PS ERC 1 Reactive Power Considerations in Linear Load Flow with Applications to Available Transfer Capability Pete Sauer (With a lot of help from Santiago.

Slides:



Advertisements
Similar presentations
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Advertisements

EE 369 POWER SYSTEM ANALYSIS
EE 369 POWER SYSTEM ANALYSIS
Announcements Be reading Chapter 6, also Chapter 2.4 (Network Equations). HW 5 is 2.38, 6.9, 6.18, 6.30, 6.34, 6.38; do by October 6 but does not need.
Voltage Security Margin Assessment Professor Dr. Garng Huang PS ERC.
ECE 333 Renewable Energy Systems Lecture 14: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
Available Transfer Capability Determination Chen-Ching Liu and Guang Li University of Washington Third NSF Workshop on US-Africa Research and Education.
1 PS ERC Reactive Power and Voltage Control Peter W. Sauer Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 333 Renewable Energy Systems Lecture 13: Per Unit, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
1 Voltage Collapse Animation (AC) Created by Peter W. Sauer Department of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
EE369 POWER SYSTEM ANALYSIS
Computing Power System Steady-state Stability Using Synchrophasor Data Karl Reinhard ECE Power and Energy Group Colloquium 29 Oct 12 work with Peter Sauer.
Efficient Available Transfer Capability Analysis Using Linear Methods
Voltage Collapse M. H. Sadeghi Winter 2007 KNTU. Power System Stability IEEE: Power system stability is defined as the capability of a system to maintain.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Optimization for Operation of Power Systems with Performance Guarantee
Peak RCCo Performance Metrics Draft –November 2013.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
1 Security assessment: decision support tools for power system operators James D. McCalley, Iowa State University, Ames, Iowa September.
Announcements Please read Chapter 4 HW 1 is due now
PS ERC 1 Power System Control: Enhancing the Human-System Interface The Mathematics of August 14 th 2003: How Complex? Tom Overbye Dept. of Electrical.
ATC/TTC Basics Transmission Customer Forum Doug McLaughlin 9/22/06 Transmission Customer Forum Doug McLaughlin 9/22/06.
Announcements Homework #4 is due now Homework 5 is due on Oct 4
AFC METHODOLOGY EMS USER GROUP SEP 12, 2004 AFC – New Developments EMS USER GROUP Sep
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
ECE 476 Power System Analysis Lecture 11: Ybus, Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 476 Power System Analysis Lecture 15: Power Flow Sensitivities, Economic Dispatch Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
Lecture 13 Newton-Raphson Power Flow Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Lecture 11 Power Flow Professor Tom Overbye Special Guest Appearance by Professor Sauer! Department of Electrical and Computer Engineering ECE 476 POWER.
ECE 476 Power System Analysis Lecture 14: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
STATE ESTIMATOR QUALITY TRACKING IN BC Hydro EMS IMPLEMENTATION Dr. DJORDJE ATANACKOVIC, P.Eng. Engineering Team Leader, Power system Applications, Grid.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Western Area Power Administration Transmission Customer Meeting October 17, 2007.
ECE 476 Power System Analysis Lecture 13: Power Flow Prof. Tom Overbye Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Dept. of Electrical and Computer Engineering University of Illinois at Urbana-Champaign.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems Prof. Hao Zhu Special thanks to Dr. Kai Van Horn Dept. of Electrical and Computer Engineering.
Chapter 4-8 Maximum Power Transfer Superposition.
Lecture 15 Economic Dispatch Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
ELEN 3441 Fundamentals of Power Engineering Spring Lecture 10: Power-Flow studies Instructor: Dr. Gleb V. Tcheslavski Contact:
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
0 Balanced 3 Phase (  ) Systems A balanced 3 phase (  ) system has three voltage sources with equal magnitude, but with an angle shift of 120  equal.
Lecture 14 Power Flow Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Announcements Homework 7 is 6.46, 6.49, 6.52, 11.19, 11.21, 11.27; due date is October 30 Potential spring courses: ECE 431 and ECE 398RES (Renewable Electric.
ECE 476 POWER SYSTEM ANALYSIS
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
ISO New England System R&D Needs
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
Load Flow Studies Eng. Edvan Moyo BEng, MEng, MBA
ECE 333 Green Electric Energy
ECEN 460 Power System Operation and Control
ECEN 460 Power System Operation and Control
Security assessment: decision support tools for power system operators
ECE 576 Power System Dynamics and Stability
ECEN 615 Methods of Electric Power Systems Analysis
Maximum Power Transfer Superposition
ECEN 615 Methods of Electric Power Systems Analysis
ECEN 460 Power System Operation and Control
Presentation transcript:

PS ERC 1 Reactive Power Considerations in Linear Load Flow with Applications to Available Transfer Capability Pete Sauer (With a lot of help from Santiago Grijalva) University of Illinois at Urbana-Champaign PS ERC Internet Seminar December 3, 2002 © 2002 University of Illinois

PS ERC 2 Overview Linear load flow methods Linear load flow methods Linear transfer capability calculations Linear transfer capability calculations Reactive linear ATC calculations Reactive linear ATC calculations Examples Examples Conclusions Conclusions

PS ERC 3 Linear Load Flow An approximation used to estimate the result of a change in operating conditions from some base case An approximation used to estimate the result of a change in operating conditions from some base case Small change sensitivities Small change sensitivities Large-change sensitivities Large-change sensitivities

PS ERC 4 PTDFs Power Transfer Distribution Factors (PTDFs) indicate how “injection power” flows in the lines Power Transfer Distribution Factors (PTDFs) indicate how “injection power” flows in the lines A 5% PTDF for a given injection set and line means that 5% of the injection flows in that line A 5% PTDF for a given injection set and line means that 5% of the injection flows in that line Principle is simple current division Principle is simple current division

Base Case 5

P12 = 10 MW 6

PS ERC 7 Numerical PTDFs Real power distribution factors for real power transfer from area 1 to 2 (area 2 reduced by 10 MW) Real power distribution factors for real power transfer from area 1 to 2 (area 2 reduced by 10 MW)  jk,sr =  P jk /  P sr  12,12 = 0.4,  13,12 = 0.6,  32,12 = 0.6  12,12 = 0.4,  13,12 = 0.6,  32,12 = 0.6 (40% of the transfer goes down line 12, 60% goes down line 13, and 60% goes down line 32) (40% of the transfer goes down line 12, 60% goes down line 13, and 60% goes down line 32)

PS ERC 8 Use these to predict the result of a 100 MW transaction from 1 to 2 P 12 = 0+0.4*100 = 40 MW P 13 = 0+0.6*100 = 60 MW P 32 = 0+0.6*100 = 60 MW

P12 = 100 MW OK, but look at the VARS 9

PS ERC 10 How about 200 MW? P 12 = 0+0.4*200 = 80 MW P 13 = 0+0.6*200 = 120 MW P 32 = 0+0.6*200 = 120 MW

P12 = 200 MW OK, but look at the VARS 11

PS ERC 12 Behavior of Distribution Factors Close to Collapse p p* p 0 1.0

PS ERC 13 Analytical Distribution Factors These PTDFs can be analytically constructed from line admittances only, or line admittances plus base case operating point values. These PTDFs can be analytically constructed from line admittances only, or line admittances plus base case operating point values. There are also “Line Outage Distribution Factors” that estimate the change in flows due to a line outage. There are also “Line Outage Distribution Factors” that estimate the change in flows due to a line outage.

PS ERC 14 Total Transfer Capability (TTC) Specify sending point or points Specify sending point or points Specify receiving point or points Specify receiving point or points Increase sending power injection Increase sending power injection Decrease receiving power injection Decrease receiving power injection Monitor security limits Monitor security limits Stop when limit reached Stop when limit reached

PS ERC 15 Computation Linear algebraic Linear algebraic Non-linear algebraic Non-linear algebraic Time domain simulation Time domain simulation

PS ERC NERC definitions Transmission Reliability Margin (TRM) is supposed to account for uncertainty in conditions and model Transmission Reliability Margin (TRM) is supposed to account for uncertainty in conditions and model Capacity Benefit Margin (CBM) is supposed to account for reliability criteria (neighboring reserve etc.) Capacity Benefit Margin (CBM) is supposed to account for reliability criteria (neighboring reserve etc.)

PS ERC 17 TRM Components Forecasting errorForecasting error Data uncertaintyData uncertainty – Impedances – Ratings – Measurements

PS ERC 18 TRM Alternatives Fixed MW amount Fixed MW amount Fixed % Fixed % Resolve with limits reduced by some amount (I.e. 4%) Resolve with limits reduced by some amount (I.e. 4%)

PS ERC 19 CBM Issues Loss of the biggest unit will result in import from neighbors. There must be capability to allow this import. Loss of the biggest unit will result in import from neighbors. There must be capability to allow this import. Some companies use CBM = 0 and include the loss of units in the contingency list. Some companies use CBM = 0 and include the loss of units in the contingency list.

PS ERC 20 Available Transfer Capability ATC = TTC - TRM - CBM - ETC ATC = TTC - TRM - CBM - ETC Available = Total - Margins - Existing Available = Total - Margins - Existing

PS ERC 21 TTC Computation Errors Linear vs nonlinear flow calculations Linear vs nonlinear flow calculations MW vs MVA limits MW vs MVA limits Neglecting voltage constraints Neglecting voltage constraints Neglecting stability constraints Neglecting stability constraints

PS ERC 22 Estimating Maximum Power Transfers Recall the 3-bus example: Recall the 3-bus example: Real power distribution factors for real power transfer from area 1 to 2 Real power distribution factors for real power transfer from area 1 to 2  12,12 = 0.4,  13,12 = 0.6,  32,12 = 0.6  12,12 = 0.4,  13,12 = 0.6,  32,12 = 0.6 Maximum transfer 1-2 is minimum of: Maximum transfer 1-2 is minimum of: 100/.4 = 250, 130/.6 = 217, 140/.6 = /.4 = 250, 130/.6 = 217, 140/.6 = 233

P12 = 217 MW 23

P12 = 203 MW 24

P12 = 212 MW 25

PS ERC 26 P12 error Linear vs nonlinear error plus MW vs MVA error = 217 MW vs 203 MW (7%) Linear vs nonlinear error plus MW vs MVA error = 217 MW vs 203 MW (7%) Linear vs nonlinear error only = 217 MW vs 212 MW (2%) Linear vs nonlinear error only = 217 MW vs 212 MW (2%)

LIMITING CIRCLE Q jk P jk (P jk 0, Q jk 0 )  P jk * Linear ATC  P sr * =  P jk * /  jk,sr 27

PS ERC 28 Line power flow relations jk j X jk P + j Q jk P kj + jQ kj P jk = V j V k B jk sin (  j -  k ) P jk = V j V k B jk sin (  j -  k ) Q jk = V j 2 B jk - V j V k B jk cos (  j -  k ) P jk 2 + (V j 2 B jk - Q jk ) 2 = (V j V k B jk ) 2 kk VkVk jj VjVj

jk Bus j j X P jk + j Q jk P kj + jQ kj jj VjVj kk VkVk Bus k R jk + -j(1/B jj ) -j(1/B kk ) P jk = + V j 2 G jk - V j V k Y jk cos (  j -  k +  jk ) Q jk = - V j 2 B jj - V j 2 B jk - V j V k Y jk sin (  j -  k +  jk )  (P jk -V j 2 G jk ) 2 +(Q jk +V j 2 B jj +V j 2 B jk ) 2 = (V j V k Y jk ) 2 Line power flow relations 29

Limiting Circle: P jk 2 + Q jk 2 = (S jk max ) 2 P jk Operating and Limiting Circles Operating Circle: (P jk -V j 2 G jk ) 2 +(Q jk +V j 2 B jj +V j 2 B jk ) 2 = (V j V k Y jk ) 2 r = S jk max (P jk0, Q jk0 ) Q jk r =S jk0 (P jk *, Q jk *) 30

Solutions Solve: (P jk -V j 2 G jk ) 2 +(Q jk +V j 2 B jj +V j 2 B jk ) 2 = (V j V k Y jk ) 2 P jk 2 + Q jk 2 = (S jk max ) 2 Define: - M 0 2 = P jk0 2 +Q jk0 2 -S jk0 2 A = (P jk0 2 + Q jk0 2 ) B = - P jk0 ((S jk max ) 2 -M 0 2 ) C = [(S jk max ) 2 -M 0 2 ] 2 /4 - Q jk0 2 (S jk max ) 2 Then: P jk * = [ - B  (B 2 -4AC) 1/2 ]/2A Q jk *= [(S jk max ) 2 - P jk * 2 ] 1 / 2 31

LIMITING CIRCLE OPERATING CIRCLE (P jk *, Q jk * ) #1 r = S k max Q jk P jk r =S jk0 (P jk0,Q jk0 ) (P jk *, Q jk *) #2  P jk *  P sr * =  P jk * /  jk,sr Reactive Linear ATC 32

Feasibility in Reactive Linear ATC Computation Q jk P jk OPERATING CIRCLE (0, V j 2 Y jk ) B C A j B C D A P jk Q jk Limiting circle I Limiting circle II (0, V j 2 Y jk ) A to B (Thermal limit) A to B to C (Feasibility limit) 33

PS ERC 34 Test for infeasible cases in reactive linear ATC computation [(±V j 2 G jk +V j V k Y jk ) 2 + (-V j 2 B jj -V j 2 B jk ) 2 ] 1/2 < S jk max [(±V j 2 G jk +V j V k Y jk ) 2 + (-V j 2 B jj -V j 2 B jk ) 2 ] 1/2 < S jk max  An estimate of voltage collapse limits.

Estimation of Reactive Power Support Consider: Q jk = Q jk0 + [S jk0 2 - (P jk - P jk0 ) 2 ] 1/2 Valid for line complex flow if voltages ~ constant. Then, for a variation in the injection at bus i:  Q jk = Q jk0 -Q jk 0 +[S jk0 2 -(  jk,sr  P sr +P jk 0 -P jk0 ) 2 ] 1/2 Therefore, the new reactive power at bus j: Q j = Q j 0 +  k {Q jk0 -Q jk 0 +[S jk0 2 -(  jk,sr  P sr +  P jk 0 -P jk0 ) 2 ] 1/2 } All terms are known except  P sr which is independent.  A way to estimate the reactive power support required for large variations in active power transactions. 35

Base Case 36

7-bus system 38

7- bus system: P

PS ERC 40 WSCC Summer Case Forty-two transfers across the BC Hydro, BPA, and PG&E control areas were simulated. The simulation did not include contingency sets. The model had 7,119 buses, and 9,630 lines and transformers. Total generation was 120GW. Simulations run by PowerWorld Corp.

41

PS ERC 42 NYISO Summer case Fifty transfers across different control areas in the NYISO The simulation did not include contingency sets. The model had about 40,000 buses and included more than 6,000 generating units and 139 control areas. Simulations run by PowerWorld Corp.

43

PS ERC 44 Transmission Loading Relief (TLR) Based on the PTDF concept Based on the PTDF concept Could benefit from consideration of reactive power in loading Could benefit from consideration of reactive power in loading

PS ERC 45 The future of ATC The ATC concept has other problems The ATC concept has other problems – chaining does not work – updates are difficult What will the new Standard Market Design rules use? What will the new Standard Market Design rules use?

PS ERC 46 Conclusions The inclusion of reactive power considerations in a linear ATC calculation can reduce error in ATC. The inclusion of reactive power considerations in a linear ATC calculation can reduce error in ATC. It may provide a way to estimate the proximity to voltage collapse limits due to a transaction. It may provide a way to estimate the proximity to voltage collapse limits due to a transaction. The inclusion of reactive power considerations in a linear ATC calculation is easy. The inclusion of reactive power considerations in a linear ATC calculation is easy.