM R&D Summary Compiled by Neil Morley for the TBM Conference Call Oct 27, 2005.
Pacific Northwest National Laboratory U.S. Department of Energy Initial Cost Estimates for Development of DCLL TBM Ferritic Steel Structural Components.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
US Test Blanket Module Partially Integrated Testing Sandia is a multiprogram laboratory operated by Sandia Corporation, a Lockheed Martin Company, for.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
1 10% Worst Performing Circuits Reliability Program SWEDE Conference San Antonio, TX May 10, 2007 Kenton M. Brannan, P.E.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
Various Strategies for DCLL in the US Technology Program Poor ITER utilization (Lowest Cost Scenario) - Support EU HCLL effort, no independent DCLL TBM.
How the NCSX Project Does Business
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
NCSX Interface Control Management Plan and Implementing Procedure 003 Peer Review December 19, 2002.
UCLA - March 8, 2006 US TBM Cost Estimate Status March 8, 2006 Tom Mann.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
1 Discussion with Drs. Kwon and Cho UCLA-NFRC Collaboration Mohamed Abdou March 27, 2006.
SOFTWARE PROJECT MANAGEMENT
Highlights of US ITER TBM Technical Plan and Cost Estimates (and Impact of International Collaboration) Mohamed Abdou and the U.S. Team TBWG-17 Presented.
SCT Project Management Issues
Some General Guidelines for the US TBM Costing
Introductory Remarks and Meeting Goals
Status of the Planning Working Group’s (PWG) Efforts
Executive Committee Meeting April 2010
Overview of the FEPAC Accreditation Process
U.S. Presentation in TBWG-16 Beijing, China November 15 – 17, 2005
Adaptive Product Development Process Framework
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Remarks on US Costing Activities for the US ITER-TBM
Mohamed A. Abdou Summary, Approach and Strategy (M. Abdou)
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
Project Management Considerations
Compiled by Neil Morley for the TBM Conference Call Nov. 17, 2005
Presentation transcript:

1 -TBWG next meeting 8 - Presentation of Parties, in particular on action 17 and action 19 (TBWG-15), including: Progress of work Impact on TBMs of frame design and of TBM replacement procedure (action 17) For each TBM, preliminary detailed R&D program, including timescale and milestones, up to the installation in ITER (2015), estimations of costs, comments on QA, comments on collaboration expected with other Parties (action 19) -Tom Mann joins us - Conference call emphasis Report of Material Group trip to Europe Structural Material Strategy Engineering design and ancillary equipment Progress reports on R&D and other areas - Date for next physical meeting (Dec or or 14-15?) - Reminders of general costing guidelines - Reminder of Milestones Introductory Remarks (M. Abdou) ITER-TBM Conference Call - October 27, 2005

2 Some General Guidelines for the US TBM Costing Cost for the Reference Case Cost is for the period between now and the shipment of the TBM deliverables (Test articles and ancillary equipment) in 2015 for DAY ONE ITER operation. The period is 10 years from 2006 to 2015 The cost is the total cost for the TBM project (based on the Reference designs/deliverables) including R&D, design, engineering, fabrication, qualification, etc., as well as the cost of interface with ITER and other parties. The deliverables are based on the Reference Designs described in the Design Summary Documents. The DCLL Reference Case has a PbLi exit temperature of 470ºC and a test module that occupies half a port. For the HCCB: submodule that has a size of 1/3 of one-half port and uses the EU (or Japan) first wall/box (first wall/box is not part of the US deliverables) The R&D Cost includes all costs related to the reference design that occur within the next 10 year period whether they are related to the first (Day ONE) Test Articles or subsequent test articles. But the Cost of the deliverables includes only the cost of the First Test Article and associated equipment. The US effort should take advantage of the R&D efforts in other parties. R&D performed by other parties and available to the US should, in general, not be duplicated by the US and should be costed separately. Cost estimates should state clearly what R&D done by the other parties is essential to the US TBM project. (agreed to August 31, 2005)

3 US ITER TBM Costing Activity Milestones 12-Aug-05Costing Activity Initiated 31-Aug-05WBS established for Level 6 and lower Responsible persons for Level 6 and lower assigned 7-Sep-05WBS for Level 6 and lower revised 9-Sep-05Conceptual design summaries for DCLL and HCCB issued 6-Oct-05Initial schedule and base cost estimate for WBS level 6 of DCLL and HCCB 27-Oct-05Initial schedule and base cost estimate for engineering design, procurement/fabrication, and ancillary equipment 7-Nov-05R&D decision criteria established 30-Nov-05Complete revised schedule and cost estimate for WBS level 6 and lower (include contingency factor) Dec-05“Physical” Meeting (all information about costing will be presented and discussed) 16-Dec-05R&D priorities finalized 13-Jan-06 Initial Draft Costing Activity Report Due 15-Feb-06Complete Draft of Final Costing Activity Report Feb-06Physical meeting (internal review of draft report) 1-Mar-06Complete incorporating comments into the Report 15-Mar-06Send Final TBM Cost Estimate Report to DOE 28-Mar-06“External” review