EERI Seminar on Next Generation Attenuation Models Development of Corresponding Building Code “Design” Maps Nicolas Luco Research Structural Engineer USGS.

Slides:



Advertisements
Similar presentations
ESOH Committee Task Plan
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
I-Codes Development and cdpACCESS © Beginning with the 2015/2017 Code Development Cycle, ICC will begin utilizing their new online system called cdpACCESS.
Standards and Certification Training Module B – Process B5Consensus Process for Standards Development ASME S&C Training Module B5 Consensus Process for.
EERI Seminar on Next Generation Attenuation Models SCEC GMSV Workshop: Summary of Other Validation Methodologies/Applications Nicolas Luco, Research Structural.
New “Risk-Targeted” Seismic Maps Introduced into USA Building Codes
Characterization of Ground Motion Hazard PEER Summative Meeting - June 13, 2007 Yousef Bozorgnia PEER Associate Director.
1 Welcoming Remarks & Today's Task PEER GMSM Program Workshop, Richmond CA, October 29, 2007 Nicolas Luco Research Structural Engineer USGS, National Seismic.
E C C National Electrical Code process How did we get from there to here….
Using the HUB to Study Disaster Events Eric Letvin Director, Disaster and Failure Studies Program Engineering Laboratory National Institute of Standards.
#ICANN51 1 Standing Committee on Improvements Implementation (SCI) Activities Update to the GNSO Council ICANN-51 Los Angeles Meeting 11 October 2014.
Updating the Guidelines for the Seismic Design of Highway Bridges Status update for the Mid-America Ground Motion Workshop February 2003.
PCI/NSF/CPF PART 4: 1 of 18 NEES/EERI Webinar April Outline Introduce PCI/NSF/CPF DSDM Research Effort Review Key Behaviors of Precast Diaphragms.
Major Ongoing Ground Motion Research Programs at PEER Yousef Bozorgnia, Ph.D., P.E. PEER, University of California, Berkeley.
NTHMP MES Action Item Update January 27, 2010 Jenifer Rhoades Tamra Biasco Tom LeBlanc.
PROPOSED CHANGES TO THE 2007 NATIONAL ELECTRICAL SAFETY CODE.
CANDU Owners Group Inc. “Strength Through Co-operation” 1 Presentation to CNC-IAPWS May 23, 2003 AN OVERVIEW OF CANDU OWNERS GROUP R&D PROGRAM for CNC-IAPWS.
EERI Seminar on Next Generation Attenuation Models Role of SCEC Ground Motion Simulation Validation Technical Activity Group (GMSV TAG) in SEISM Project.
Section Events IES Annual Planning/Reporting District Events July New Officers and Board of Managers Aug President to Schedule Section BOM Yearly Meeting.
© 2008 Delmar, Cengage Learning Fire Protection Systems and The Model Code Process Chapter 2.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
RECENT AND PLANNED EERI ACTIVITIES IN SUPPORT OF THE FEMA EARTHQUAKE PROGRAM May 1st, 2013 Seattle, WA.
Translating the 2009 Provisions into ASCE 7-10: Ground Motions Maps
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
EERI Seminar on Next Generation Attenuation Models Post-Earthquake Building Tagging Nicolas Luco Research Structural Engineer USGS – Golden, CO Potential.
The Role of Building Codes in Delivering Seismic Performance John Hooper Director of Earthquake Engineering Magnusson Klemencic Associates.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Subcommittee on Hydrology, ACWI New Extreme Storm Work Group Status and Plans.
Workshop and Work Group Program/Programmatic Overview By the California Probabilistic Tsunami Hazard Analysis Work Group.
Wastewater Treatment and Disposal Upgrade Nampa Wastewater Advisory Group Meeting #10 October 9, 2012.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
A-5 AEROSPACE LANDING GEAR SYSTEMS POLICIES AND GUIDELINES.
EERI Seminar on Next Generation Attenuation Models Updates to Maps for the 2015 NEHRP Recommended Seismic Provisions Building Seismic Safety Council (BSSC)
Final Rulemaking: 25 Pa. Code Chapters 121 and 139 Measurement and Reporting of Condensable Particulate Matter Emissions Environmental Quality Board Meeting.
【New Draft】 France -Japan International Co-funding Joint call Schedule (revised version) APR. 11, 2017 Bpifrance / NEDO final meeting (week of 18/9) Announcement.
Task Group G Report January 17, 2003
2020 NEHRP Provisions Issues Ground Motion
Project 17 Report to Provisions Update Committee April 12, 2017
IEEE TGa Project Timeline
EU Implementation Programme
ARRT Activity Since Last Meeting (OCT 2014)
TG Chair: Mark Brinsden Shell
NEHRP Research: U.S. Geological Survey
Task Group API 19SS Sand Screens
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
ENGINEERING SERVICES Report National Sunroom Association
Office of Developmental Programs
P17 SDC* Working Group Meeting 2 *Seismic Design Category
doc.: IEEE <doc#>
Board of Early Education and Care May 12, 2009
doc.: IEEE <doc#>
doc.: IEEE <doc#>
doc.: IEEE <doc#>
September 8, 2016 Request Approval of the Determinations to be Submitted to Rules Review Commission for Subchapter 15A NCAC 02E (Periodic Review of Existing.
SCEC GMSV Workshop: Overview of Agenda
doc.: IEEE <doc#>
doc.: IEEE <doc#>
3 step process Step 1: Agency determination
doc.: IEEE <doc#>
IEEE SGa Project Timeline
Water Allocation Committee IBT Update July 2015
Task Group G Report January 17, 2003
NC’s 111(d) Plan Develop 111(d) State Plan consistent with Clean Air Act requirements Information requested from subject facilities Best System of Emissions.
Resource Adequacy Steering Committee Meeting October 4, 2011
TGg Report to the IEEE Working Group
The prevalence rate of AIDS among children in the United States and dependent areas was estimated at 2.2 per 100,000 at the end of The rate for children.
Presentation transcript:

EERI Seminar on Next Generation Attenuation Models Development of Corresponding Building Code “Design” Maps Nicolas Luco Research Structural Engineer USGS – Golden, CO USGS Workshop on Seismic Hazards of Guam/Northern Mariana Islands & American Samoa

MCE Map (≤‘09 IBC)MCE R Map (’12 IBC) Risk Coefficient Map Deterministic Map Risk-Targeted Map (1%-in-50yrs P.C.) (min) Hazard Map (2%-in-50yrs P.E.) Hazard Curves + scaling to max direction

HAZARD Maps  DESIGN Maps  e.g., 2014 Update of USGS Hazard Maps NEHRP Prov’s ASCE 7 Standard Intl Bldg Code

EERI Seminar on Next Generation Attenuation Models Design Maps Development Schedule Jan 3, ’12: Placeholder 2015 IBC change proposal submitted Jan 11, ‘12: Presented placeholder design maps to BSSC PUC “Development of Corresponding Building Code ‘Design’ Maps,” N. Luco, USGS July 6, 2012 USGS Workshop on Seismic Hazards of Guam/Northern Mariana Islands & American Samoa

EERI Seminar on Next Generation Attenuation Models 9) Design Maps for Guam “Briefing on PUC Design Mapping Task Group,” N. Luco, USGS January 11, 2012 Building Seismic Safety Council (BSSC) Provisions Update Committee (PUC) Meeting ASCE 7-10 S S1S1 S S1S NEHRP? Under Review 300% g 315% g 75% g

EERI Seminar on Next Generation Attenuation Models 9) Design Maps for American Samoa “Briefing on PUC Design Mapping Task Group,” N. Luco, USGS January 11, 2012 Building Seismic Safety Council (BSSC) Provisions Update Committee (PUC) Meeting ASCE NEHRP? S S S1S1 S1S1 Under Review 20% g 75% g 50% g

EERI Seminar on Next Generation Attenuation Models Design Maps Development Schedule Jan 3, ’12: Placeholder 2015 IBC change proposal submitted Jan 11, ‘12: Presented placeholder design maps to BSSC PUC Jan-Apr, ‘12: USGS hazard models completed (& published) May 5, ‘12: Requested disapproval of placeholder IBC proposal May 9, ‘12: Presented finalization plans to BSSC PUC … “Development of Corresponding Building Code ‘Design’ Maps,” N. Luco, USGS July 6, 2012 USGS Workshop on Seismic Hazards of Guam/Northern Mariana Islands & American Samoa

EERI Seminar on Next Generation Attenuation Models Design Maps Development Schedule July, ‘12: Public workshop to finalize consensus hazard models July-Aug, ‘12: Ballot final design maps through BSSC PUC July 31, ‘12: Submit final design maps to IBC as public comment Aug-Sep, ‘12: Public forums in Guam & American Samoa Oct 9-10, ‘12: Resolve BSSC PUC vote/comments Oct 22-28, ‘12: Final Action Hearings for 2015 IBC Nov, ‘12: DOD Unified Facilities Criteria update finalized “Development of Corresponding Building Code ‘Design’ Maps,” N. Luco, USGS July 6, 2012 USGS Workshop on Seismic Hazards of Guam/Northern Mariana Islands & American Samoa

EERI Seminar on Next Generation Attenuation Models Questions for Today Do the (published) USGS hazard models for Guam & American Samoa need to be revised? If so, in what way? If not, what are the explanations for the differences w.r.t. previous estimates (e.g. the 1997 NEHRP Provisions)? “Development of Corresponding Building Code ‘Design’ Maps,” N. Luco, USGS July 6, 2012 USGS Workshop on Seismic Hazards of Guam/Northern Mariana Islands & American Samoa

EERI Seminar on Next Generation Attenuation Models 9) Design Maps for Guam “Briefing on PUC Design Mapping Task Group,” N. Luco, USGS May 9, 2012 Building Seismic Safety Council (BSSC) Provisions Update Committee (PUC) Meeting ASCE 7-10 S S1S1 S S1S NEHRP? 285% g 275% g 70% g

EERI Seminar on Next Generation Attenuation Models 9) Design Maps for American Samoa “Briefing on PUC Design Mapping Task Group,” N. Luco, USGS May 9, 2012 Building Seismic Safety Council (BSSC) Provisions Update Committee (PUC) Meeting ASCE NEHRP? S S S1S1 S1S1 15% g 40% g 30% g