Jan 13 2004Tune fitters - P. Lebrun1 f Tune Fitters Status, mid-January 2004 P. Lebrun, Fermilab January 14 2004.

Slides:



Advertisements
Similar presentations
M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
Advertisements

NAIC Visiting Committee Meeting · March 4-6, 2008 FPGA SPECTROMETER COMMISSIONING Spectrometer description How it will be used Where we are at. What needs.
FNAL Emittance Devices Flying Wires (FW) Sync Lite Ion Profile Monitors (IPM) aah,6/20/2000.
15.1 © 2004 Pearson Education, Inc. Exam Managing and Maintaining a Microsoft® Windows® Server 2003 Environment Lesson 15: Configuring a Windows.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Title US-CMS User Facilities Vivian O’Dell US CMS Physics Meeting May 18, 2001.
©TheMcGraw-Hill Companies, Inc. Permission required for reproduction or display. COMPSCI 125 Introduction to Computer Science I.
Ion source RF system Andy Butterworth BE/RF Mauro Paoluzzi BE/RF 14/11/2013Linac4 ion source review.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team 28 January 2009 Presented by Elliott McCrory.
High Level LHC Schottky Software Development Jerry Cai & The LAFS Team.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
January Tevatron Tunes - P. Lebrun1 f On Tevatron TuneTracker, Status Report & Plans Paul Lebrun Fermilab January
Vaia Papadimitriou The Supertable (Introducing Supertable II) Run II meeting September 2, 2004 Timofei Bolshakov and Vaia Papadimitriou.
© CCI Learning Solutions Inc. 1 Lesson 5: Basic Troubleshooting Techniques Computer performance Care of the computer Working with hardware Basic maintenance.
SDA- Shot Data Acquisition and Analysis Example of major applications that use the Java DAE framework Jean Slaughter Controls Review Feb 4, 2004 A success.
Tevatron BPM System Upgrade Technical Update Bob Webber Run II Luminosity Upgrade Review February 2004.
Horz V1 H1 H2 V2 Pbars in Recycler Ring Stripline Kickers Split Plate Pickups A-B Vertical Digital Damper Vert Recycler Transverse Damper System Similar.
NGU Proposed revision of recommendation CCSDS (401-B-20) on TC bit rate NGU WG Fall CCSDS Meeting - London UK - Oct 25, 2010.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
CIDB The PSI Controls Inventory DataBase Timo Korhonen, PSI (for the CIDB Team)
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
Jean Slaughter –April 5, 2004 – all experimenters’ meeting Purposes of SDA Store to store monitoring of performance Long term trends Analysis of specific.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
January Tevatron Lifetimes - P. Lebrun1 f On Tevatron Proton Lifetime at 150 December 3 Study vs Store data. Paul Lebrun Fermilab January-December.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
F Beam Line Tuners Vic Scarpine Instrumentation DoE Review Oct 28-31, 2002.
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
October 2002 Jean Slaughter SDA – Shot Data Analysis Outline Description of SDA Examples Plans for 2003 SDA is a system for acquiring and analyzing data.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
CDMS Computing Project Don Holmgren Other FNAL project members (all PPD): Project Manager: Dan Bauer Electronics: Mike Crisler Analysis: Erik Ramberg Engineering:
April Tevatron Lifetimes - P. Lebrun1 f On Tevatron Lifetimes, Beams, Luminosity & Spot size Paul Lebrun Fermilab April
Fermilab February 17, 2003Recycler BPM Front-end1 Duane C. Voy
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
TeV BPM Review 12/16/2003 Summary Status, Motivation, and Directions.
FY07 RHIC Schottky and Tune Ripple Experiments Plans M. Blaskiewicz, K. Brown, D. Bruno, P. Cameron, C. Degen, A. Della Penna, W. Fischer, G. Ganetis,
Specifications of Tevatron BPM Upgrade Jim Steimel.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
March Tune Meter - Betatron Coupling - P. Lebrun 1 f On Automated Betatron Coupling Measurements Using the Tevatron Tune Meter. Paul Lebrun Fermilab.
Specs on Tune Measurement System (draft) accuracy of dQ  with typical intensities reports every 2 seconds or faster both protons and pbars for every.
RHIC Status April 8, 2011 RSC Meeting Haixin Huang.
MD377 Schottky diagnostic M. Wendt, M. Betz, T. Lefevre.
Tevatron Beam Position Monitor Upgrade Stephen Wolbers (for the Tevatron BPM Upgrade Project) PAC05, Knoxville, TN May 16-20, 2005.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Sept Tune fitters/1.7 GHz & 21.4 MHz - P. Lebrun 1 f Tevatron Tunes Measurements: Status Report on 1.7 GHz and 21.4 Mhz systems, Sept 2004 P. Lebrun.
RHIC Status Haixin Huang RSC Meeting 02/18/2011. l Fixed the blue dump kicker noise problem last Friday. l Declared physics last Friday. l Smooth run.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
Aug On Pbar Losses - P. Lebrun1 f On Pbar Losses up the TeV Ramp Paul Lebrun Aug
Fermilab Control System Jim Patrick - AD/Controls MaRIE Meeting March 9, 2016.
Feb 4, 2004P L McBride Project Status Meeting1 CD help for AD Note: BEAMS (BD) == ACCELERATOR (AD) Date of Last Report - April 25, 2003 (Division Briefing.
Brian Drendel October 31, This talk  Beams-doc private/DocDB/ShowDocument?docid=4474https://beamdocs.fnal.gov/AD-
A Survey of the Capabilities of the Upgraded TeV BPMs Rob Kutschke, CD/EXP Run II Meeting March 24, 2005 Beams-doc-1752-v2.
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
Fermilab Scientific Computing Division Fermi National Accelerator Laboratory, Batavia, Illinois, USA. Off-the-Shelf Hardware and Software DAQ Performance.
35t Readout Software John Freeman Dune Collaboration Meeting September 3, 2015.
Laser System Status and Plans November 20 th, 2008 R.Febbraro / S. Viret LPC TileCal Operations 1. Diode 4 study 2. Stability preliminary results 3. Next.
SDA- Shot Data Analysis Jean Slaughter DOE Review July 21, 2003.
BaBar Transition: Computing/Monitoring
ATF/ATF2 Control System
Online Control Program: a summary of recent discussions
EVLA Availability - or - When Can I Use It?
Software For Accelerators
LHC Fast Timing Commissioning
Presentation transcript:

Jan Tune fitters - P. Lebrun1 f Tune Fitters Status, mid-January 2004 P. Lebrun, Fermilab January

Jan Tune fitters - P. Lebrun MHz & 1.7 GHz Schottky Monitors. We are working on two distinct systems : the 21.4 MHz old Schottky, and the recently installed 1.7 GHz Schottky. Sharing some computing methods: Java-D.A. and the refurbished and translated MINUIT fitter, in the C++/ROOT context. “Front-end” systems are quite different, though. We need two of them: 1.7 Ghz one is “broadband” and see individual bunches, 21.4 MHz is “narrow” band and can see synchrotron lines and give more accurate tunes for uncoalesced beams. “We” means: C. Briegel, D. Still, A. Jansson, Z. Yuan, S. Panacek, J. Marraffino, J. You, Ron Moore, T. Meyers, D. Finstrom, T. Sen, M. Huening, jerry Cay,… Many thanks to all of them! Please visit the poorly written web site at

Jan Tune fitters - P. Lebrun MHz Tune Fitters An old and, in a few month time scale, a new one! Based on ancient VaxVMS based fitting package (C39, C42, C44..) The existing – and running – Tune fitter takes data from two dedicated HP3561a and fits the spectra at a rate ~ 0.5 Hz (uncoalesced)

Jan Tune fitters - P. Lebrun4 Old 21.4 MHz Tune Fitter, Limitations & Plans Limitation & defects: 1. Only proton channel, no pbars. -> we’ll try to get Pbars…, from two to 4 concurrent fitters 2. We would like to go a bit faster ( 1Hz) (Should be possible!) 3. GPIB-based : configuration is hard to control, HP3561a are obsolete, thus difficult to maintain… -> purchase new front-end equipment 4. No chromaticity measurement from the ratio of synchrotron to main line from the fit. -> Tanaji Sen will give me the formula/procedure 5. The fit is sometimes plainly wrong … Hard to fix! Post processing software will take care of this. This software must have quite a bit of intelligence and awareness.. Note: quite often, it is indeed hopeless and it does not matter…

Jan Tune fitters - P. Lebrun MHz Tune Fitter, New Front-end Implementation Wrote an upgrade plan, and we are in the process of implementing it: 1. Purchased an ICS 110BL VME card to digitize at kHz the 4 signals coming out of the 21.4 Mhz down-converter. This card is equipped with a daughter board to do antialiasing, signal conditioning. The card can also generate data.. 2. Acquire a VME crate with a PC-board to do the DA and the FFT. 3. Select an FFT package and wrote a very small simulation package to learn how to use it. Results (frequency spectrum ) are written to test ACNET devices. -> All this has been prototype by Marcus Huening 4. J. You has the ICS card and is studying it.. 5. Visited the A1 service building with Brian Fellenz, check for room, network, and so forth. Need to coordinate with Tan as well!

Jan Tune fitters - P. Lebrun MHz Tune Fitter, New Front-end Implementation, II 6. Accel. Controls purchased Linux box for “computational servers”. This is the same equipment CD uses for RunII farms. Java software has been installed, DAE starts to run… (Linux/PC solutions suggested by Jim P., myself and others, because the hardware is cheaper, and Linux is as well supported as Sun stuff, particularly if we run C++ applications. ) Same Linux boxes can be used for any CPU demanding “OAC”, written in either C, C++, or Java..  We purchased what we wanted for FY2004, I think.. May be we need a few more Linux boxes ( few thousands..)

Jan Tune fitters - P. Lebrun7 1.7 GHz Tune Fitter. I am only working on the “back-end”, the OAC and the Application. Goals: –Like from any other instruments that can generates data continuously, we should fit the 1.7 GHZ Vsa data continuously during the store -> advanced “Front-end” or an a “background process” or a “computational” OAC. –And a new application to drive the OAC -> We are part of the VAX-migration effort, since Vax Console applications (T122,.. W101) have already been written and are maintained. The OAC is the new thing.. Note: it relies on an other OAC to control the bunch gating (tevsky)

Jan Tune fitters - P. Lebrun8 Software Architecture.. Yes, it is a bit too complicated!. Too many arrows In particular..

Jan Tune fitters - P. Lebrun9 Status, 1.7 GHz software.. (or the software I am aware off..) W101 keeps getting better and better… New (Java/C++) software 90 to 95 % coded up Being commissioned: a. New GUI running on the “W” or “Z” Java appix page. b. OAC is running… most of the time during store. c. Need to support multiple users of the VSA (see presentation by Andreas) Plenty of polishing-up work need to be done, as shown in a few slides and plenty of detailed analysis to do!

Jan Tune fitters - P. Lebrun10 Status, 1.7 GHz software..a week ago.. Notes: 1.The bump early in the software is due to changes made to the base tune circuit, and matches (semi-quantitatively) with what Ops typed in the T55 page.. 2.However, the tune value are off by ~ 0.001, due to an inaccuracy in the internal frequency scale. It has been readjusted last Sunday.. 3.Yet, the tunes are still off with respect to the 21.4 MHz. This will need more work..

Jan Tune fitters - P. Lebrun11 Status, 1.7 GHz software..Fit Quality. Notes: 1.Fits are O.K. when gating on all bunches. 2.Marginal for Pbar gating on 3 bunches 3.Not quite there gating on a signal bunch..But, remember, we will get 4 times more pbars next year!

Jan Tune fitters - P. Lebrun12 Preliminary results on tune drifts. (1.7 GHz) Notes: Very clear difference between pbar and proton. Seen on other stores as well… Proton/pbar Tune split is due to head-on beam-beam tune shifts and differential tune settings.

Jan Tune fitters - P. Lebrun13 Prelim. results on tune drifts, theory/meas. Taking the FW vertical emittance at Remove Halo, and taking the relative growth size from Sync Light, the bunch intensity and bunch lifetimes from SBD (uncorrected), one has: 201 hours. = 21.6 pi mmmrad 53 hours. 23 hours. = = = /hour = /hour

Jan Tune fitters - P. Lebrun14 Status, 1.7 GHz Schottky monitoring Plenty of beam physics analysis to do… - Do we understand absolute values of tunes? - Why is fitted chrom ~ 2 too high ? - Can we measure emittance ? Emittance growth ? - Can we measure  P/P - Correlation between these 4 fitted quantities? Compare to other measurements ? And quite a bit of software polishing: - Adding the capability of taking Ramp and Squeeze measurement up the ramp - Polishing the GUI (including connection to VSA & Scope) - Testing other modes of operation