October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.

Slides:



Advertisements
Similar presentations
S.PopescuAlice DCS workshop, Colmar, OPCs latest news Iseg OPC server Wiener OPC server.
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
Marc R. StockmeierDCS, KIP ALICE WEEK FALL 2003 TRD DCS Status ● DCS-board status ● Poweresupply ●
Joachim Schultes University of Wuppertal FIT Wiener DCS Training Session 2.1.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
09/11/20061 Detector Control Systems A software implementation: Cern Framework + PVSS Niccolo’ Moggi and Stefano Zucchelli University and INFN Bologna.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
European Organization for Nuclear Research Geneva - Switzerland Ing. Robert van der Vlugt CERN/PH Alice Detector Control System PVSS2 General Purpose Interface.
S.Sergeev (JINR). Tracker consists of  4 chambers of 4 views each In total ~7200 drift tubes (~450 per view) To be controlled/monitored  HV system.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Markus Joos, EP-ESS 1 “DAQ” at the El. Pool Aim and preconditions Hardware Operating system support Low level software Middle level software High level.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
15/12/10FV 1 Common DCS hardware. General ideas Centralized system: o Common computers. Detector dedicated computers (with detector participation) only.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Wayne Salter, CERN The LHC Experiments’ Joint Controls Project Framework ALICE DCS Day 10 th September 2001.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
Naming and Code Conventions for ALICE DCS (1st thoughts)
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
UF/PNPI POWER SUPPLY SOFTWARE By Magnus Hov Lieng
ALICE DCS Workshop 9 October 2006 ALICE DCS Workshop 9 October 2006 Michele NITTI.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
Joachim Schultes University of Wuppertal FIT Iseg DCS Training Session 2.2.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
Institute of Nuclear Physics Polish Academy of Sciences
ISEG Users meeting Mateusz Lechman 20/07/2010.
TPC Detector Control System
Presentation transcript:

October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement Lionel Wallet, CERN

October 9th 2006ALICE WEEK - DCS WorkShop2 PRESENTATION  Lionel WALLET, Fellow Marie Curie  Specialty : Control (Client)  Ongoing Work : OPC and Front-End  ALICE DCS since 2 months  Device User Support (Iseg HV, Wiener LVPS, VME Crate)

October 9th 2006ALICE WEEK - DCS WorkShop3 First Line Support FIRST LINE SUPPORT ALICE USERS - Wiener Crate - Wiener LVPS - Iseg HV - Wiener Crate OPC - Wiener LVPS OPC - Iseg OPC Reference System OPC Server Framework Component IT-CO SUPPORT OPC Provider

October 9th 2006ALICE WEEK - DCS WorkShop4 Reference System  Representation of devices used in Alice  HV / LV  Available for Alice users  To be used for Testing, Debugging, Verification…  Setting On for ISEG HV  Ongoing with Wiener VME Crate, Wiener LVPS  Where ? In the DCS Lab : 13 / R-16

October 9th 2006ALICE WEEK - DCS WorkShop5 Reference System Device OPC server FW OPC Client PVSS Project Project available with latest releases Hardware Devices available to test Module, Crate, … Physical device Ref. Users Interface HV / LV Devices + Modules Reference Control System Field Bus

October 9th 2006ALICE WEEK - DCS WorkShop6 ISEG Reference System  Users : TPC, TRD, SDD, PHOS, EMC CURRENTLY AVAILABLE SYSTEM Software : PVSS 3.1 ISEG Framework Component 2.1 ISEG OPC Server 4.02 (CAN) ISEG HV Control Peak Drivers (CAN / USB) Matrikon Explorer Hardware : ISEG Crate ECH 238 (CAN Bus) Modules (Different Module Class) - EHQ 8010p (TPC) - EHQ 8630n -F (TRD) Peak Adaptator (CAN – USB)

October 9th 2006ALICE WEEK - DCS WorkShop7 ISEG Reference System CAN - USB Physical device Reference Control System ISEG Crate ECH 238HV Modules CAN Bus Ref. Users Interface ISEG OPC server FW OPC Client PVSS Project Peak

October 9th 2006ALICE WEEK - DCS WorkShop8 WIENER Reference System  Users : TPC, TRD, PHOS, CPU, MTK, MTG, EMC,… SYSTEM FORSEEN : Software : PVSS 3.1 Wiener Framework Component Wiener OPC Server (Ethernet) Wiener OPC Server 1.8 (CAN) Hardware : Wiener VME Crate (CAN Bus) Wiener PL512 (Ethernet) Modules (to be defined)

October 9th 2006ALICE WEEK - DCS WorkShop9 WIENER Reference System WIENER PL512 Ref. Users Interface FW OPC Client Physical device Ethernet TCP/IP PVSS Project VME Crate Reference Control System CAN Bus + Modules Kvaser WIENER OPC server (CAN) CAN - PCI WIENER OPC server (Eth.)

October 9th 2006ALICE WEEK - DCS WorkShop10 Current Developments  Tool for Standard Panel by Device  Respect the DCS Users Interface Rules  Only basic PVSS knowlegde is required ISEG Objects Library

October 9th 2006ALICE WEEK - DCS WorkShop11 Current Developments Import your Object from the Library Channel Name Crate Name Module Name Open the Library from the Catalogue Menu ISEG Objects Library Step 1 Step 2 Step 3

October 9th 2006ALICE WEEK - DCS WorkShop12 (1) (2)(3) (4) (5) Advantage : - More Convenient for Modifications (Code) - Build your Panel easily - Navigation First Version Your feed backs are needed Current Developments

October 9th 2006ALICE WEEK - DCS WorkShop13  Next Framework Component Release -> Complete List of Modules -> Include Objects Library  Waiting for OPC Server 4.10 to be compatible with the Fw component Current Developments ISEG Software Improvement

October 9th 2006ALICE WEEK - DCS WorkShop14 -> Don’t hesitate to provide us modules -> Wiener Crate + LV : Waiting for the Devices ISEG WIENER Setting Up the Reference System in our LAB Current Developments

October 9th 2006ALICE WEEK - DCS WorkShop15 For more informations  Use our Website to be informed about the News and to download last OPC and Framework Versions ->