AWAKE E. Gschwendtner, EATM, 1 July 2015 1. Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
The Physical Environment Tracers How Should I Prepare for the Physical Environment Tracers? Healthcare Engineering Consultants  Will limit.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
North Carolina ABC Distribution Center Graham B. Thompson Project Manager LB&B Associates Inc.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
EHN1 North Wall Dismantling Schedule Bastien Rae.
LHCf: installation & commissioning Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
Update on the Laser Beam Line
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
AWAKE Technical Board, 19 August E. Gschwendtner, CERN.
MVD installation, fall 2004 Pads only:. Work done with IhnJea Choi MVD after successful installation Beam pipe is pushed to the center with a plastic.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
ARIEL Building Pierre Bricault. Proton Beam specification The proton beam energy must be between 450 to 500 MeV. 200 µA with proton beam intensity losses.
Room 105 Status and Laser project update Brachmann.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
Status of AWAKE Installation and Integration Presented 9/3/2016 at the AWAKE Collaboration Meeting Ans Pardons, for the AWAKE CP4 team.
Feasibility Study of the AWAKE Facility at CERN Edda Gschwendtner, Chiara Bracco, Brennan Goddard, Malika Meddahi, Ans Pardons, Elena Shaposhnikova, Helga.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
The AWAKE Safety Documentation C. ALANZEAU (editor) & Stakeholders –
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
AWAKE Run 2 : 1) Interstage considerations 2) CALIFES as plasma technology test facility Erik Adli and Carl A. Lindstrøm University of Oslo, Norway AWAKE.
Neutrino Platform Proximity Cryogenics 59th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Neutrino Platform Proximity Cryogenics 62th EHN1 Cryogenics Integration Redouan Abdennour, Johan Bremer, Michel Chalifour, Joaquim Creus, Aurelien Diaz,
Drive-Laser Commissioning Status and Plans
EHN1 Extension North Side wall (Removal of Existing services & platforms) Michael Jeckel & Bastien Rae.
Budget specification EHN1 Extension: Infrastructure (WG2)
CE Status: Activities executed until 03/08 and ongoing
EHN1: CE Integration process updating
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
Question & Suggestions March 17th
Bubble Chamber Summer 2015 Installation and Beam Test Schedule
LS1 status 28/04/2014.
Experimental Areas – LS2 planning
Summary of the presentation:
Plasma : high electic field can accelerate electron and proton laser plasma accelerator can reduced size of future accelerator can produced particle beam.
Presentation transcript:

AWAKE E. Gschwendtner, EATM, 1 July

Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started Preparation of the AWAKE control room Laser room becomes a clean-room (doors, ventilation system, etc…) Approval of proton and laser beam line design Dedicated area in the North Area modified to house the first 10m long plasma cell (shipped beginning of July) Electron beam injection studies in full swing to optimize the injection settings Safety document/risk assessment preparation for electron source, plasma cell, laser… 2

AWAKE Facility 3 e-beam tunnel p-beam April 2015 June 2015

AWAKE Laser Room 4 April 2015 June 2015

EHN1 AWAKE Area S. Girod EM-MEF 5 Saleve side Zone Awake Jura side

Plasma Cell in EHN1 6 Delivery: 29 June 2015

Plasma Cell in EHN1 7

Now: preparation of the facility – Add door locks – Empty even more the area Measurements of temperature stability with the oil heating will start mid July