1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville.

Slides:



Advertisements
Similar presentations
1 J-PARC and T2K 1.Accelerator construction status and commissioning 2.Accelerator upgrade plan in first 5 years 3.Experiments with slow extracted beam.
Advertisements

2013 Apr.30-May.03 Shuei EPICS Collaboration Meeting 2013 Spring 1 Acquisition of Long Waveform using Yokogawa SL1000 Shuei YAMADA KEK / J-PARC.
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
ISIS Accelerator Division
Current Status of Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda,
Assessment 1 Review Network Layers. Computer 1Computer 2 2.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
Module 3.4: Switching Circuit Switching Packet Switching K. Salah.
5-1 Data Link Layer r Today, we will study the data link layer… r This is the last layer in the network protocol stack we will study in this class…
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
V4 – Executive Summary 1.Provide online add/delete of I/O to support continuous operation. 2.Provide redundant control of remote I/O to support improved.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Mehnaaz Asad IB2-3. Data logging is the collection of data over a period of time, and is something often used in scientific experiments. Data logging.
Semester 1 Module 8 Ethernet Switching Andres, Wen-Yuan Liao Department of Computer Science and Engineering De Lin Institute of Technology
Laudon & Laudon: Canadian Edition
Midterm Review - Network Layers. Computer 1Computer 2 2.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
LIPAc status report EPICS Integration and Commissioning + RFQ LCS status at INFN/LNL Alvaro Marqueta LIPAc Project Team on behalf of the LIPAc Control.
PPTTEST 10/6/ :29 1 IT Ron Williams Business Innovation Through Information Technology Networking.
Module 10: Monitoring ISA Server Overview Monitoring Overview Configuring Alerts Configuring Session Monitoring Configuring Logging Configuring.
Electrical Distribution Training
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Beam diagnostics control for J-PARC LINAC Guobao SHEN J-PARC Center Japan Atomic Energy Agency Mar
EPICS at APS in June.2006, n.kami, KEK J-PARC Status N. Kamikubota, KEK and J-PARC Control members * Try to enhance updates in the last 1 year.
Virtual Accelerator at J-PARC 3 GeV Rapid Cycling Synchrotron H. Harada*, K. Shigaki (Hiroshima University in Japan), H. Hotchi, F. Noda, H. Sako, H. Suzuki,
Chapter 6 – Connectivity Devices
Data and Computer Communications Chapter 10 – Circuit Switching and Packet Switching (Wide Area Networks)
1 Status and Plans at J-PARC Linac Kazuo Hasegawa J-PARC Center/Japan Atomic Energy Agency Collaboration meeting between CERN and J-PARC December 18, 2013,
Date: File:PRO1_12E.1 SIMATIC S7 Siemens AG All rights reserved. Information and Training Center Knowledge for Automation Troubleshooting.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
Management System of Event Processing and Data Files Based on XML Software Tools at Belle Ichiro Adachi, Nobu Katayama, Masahiko Yokoyama IPNS, KEK, Tsukuba,
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Development of the beam loss monitor for beam halo measurement in the J-PARC RCS Masahiro Yoshimoto *, Hiroyuki Harada, Shinidhi Kato, Kota Okabe, Michikazu.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
An idea for access control enhancement on the EPICS Accelerator Group J-PARC, JAERI April 2004.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
Fast Fault Finder A Machine Protection Component.
Present Status of EPICS Development at the 3GeV Proton Beam Transport Facility Control System in J-PARC JAERI Motoki OiTetuya KaiSinichiro Meigo Sinichi.
BROOKHAVEN SCIENCE ASSOCIATES Advanced Monitor/Subscription Mechanisms Ralph Lange EPICS Collaboration Meeting October 11, 2009.
1 Virtual Accelerator plan and status at RCS Hiroshima University, Graduate School of Science Experimental Quark Physics Lab ( & JAEA Accelerator Development.
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
J-PARC Accelerator and Beam Simulations Sep. 7th, SAD2006 Masahito Tomizawa J-PARC Main Ring G., KEK Outline of J-PARC Accelerator Characteristics of High.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Software Engineering Requirements Review June 5, 2002 LBNL Chuck McParland.
ESS Timing System Prototype 2012 Miha Reščič, ICS
1 BEAM COMMISSIONING SOFTWARE AND DATABASE FOR J-PARC LINAC Hiroyuki Sako G. Shen, H. Sakaki, H. Takahashi, H. Yoshikawa, JAEA H. Ikeda, VIC C. K. Allen,
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
1 Heavy-Ion Physics at J-PARC Shoji Nagamiya RIKEN / KEK / JAEA January 20, 2016 Tokai 1) Motivation 2) J-PARC vs. FAIR.
1 J-PARC Status - Conquering the earthquake disaster and a new step forward to MW J-PARC operation - Yujiro Ikeda J-PARC Center JAEA & KEK
M. Munoz April 2, 2014 Beam Commissioning at ESS.
Redundancy in the Control System of DESY’s Cryogenic Facility. M. Bieler, M. Clausen, J. Penning, B. Schoeneburg, DESY ARW 2013, Melbourne,
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Development Plan for Reliable Card-size IOC N. Kamikubota and S.Yamada, J-PARC/KEK May 2015 in MSU, kami, KEK/J-PARC.
Team Members: ECE- Wes Williams, Will Steiden, Josh Howard, Alan Jimenez Sponsor: Brad Luyster Honeywell Network Traffic Generator.
2007 IEEE Nuclear Science Symposium (NSS)
Beam-Synchronous Data Acquisition (BS-DAQ)
ATF/ATF2 Control System
SLS Timing Master Timo Korhonen, PSI.
How SCADA Systems Work?.
Ken Gunnells, Ph.D. - Networking Paul Crigler - Programming
LCLS Machine Protection System
Presentation transcript:

1 Current Status of The Control System for J-PARC Accelerator Complex Hiroshi YOSHIKAWA J-PARC Center at KEK/JAEA October 16, 2007 ICALEPCS2007 at Knoxville

2 Nuclear Transmutation J-PARC Facility J-PARC = Japan Proton Accelerator Research Complex Joint Project between KEK and JAEA 3 GeV Synchrotron (25 Hz, 1MW) Hadron Beam Facility Materials and Life Science Experimental Facility Neutrino to Kamiokande 50 GeV Synchrotron (0.75 MW) 500 m Linac (330m)

3 Location of J-PARC at Tokai Tsukuba Tokai 1 hour 295 km JAEA

4 Goals at J-PARC Need to have high-power proton beams  MW-class proton accelerator (current frontier is about 0.1 MW) R&D toward Transmutation at 0.6 GeV Nuclear & Particle Physics at 50 GeV Materials & Life Sciences at 3 GeV

5 Phase 1 and Phase 2 –Phase 1 + Phase 2 = 1,890 Oku Yen (= $1.89 billions if $1 = 100 Yen). –Phase 1 = 1,527 Oku Yen (= $1.5 billions) for 〜 8 years. –JAEA: 860 Oku Yen (56%), KEK: 667 Oku Yen (44%). JAEA Portion KEK Portion

6

7 J-PARC Control System Protect from Radiation –Intelligent Beam Control Keep stability of electro-magnetic field Keep minimum beam loss Predict beam behavior System identification and definition of response function By link of operation and simulation By link of operation and database Integrated Operation Environment –Effective use of software technology In the process of developing

8 Function of Safety Radiation Measurement System –Legal management of the area boundary Personnel Protection System (PPS) –Make and keep the boundary condition of closed space which is allowed existence of the beam –Stop the beam when the condition breaks Machine Protection System (MPS) –Protect machine from high power beam bombardment –Stop the beam when something is wrong Computer Control System –Automatic correction, FB, FF –Suggest the optimum parameters

9 PPS

10 MPS MPS hardware configuration. When the threshold is exceeded, the loss monitor module with only the analog circuit is fired.

11 MPS Fast beam stop procedure using Machine Protection System (MPS) 1: The beam loss is detected by the loss monitor. 1: The beam loss is detected by the loss monitor. 2: Loss signal transmission to the RFQ part using MPS. 2: Loss signal transmission to the RFQ part using MPS. 3: RFQ power off and Ion source injection timing removing. 3: RFQ power off and Ion source injection timing removing. 4: Insertion of the Beam stopper 4: Insertion of the Beam stopper 5: Because MPS don't want to cool the RFQ, power is turned on again quickly. 5: Because MPS don't want to cool the RFQ, power is turned on again quickly.

12

13

14

15 NETWORK Basic Composition Star Connection around CCR

16 NETWORK Standard protocol for redundancy can not make the performance that no connection loss when the pass way is switched. We selected the protocol of the vender dependence. For ease of physical fiber topology, we use the combination of ESRP and EAPS.

17 NETWORK ESRP test by single fault ESRP test by double fault No matter appears when the power of switch is down, or when fiber is disconnected. When the route revives, the connection doesn't become interrupted.

18 NETWORK EAPS test by single faultEAPS test by double fault Time of route change < 1.2sec (including route reviving. Any TCP connection is not closed at this route change.)

19 NETWORK

20 TIMING SYSTEM Receiving module E/O-O/E Converter Fanout SEND IOC RECEIVE IOC Ether net Reflective memory net output Clock, Trigger, TypeCode

21 TIMING SYSTEM Ch1Ch2ch3ch4vh5ch6ch7h8 T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 ・・ ・ Ch1Ch2ch3ch4vh5ch6ch7h8 T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 ・・ ・ LUT of a receiving module Ch1Ch2ch3ch4vh5ch6ch7h8 T1 T2 T3 T4 T5 T6 T7 T8 T9 T10 ・・ ・ T3 T5 T3 T5 T3 T5 T3 Type train of sending module

22 TIMING SYSTEM Single Shot is generated for the initial commissioning –Effective to reduce activation Type code means operation mode and beam course Individual delay trimming can be done without stopping the beam –Two way of changing delay time. Delay time changing of selected channels can be done simultaneously

23 Data Acquisition On the EPICS, fundamental data can be acquired. High power beam handling required the traceable data of each shot, selected shot, event occurred shot. Trade off of data size (resolution, repetition) with transport –Separate storing data and gathering data Concept of Selecting Data –We need the data at the event. (around the event, before and after)

24 Before & after data is transmitted to PC. Pulse is Deformed Record Ring buffer Pulse shape Check Abnormal wave-form recorder LAN ・ 10MS/s or 200MS/s (2 types), 12bit(±10V), insulated each CH. ・ Ring buffer size: 192MB wave-form (50pps) Surveillance function Data Acquisition

25 Data Acquisition WER Event Data Collection Server Monitoring Data Server WER ・・ ・ WER System Configuration Trigger Counter BPM 4 BPM 6 BPM 9 CT threshold *WER: Wave Endless Recorder Event (trigger number) Event Data request

26 GUI

27 GUI

28 GUI

29 SUMMARY Infrastructure of the J-PARC control system was completed. –Covered area will be extended to MR, MLF next year. Fundamental function of PPS, MPS, TS and Data Acquisition are successfully established for the 1 st stage of commissioning. High Level Application is developed on the Integrated Operation Environment –IOE is written in java, and it ’ s API can merge several simulation and other IOE tools