NUMI NuMI Magnet Power Supply System WBS 1.1.3 Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001.

Slides:



Advertisements
Similar presentations
The L-Network L-networks are used to match the output impedance of one circuit to the input of another. Rsource < Rload, 1< Q < 5 Rsource > Rload, 1
Advertisements

11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Proton Driver Magnet Power Supply System Cezary Jach BD/EE Support April 19, 2000.
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
ANU Cooling Systems Karl Williams Fermilab Accelerator Division CD-2/3a DOE Review of NO A October 23-25, 2007.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Oct. 10th 2006NSLS II Accelerator System Advisory Meeting SR-PS 1 NSLS II Accelerator System Advisory Committee Meeting October 10 – NSLS II Storage.
NUMI Power Supply Regulation WBS Power Supply System Level 3 Manager Nancy Grossman FNAL June 28, 2001.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Tom Kubicki.  Booster HLRF System to be upgraded using 1kW Solid State Driver (SSD) Amplifiers.  Used to drive the 200kW Power Amplifier  Eliminates.
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
Chapter 19 Charging Systems.
Chapter 6 Voltage Regulators - Part 2-.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Magnets for Mu2e Resonant Extraction: Design and Scope Changes V.Nagaslaev 05/09/2013.
CHAPTER 6 VOLTAGE REGULATOR POWER SUPPLIES (VOLTAGE REGULATORS) Fig. 6.1 Block diagram showing parts of a power supply. Power supply Power supply: a.
Technical Presentation on the new Power Saving Unit (PSU) Introduced By View Power.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
Clippers & Clampers Zener diode application. Clippers Clippers or diode limiting is a diode network that have the ability to “clip” off a portion on the.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
New proposed BU circuit and control logic design University of Washington.
Performance Improvement of APS Booster Ring Dipole Magnet Power Supplies Ju Wang The 3 rd Workshop on Power Converters for Particle.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Linac Marx Modulator Update Trevor Butler 5/20/2015.
February 17-18, 2010 R&D ERL Bob Lambiase R&D ERL Power Supplies Bob Lambiase February 17-18, 2010 Power Supplies.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
Chapter 6 Voltage Regulators - Part 2-.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
STATUS OF NOKER PULSER FOR SHORT MAGNETS C. C. JENSEN DECEMBER 4, 2013.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
AEM – Special Report Linac Current Stability and Modulation June 25, 2007 Presented by: Doug Moehs Philippians 4:6-7 (Doug) Do not be anxious about anything,
Overview: Primary Sensitivities Nov S. Childress Page 1 NuMI Overview: NuMI Primary Beamline Sensitivities NuMI requirements are for a very large.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
Regulated Power Supplies
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
NuMI Primary BooNE / NuMI S. Childress (FNAL) Primary Beams for Mini-BooNE & NuMI 18 March, 2002 Mini-BooNE inputs from Craig Moore and Al Russell Includes.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
NUMI Flexible Joint/Floating Clamp WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 10, 2001.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
NuMI PS Specs June 2001 S. Childress Page 1 NuMI NuMI requirements are for a very large fraction of the available Main Injector intensity over a period.
Power Supply Design Howie Pfeffer Mu2e Extinction Technical Design Review 2 November 2015.
Ioanis Kourbanis 01/23/13 RR AIP 1. Requirements Provide proton beam with the proper time structure from the Recycler to the muon campus for the g-2/mu2e.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
Pulsed Magnet Power Supply Feasibility Study
Chapter 6: Voltage Regulator
Primary Design Parameters July 13,2001 S. Childress Page 1 NuMI Besides design specifications driven by physics and Main Injector beam parameters, significant.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
Introduction High Voltage!!.
CHAPTER 6 VOLTAGE REGULATOR Tulus Ikhsan Nasution.
Development of new power supplies for J-PARC MR upgrade
Chapter 6: Voltage Regulator
I Alexander Nass for the JEDI collaboration
Presentation transcript:

NUMI NuMI Magnet Power Supply System WBS Power Supply System Level 3 Manager Nancy Grossman FNAL July 11, 2001

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 2 Outline Overview and Specifications (Nancy Grossman, 20’)  Conventional Power Supplies and Cables (PS)  Kicker Power Supply and Cables (PS) Status of Refurbished PS (Steve Hays, 30’) Status of Kicker PS (Chris Jensen, 30’) Status of Cooling System for PS (Dave Pushka, 30’) Cost/Schedule/Concerns (Nancy Grossman, 10’)

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 3 Overview of the Magnet Power Supply System Conventional Power Supplies (PS) (all existing PS’s to be refurbished or bought from FNAL spares inventory; Steve Hays, Bob Ducar)  Ten 500 KW PS  1 Main Ring PS  Three 240 KW PS (one used at MI8 for testing horns)  Ten 20 KW PS  PS for 12 Main Injector trim magnets 1 Kicker PS (to be designed, built and tested; Chris Jensen) AC (480 panel to PS) and DC Power Supply Cables and Connectors (Steve Hays, Bob Ducar) All large power supplies are ramped. All quad and trim PS’s are DC and have their own PS.

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 4 Refurbished Magnet Power Supplies Specifications Conventional Power Supplies and Cables (Steve Hays, Bob Ducar) Must provide reliable, stable power to beamline elements while minimizing power consumption. The NuMI facility is expected to be operational for of order ten years, and the power supply system has been designed with this in mind. Power supplies must accommodate a repetition period of 1.9 seconds (~1 msec flatop).  Want PS to stabilize at flatop, read it to check current and have time to still extract. Personnel safety must be assured from possible electrical, mechanical and radiological hazards during installation and operations. Voltage and current requirements for the various beamline elements determine what power supplies and cables will be needed.  Table summarizes these requirements and indicates the chosen power supply for each case. For beam tuning and focusing, each trim and quadropole magnet has its own power supply. Bend circuits use several 500 kW supplies in series (or for the V105 circuit a Main Ring Power Supply) in order to obtain the desired voltage levels.

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 5 Refurbished Magnet Power Supplies: MI60

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 6 Technical Progress & Status: HV101 PS at MI60

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 7 Technical Progress & Status: V100, LAM60 and Quad PS MI60

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 8 Refurbished Magnet Power Supplies: MI62

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 9 Refurbished Magnet Power Supplies: Target Hall Service Building

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 10 Refurbished Magnet Power Supply Regulation Power supply regulation “requirements” shown below  Groundwater irradiation  Stability of beam on target 720 Hz line ripple effect on the PS currents is shown in the table below.  Need filters on all bend strings

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 11 Refurbished Magnet Power Supply Regulation Simulations were run for the NuMI V105 string, assuming a constant reference voltage. 5% change in line voltage was easily corrected for at the level of ~25 ppm with standard voltage regulation. (most variation one would expect) 5% load change (resistance) gave a 240 ppm current variation.  Corresponds to about a 10 0 C change in the copper in the magnet or the LCW changing 15 0 C  Need additional regulation.  HOLEC transductor ($5K/string) & Special FNAL regulation electronics ($5K/string)  Both are designed and installed in the Main Injector  This combination of electronics would give another factor of ppm

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 12 Refurbished Magnet Power Supply Regulation Three strings are still above the required specifications. So now what?

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 13 Refurbished Magnet Power Supply Regulation Bandwidth Each string will be tuned for maximum bandwidth.  20 Hz is assumed in the previous calculations, 40 Hz may achieved (but not guaranteed).  Gives a factor of 2 in current stability. Auto-tune Load changes are typically slow changes and thus Auto-tune can correct for these. One could then argue why do you need the extra power supply regulation too?  Auto-tune does not always work.  Needs beam and working beam position monitors to work.  Assumes next beam pulse like the previous one.  Experience at FNAL where significant beam control is needed says do both.  Since the power supply regulation is also driven some by groundwater concerns, we want something that is always working.

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 14 Refurbished Magnet Power Supply Regulation NuMI bend string power supply regulation levels will be achieved by:  Filters on all 7 strings.  HOLEC and FNAL Electronics on all 7 strings.  Auto-tune.  Tuning for maximum bandwidth. Quadropole power supplies (20 KW PEI’s):  Standard regulation is at +/- 0.05% of the maximum current (100 or 200 amps)  Corresponds to up to +/-0.44% variation in operating current.  Believed to be sufficient. Main Injector Trim Magnet power supplies:  Standard regulation is at +/- 0.1% of the maximum current (15 amps)  Believed to be sufficient.

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 15 Refurbished Magnet Power Supplies Status Conventional Power Supplies and Cables (Steve Hays, Bob Ducar) MI60 Power Supply Cables:  DC cable pulls complete (except kicker PS), including termination on PS side.  AC cabling of power supplies is complete (except kicker PS). MI62 Power Supply Cables:  AC cabling done except for Main Ring PS. Conventional Power Supplies:  9 refurbished, 4 for Target Hall still need to be refurbished.  Ones in existing construction are also in place (except MR PS and Kicker PS).  6 large power supplies, 7 quads and 12 trim power supplies.  Testing of the PS will begin shortly.  Filter chokes and the Main Ring PS need to be installed (not behind schedule).  Scheduled to happen soon. All ahead of schedule and within budget.

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 16 Specifications for the Extraction Kicker Minimum Integrated Field: 2.24 kG - m Kick 120 GeV: 563 µrad to inside of ring Field Rise Time (1%-99%): 1.30 µs Field Fall Time: N/A Field Flattop Time: 9.78 µs minimum( 6 batches) Flattop During Pulse:± 1% Flattop pulse to pulse:± 1% Repetition Rate:1.9 seconds Required Charging Time:1.5 seconds Magnet Location: Immediately Downstream Q602 Power Supply Location: MI-60 Service Building, South Power Supply Room

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 17 Kicker Power Supply Kicker Power Supply - based on MI-52 kicker design (Chris Jensen) Design modifications to change polarity of supply. (Significant design effort.) Pulse Forming Network driving two (or three series/parallel) magnets in parallel. PFN has 32 sections, 33 nF/section, 825 nH/section, 46 kV at minimum kick Increase coupling of Pulse Forming Network (versus MI-52) Longer lifetime capacitors for PFN (versus MI-52)

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 18 Kicker Power Supply Work on the charging power supply specification is in progress. Drafting is in progress:  Design is ~40% complete  Swtich tube enclosure 50% complete. Some long lead time parts ordered:  End of line clipper diodes  Controls parts Kicker controls are 30% complete. Much of the design is delayed due to magnet design questions (ceramic tube) Much of the kicker construction, machining and purchase orders will be delayed to FY2003.  Due to funding profile with re-baseline  Still allows several months of float in the kicker construction, testing and installation.

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 19 Other Presentations Overview and Specifications (Nancy Grossman, 20’)  Conventional Power Supplies and Cables (PS)  Kicker Power Supply and Cables (PS) Status of Refurbished PS (Steve Hays, 30’) Status of Kicker PS (Chris Jensen, 30’) Status of Cooling System for PS (Dave Pushka, 30’) Cost/Schedule/Concerns (Nancy Grossman, 10’)

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 20 Costs Refurbished Power Supply & Cable Costs  Total Budget: ~$900K  Percent Complete:~48%  Cables, MR PS, regulation/filters, testing Kicker Power Supply and Cables  Based on 2 magnet design….  Total Budget: ~$534K  Percent Complete: ~40%  Need new cost estimate based on 3 magnet design - in progress.

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 21 Schedule & Milestones

NUMI NuMI Internal Review July 11, 2001 Magnet Power Supply System Page 22 Concerns/Summary Refurbishing of conventional PS and installation of their AC and DC cables is ahead of schedule and within budget.  Regulation requirements are tight, but doable  Concerned about integration of the power supply regulation/readout into the NuMI Beam Permit System Kicker Magnet Power Supply  On schedule and budget so far, but…  Will the magnet design change to 3 magnets versus two due to having to use a shorter ceramic tube?  Cost/schedule implications of that are in progress and nearly complete.