Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team ATHIC2012, Busan,

Slides:



Advertisements
Similar presentations
Update on Status of Tier-1 GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
Advertisements

Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
DOSAR Workshop VI April 17, 2008 Louisiana Tech Site Report Michael Bryant Louisiana Tech University.
T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Tier 2 Prague Institute of Physics AS CR Status and Outlook J. Chudoba, M. Elias, L. Fiala, J. Horky, T. Kouba, J. Kundrat, M. Lokajicek, J. Svec, P. Tylka.
March 27, IndiaCMS Meeting, Delhi1 T2_IN_TIFR of all-of-us, for all-of-us, by some-of-us Tier-2 Status Report.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
RAL Site Report HEPiX Fall 2013, Ann Arbor, MI 28 Oct – 1 Nov Martin Bly, STFC-RAL.
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
Global Science experiment Data hub Center Oct. 13, 2014 Seo-Young Noh Status Report on Tier 1 in Korea.
COMSATS Institute of Information Technology, Islamabad PK-CIIT Grid Operations in Pakistan COMSATS Ali Zahir Site Admin / Faculty Member ALICE T1/2 March.
ALICE data access WLCG data WG revival 4 October 2013.
Preparation of KIPT (Kharkov) computing facilities for CMS data analysis L. Levchuk Kharkov Institute of Physics and Technology (KIPT), Kharkov, Ukraine.
BINP/GCF Status Report BINP LCG Site Registration Oct 2009
11 ALICE Computing Activities in Korea Beob Kyun Kim e-Science Division, KISTI
Computing Infrastructure Status. LHCb Computing Status LHCb LHCC mini-review, February The LHCb Computing Model: a reminder m Simulation is using.
November 16, 2012 Seo-Young Noh Haengjin Jang {rsyoung, Status Updates on STAR Computing at KISTI.
LCG Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete 1 Service Challenge Phase 4: Piano di attività e impatto sulla.
ScotGRID:The Scottish LHC Computing Centre Summary of the ScotGRID Project Summary of the ScotGRID Project Phase2 of the ScotGRID Project Phase2 of the.
INDIACMS-TIFR Tier 2 Grid Status Report I IndiaCMS Meeting, April 05-06, 2007.
GStore: GSI Mass Storage ITEE-Palaver GSI Horst Göringer, Matthias Feyerabend, Sergei Sedykh
1 1APCTP LHC Konkuk University. Introduction to GSDC Project Activities in 2009 Strategies and Plans in 2010 GSDC office opening ceremony CERN.
Romanian Tier-2 Federation One site for all: RO-07-NIPNE Mihai Ciubancan on behalf of IT Department.
Sejong STATUS Chang Yeong CHOI CERN, ALICE LHC Computing Grid Tier-2 Workshop in Asia, 1 th December 2006.
Grid Lab About the need of 3 Tier storage 5/22/121CHEP 2012, The need of 3 Tier storage Dmitri Ozerov Patrick Fuhrmann CHEP 2012, NYC, May 22, 2012 Grid.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea.
COMSATS Institute of Information Technology, Islamabad PK-CIIT Grid Operations in Pakistan COMSATS Dr. Saif-ur-Rehman Muhammad Waqar Asia Tier Center Forum.
KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.
Analysis in STEP09 at TOKYO Hiroyuki Matsunaga University of Tokyo WLCG STEP'09 Post-Mortem Workshop.
KISTI-GSDC SITE REPORT Asia Tier Center KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.
CERN IT Department CH-1211 Genève 23 Switzerland t Frédéric Hemmer IT Department Head - CERN 23 rd August 2010 Status of LHC Computing from.
INFN-T1 site report Andrea Chierici On behalf of INFN-T1 staff HEPiX Fall 2013.
Handling ALARMs for Critical Services Maria Girone, IT-ES Maite Barroso IT-PES, Maria Dimou, IT-ES WLCG MB, 19 February 2013.
Xrootd Monitoring and Control Harsh Arora CERN. Setting Up Service  Monalisa Service  Monalisa Repository  Test Xrootd Server  ApMon Module.
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Status of the Bologna Computing Farm and GRID related activities Vincenzo M. Vagnoni Thursday, 7 March 2002.
Status of India CMS Grid Computing Facility (T2-IN-TIFR) Rajesh Babu Muda TIFR, Mumbai On behalf of IndiaCMS T2 Team July 28, 20111Status of India CMS.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
Site Report: Prague Jiří Chudoba Institute of Physics, Prague WLCG GridKa+T2s Workshop.
Tier-1 Andrew Sansum Deployment Board 12 July 2007.
Doug Benjamin Duke University. 2 ESD/AOD, D 1 PD, D 2 PD - POOL based D 3 PD - flat ntuple Contents defined by physics group(s) - made in official production.
STATUS OF KISTI TIER1 Sang-Un Ahn On behalf of the GSDC Tier1 Team WLCG Management Board 18 November 2014.
JINR WLCG Tier 1 for CMS CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.
Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.
CERN IT Department CH-1211 Genève 23 Switzerland t The Tape Service at CERN Vladimír Bahyl IT-FIO-TSI June 2009.
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
Data transfers and storage Kilian Schwarz GSI. GSI – current storage capacities vobox LCG RB/CE GSI batchfarm: ALICE cluster (67 nodes/480 cores for batch.
Development of a Tier-1 computing cluster at National Research Centre 'Kurchatov Institute' Igor Tkachenko on behalf of the NRC-KI Tier-1 team National.
BNL dCache Status and Plan CHEP07: September 2-7, 2007 Zhenping (Jane) Liu for the BNL RACF Storage Group.
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
KISTI activities and plans Global experiment Science Data hub Center Jin Kim LHCOPN-ONE Workshop in Taipei1.
Global Science experimental Data hub Center April 25, 2016 Seo-Young Noh Status Report on KISTI’s Computing Activities.
UK Status and Plans Catalin Condurache – STFC RAL ALICE Tier-1/Tier-2 Workshop University of Torino, February 2015.
Pledged and delivered resources to ALICE Grid computing in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Report from US ALICE Yves Schutz WLCG 24/01/2007.
GSDC: A Unique Data Center in Korea for Fundamental Research Global Science experimental Data hub Center Korea Institute of Science and Technology Information.
Availability of ALICE Grid resources in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Dynamic Extension of the INFN Tier-1 on external resources
COMPUTING FOR ALICE IN THE CZECH REPUBLIC in 2015/2016
COMPUTING FOR ALICE IN THE CZECH REPUBLIC in 2016/2017
LCG Service Challenge: Planning and Milestones
October 28, 2013 at 14th CERN-Korea Committee, Geneva
Kolkata Status and Plan
Update on Plan for KISTI-GSDC
KISTI-GSDC Tier-1 SITE REPORT
Luca dell’Agnello INFN-CNAF
RDIG for ALICE today and in future
Update from the HEPiX IPv6 WG
Presentation transcript:

Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team ATHIC2012, Busan, Republic of Korea

Current Status – Resource: Nodes, Services and TAPE – Operation – Network Plan – Next Milestones – Pledges – Network upgrades Conclusion KISTI-GSDC/ Outline

GSDC Tier-1 Team KISTI-GSDC/ ROLEName Representative Haeng Jin Jang System Administration Heejun Yoon Seunghee Lee Gianni Mario Ricciardi Storage: Disk & Tape Heejun Yoon Sang-Oh Park Network Hyeongwoo Park KISTI support Power supply & Coolling KISTI support Grid Middleware Il-Yeon Yeo Sang-Un Ahn KiAF support & Production Sang-Un Ahn Sul-Ah Ahn

Activities In March, approved as a Tier-1 candidate for ALICE by WLCG Overview Board and acquired full membership for ALICE at ALICE Collaboration Board In June, the first demonstration plan for Tier-1 submitted to WLCG Management Board – The first one revised, then the second version has been prepared reflecting the comments by WLCG and our recent progress In August, agreement on the collaboration with KIT (DE) especially for TAPE library: set-up and test KISTI-GSDC/

Resources: Nodes & Services CPUs – Intel Xeon 12 physical cores -> 24 logical cores w/ HT per Worker Nodes (WN) – Total ~1500 cores (~17k HepSpec06) dedicated to Tier-1: 62 WNs – Capable to run ~1500 jobs (1 job per 1 logical core) Disks – 1000 TB disks: Hitachi + EMC 2 EMI migration in progress (on SL6) – Services w/ gLite 3.2 middleware (on SL5) in production – 2 CEs, Top|site BDII, VOBOX, XROOTD (1 redirector and 9 pools) KISTI-GSDC/ Storage Element MonALISA

Resources: TAPE TAPE library pre-test (FS + TM + XROOTD) completed – IBM test (Mar. 2012): GPFS+TSM+XROOTD – ORACLE test (Aug. 2012): QFS+SAM+XROOTD IBM TAPE library: hardware delivery and installation on going – 1PB media capacity (extendable up to 3 PB): 4(+1) Modules – Min 1.92 GB/s throughput: 8 tape drives 240 MB/s per drive) – Dual robot arms = Single robot arm + 1 backup arm – 3 years maintenance support + recovery services within 24hrs TSM and GPFS installation and configuration in progress – Overall functioning test will start on 20 th November For cache (allows prompt access to archived data), additional disk pool (as a buffer) is required – ALICE request: Min. 200 TB; max. 400 TB for pA – 220 TB is now assigned to the pool KISTI-GSDC/

Tape Storage System 7

Operation KISTI-GSDC/ On service for ALICE as WLCG Tier-1 candidate since March in 2012 – Test-bed from October in 2010 – Capable to run ~1500 jobs, >7000 jobs done everyday – Up to now, total 820k jobs performed successfully – Site Availability/Reliability reported monthly by WLCG MB since Aug – PBS instability issue affects Availability/Reliability March – October in 2012 Internal network issue solved 1, ,000 # of Jobs Stable status Active jobs Done jobs

Network to LHCOPN KISTI-GSDC/ Currently, 1Gbps (dedicated) connection is established CERN-KISTI 10Gbps connection is required to join LHC OPN (Optical Private Network) among Tier-0 (CERN) and other Tier-1s Private Networks among Tier-0/1 sites

Network Traffic Status KISTI-GSDC/ Start of torrent-based ALICE package distribution service: Observed large incoming traffic (maximal 5 minutes) after Dedicated 1Gbps established GLORIAD-KR – CERN – ‘Yearly’ graph (1 Day Average) – Correlation with # of active jobs Incoming Traffic in bps Outgoing Traffic in bps Maximal 5 minutes Incoming Traffic Maximal 5 minutes Outgoing Traffic Functional test Internal network issue solved

Next Milestones KISTI-GSDC/ TAPE library set-up and data transfer test (to be ready before pA) 2.Upgrading plan for network bandwidth > 3Gbps (up to 10Gbps) 3.Plan for 24 hours on-call: shift scheme and notification methods (SMS, , etc.) —Started internal discussion for the detailed plan 4.Tier-1 service stability test: demonstration at least 2 months (>90%)

Network Upgrade KISTI-GSDC/ In 2013, dedicated 2Gbps will be established Plan to upgrade up to 10Gbps connection in a few years

Pledged Pledged resources – Based on WLCG & ALICE Collaboration MoU – Provides 2000 cores for Tier-1, 2PB for TAPE by 2014 – Meeting ALICE requirement by 2013 KISTI-GSDC/ Current (ALICE Req.) Pledged CPUs 1,000 (2,000) 1,5002,000 Disk (TB) 1,000 (1,000) 1,000 Tape (TB) - (1,500) 7001,5002,000

Conclusion Demonstration of WLCG Tier-1 for ALICE is going well according to plan: – ALICE collaboration appreciated its progress of KISTI-GSDC as WLCG Tier-1 candidate (ALICE collaboration board in 12 th Oct. 2012) For pA LHC in 2013, it is crucial that TAPE library has to be fully functioning by the end of this year Precise plan for upgrading network >3Gbps is mandatory to be integrated into LHCOPN KISTI-GSDC/

KISTI-GSDC/ Thank you 15