GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation]

Slides:



Advertisements
Similar presentations
Code Analysis:Accessibility Colleen MacEachern & Stephanie Novak.
Advertisements

S2 INVENTOR GAME BOY part one MAIN BODY. S2 INVENTOR Here is what the finished result might look like once put together...
BARTOSZEK ENGINEERING 1 The Design of the Booster Collimators Larry Bartoszek BARTOSZEK ENGINEERING 3/10/03.
ISIM Integration & Test Mike Drury JWST-PRES
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Vacuum Vessel Production Readiness Review
By: Joseph Martinez University of Michigan Supervisor: Dave Pushka, NuMI Project 3Q120-M Quadrupole Magnet Transport.
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
Senior Design: Validation of Design December 15, 2008.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-ISOC Subsystem1 RFA 1 – Management Plan, Documentation, Schedule  Specific Request – Part 1.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
CONSTRUCTING A FIVE CABIN LATRINE
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
Design for Elderly and Disabled Environments Making Homes More Comfortable and Accessible Doors Part 2 of 10.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
GLAST LAT ProjectOct. 23, 2003 Page 1 EM-1 I & T Lesson’s Learned Need to define all documents / training required for I&T personnel –LAT-MD ,
Style with STRENGTH & Flexibility. The Kontour Series.
LATLAT Beam Test Workshop 20th March GLAST Program Beam Test Workshop CU Outer Shipping Container Michele Pinchera
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Adaptation of Van with a Wheelchair Lifting System Group Eight Members: Bill Fotoples- Team Leader Chad Wainscott- Technical Liaison/Web Page Specialist.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
Transport and handling at CERN for FAIR
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
K.Gadow CALICE technical review 1 Move to FNL ECAL/HCAL-Movable Table Setup test beam integration to Fermilab MT6-B3/B4.
GLAST LAT Project Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A)
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT ProjectDec 17, 2003 Page 1 GPR Design & Requirements Grid Perimeter Ring (GPR) Design –Ring is comprised of four lengths of Aluminum bolted together.
201 Mhz Cavity Installation. Removing Old 201 Cavity Came in through door with fork lift Will go out through labyrinth Requires new 3 ton Gantry crane.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
TWI Welding Inspection Duties/Terms Course Reference WIS 5 M.S.Rogers.
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
ENGINEERING PLUMBING AND SANITATION Applies Fire Company of Plumbing System.
SBN Far Detector Installation & Integration
SX1 manipulation VERSION 1 Version
Escalator Installation
Mechanical Integration
LARP Vertical Test Facility
Design of Distribution Feedbox at LHC P7
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
PRODUCT ARGUMENTATION
St. Joseph’s House of Hospitality
Roof design Bunker Project CDR
Senad Kudumovic Design engineer
Bunker Wall Design Wall ESS
Bunker Project Operation aspects
Presentation transcript:

GLAST LAT ProjectMarch 08, 2004 Page 1 ACD Installation, Post LAT CDR Response to GLAST LAT CDR RFA Number 13: MGSE Detailed Dimension Study [for ACD Installation] –A) Perform detailed dimension study. Crane hook height appears inadequate for installation of ACD See slides 3 and 4 –B) Provide information on the clean room entrances and clearances that will exist when equipment (including GSE) is brought in and out. Large, Double Door to Class 100K Crane Room is 111” [ 2,819 mm ] wide by 108” [ 2,743 mm ] high Small, Single Door to Class 100K Clean Room is 59” [ 1,499 mm ] wide by 79” [ 2,007 mm ] high The LAT on the Integration Stand, the Low Profile ACD Integration Stand and the 8’ x 8’ x 6.2’ tall ACD Dolly fits in Rm 104; See slide 5

GLAST LAT ProjectMarch 08, 2004 Page 2 ACD Installation, Post CDR Concept SLAC will develop a low profile integration stand When ready for ACD mate operations, the LAT will be lifted from the Rotation / Support Stand and set onto the low profile stand Next slide shows available clearances The “available clearances” assume an 8” [ 203 mm ] high spreader –Current welded joint analyses indicate that the spreader needs to be at least 8” high (i.e., Rectangular Structural Steel Tubing that is also 6” wide and 0.375” thick) –13.6” [ 345 mm ] of room to operate crane along Z (vertical)

GLAST LAT ProjectMarch 08, 2004 Page 3 ACD Installation, Low Profile Integration Stand 20.0” [ 508 mm ] 51.8” [ 1,316 mm ] 6.0” [ 153 mm ] 97.7” [ 2,482 mm ] Crane Lift Block at high point 134” [ 3,403 mm ] 36.3” [ 922 mm ] Low Profile ACD Integration Stand ACD LAT 4x4 Lift Spreader (8” [203 mm] Height), 6” [152 mm] Clearance between Spreader and ACD, Plus Crane Scale requires 36”

GLAST LAT ProjectMarch 08, 2004 Page 4 LAT With ACD To / From Rotation Stand Crane load block maximum height is 134 inches [ 3,403 mm ] (Hook removed) No problem moving LAT to / from integration stand 13.6” [ 345 mm ] Operable Height for Crane, with Scale in the loop ¾” OTS 316 CRES Turnbuckles Rated for 5,200 lbs each 6.0” [ mm ] 53.0” [ 1,346 mm ] 120.4” [ 3,058 mm ] ACD Installed 29.2” [ 742 mm ] Crane Lift Block attaches directly to Crane Scale that attaches directly to Lift Spreader Post 8,856 lbs Crane Load Block

GLAST LAT ProjectMarch 08, 2004 Page 5 LAT With ACD To / From Rotation Stand ACD Low Profile Integration Stand ACD on 8’ by 8’ Dolly All Required Hardware for ACD Integration Fits in Room ACD Low Profile Integration Stand and its Dolly are within Crane’s Pick Zone ACD on Dolly easily fits through Double Doors ( LAT May require bagging during door opening events) Integration Stand is Placed to Allow Range of Motion for PAPs