Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”

Slides:



Advertisements
Similar presentations
ASAS Thematic Network – Rome April 2003 Session 2-B Cost / Implications ASAS Impact on Ground Systems An Industry Viewpoint Thales ATM Peter.
Advertisements

The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
Air Traffic Management
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
Mediterranean Free Flight ASAS Separation and Spacing Presented by Andy Barff – Project Leader MFF Real-time Simulations ASAS-TN, Malmö
C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE ASAS-TN, 2nd workshop - Malmö 6 ~ 8 october 2003page 1 Electronic separation Clearance Enabling the Crossing.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Episode 3 1 Episode 3 EX-COM D Final Report and Recommendations Operational and Processes Feasibility Pablo Sánchez-Escalonilla CNS/ATM Simulation.
Interpreting RCP/RSP and Monitoring Results
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
Applications from packages I to III
Satellites enabling the integration in non- segregated airspace of UAS in Europe Dipl. Phys. Mirsad Delić, Dr. Henk Hesselink Dipl. Ing. Frank Morlang,
1 M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n Human Factors Considerations in Future Oceanic Air Traffic Control.
ASSTAR Oceanic Applications by Nico de Gelder, NLR ASSTAR User Forum #1 4 April 2006, Roma.
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
Federal Aviation Administration ASAS issues identified in the AP23 work ASAS-TN2.5 workshop 13 Nov 08, Rome By Jean-Marc Loscos, DSNA.
20 In-Trail Climb experience and an airlines view of ASAS opportunities Captain Rocky Stone United Airlines Manager – Flight Systems Technology.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
Workshop on FORMAL METHODS IN AEROSPACE, Eindhoven,November 3, 2009 Observability and Diagnosability of Hybrid Automata, and their application in Air Traffic.
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
Episode 3 EP3 WP6 - Excom - December 15th, Brussels 1 WP6 - Technology EP3 Final Report Technology results December 2009.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
ASAS FRA OB/T ATM Projects Lufthansa point of view.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Federal Aviation Administration Surveillance and Broadcast Services ADS-B In-Trail Procedures Presented to the ASAS TN 2.5 Workshop November 2008 Kenneth.
Federal Aviation Administration Data Communications Program Operational Trials in Domestic Airspace Presented to:Data Comm Implementation Team (DCIT) By:Jerry.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
The CASCADE Programme From Concept to Operations ASAS-TN Malmö September 2005 Alex Wandels CASCADE Programme Manager, EUROCONTROL European Organisation.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Lessons learned from pilot involvement in ASAS experiments Rob Ruigrok & Hans Huisman ASAS Thematic Network Workshop 3 “ASAS - Making it happen”, Toulouse.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
Slide 1 July 2004 – FALBALA/WP5/FOR4/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Mark Watson & Richard Pugh ( NATS) CARE / ASAS Action FALBALA Project Dissemination.
Airbus Status on ADS-B In / Out Update
Federal Aviation Administration AP23 briefing on D3: ASAS Concept of operations ASAS-GN Seminar 13 Nov 08, Rome By Ken Carpenter, QinetiQ.
National Aeronautics and Space Administration ADS-B In-Trail Procedures Overview of Research Results Presented to the ASAS TN2 Workshop September 2007.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
Aircraft Manufacturer Plans - Airbus Stéphane Marché – Airbus ASAS TN Glasgow, September 2006.
ASAS TN2 Briefing Cyro Stone 15 April 2008.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
2 nd Workshop, April 2006 ASAS in Tomorrows Airspace Pierre Gayraud, THALES Bob Graham, EEC Tony Henley, BAe Systems Dr Anthony Smoker, IFATCA ASAS-TN2.
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
1 Controller feedback from the CoSpace / NUP II TMA experiment ASAS-TN, April 2004, Toulouse Liz Jordan, NATS, U.K. Gatwick approach controller.
ASAS Crossing and Passing Applications in Radar Airspace (operational concept and operational procedure) Jean-Marc Loscos, Bernard Hasquenoph, Claude Chamayou.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
ASSTAR Airborne Separation Operations in Oceanic Airspace Bob McPike, NATS ASAS-TN2 Conference Glasgow, September 2006.
MFF is a EC Co-funded Programme  MEDITERRANEAN FREE FLIGHT Flight Trials Report ASAS TN2 1st Workshop | September 2005, Malmö Gennaro GRAZIANO 1/32.
4 th Workshop, Amsterdam, 23 rd -25 th April 2007 ASAS-SEP Applications Airborne Implementation Overall Architectural Considerations.
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
Page 1 July 28, 2003 Richmond Facility ATN 2003 IEE London Raytheon Integrated Data Link–RIDL
ASSTAR Overview Jean-Marc Loscos, DSNA
ASSTAR Oceanic Session Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Rome November 2008 Johan Martensson, CASCADE
6th May 2002 Current Status of FAA Controller-Pilot Data Link Communication (CPDLC) - Build 1, 1A, and Beyond M J A Asbury Presentation ATN3.3 The development.
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
Data Communications Program
ASSTAR Project Overview & User Forum Objectives
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”

Malmö 5 September. 27 th 2005 NUP ITP NUP – 1, ITP Objectives »ASAS in Oceanic Procedural Airspace »Non Iceland Specific »No increase in HF communication load »Short duration Situation »1999 »Before P.O. ASAS definition »No ASAS Spacing / Separation definitions »No Package 1 definition

Malmö 5 September. 27 th 2005 NUP ITP NUP – 1, ITP Definition Team »ATC Controller, Iceland CAA & Nav-Canada »Pilots, SAS & Air Canada Applications »Pilot Delegated – Track Crossing Procedure »Pilot Delegated – In-Trail Climb (ITC) & In-Trail Descent (ITD) »Pilot Delegated Station Keeping In Oceanic Non-Radar Airspace. »Pilot Delegated Movement between OTS Tracks. »Pilot Delegated Lateral Passing Manoeuvres On OTS Tracks.

Malmö 5 September. 27 th 2005 NUP ITP NUP – 1, Application Selection ITC / ITD (Later renamed ITP) »Most significant benefit expected »Simple to implement »Short ASAS Duration »In principle Level 3 / Separation Application

Malmö 5 September. 27 th 2005 NUP ITP The Traffic  Daily Traffic Pattern highly cyclic:  Approx. 12 hour period mostly west bound.  Approx. 12 hour period mostly east bound.

Malmö 5 September. 27 th 2005 NUP ITP

Malmö 5 September. 27 th 2005 NUP ITP

Malmö 5 September. 27 th 2005 NUP ITP This information is from the “Report of the NICE Task Force, The NAT/IMG Cost Effectiveness Program” from October 1999, in which LIDO GmbH provided the above diagram, in it’s section on “LIDO Flight Planning”

Malmö 5 September. 27 th 2005 NUP ITP NUP – 2, ITP Objectives »Validation »Pilot / Controller usability of application »Controller workload issues »Cost Benefit Issues »Benefit assessment »Fast time simulation ITP sole solution to Operational Problem? »Ground automation

Malmö 5 September. 27 th 2005 NUP ITP PO-ASAS Need to align ITP to PO-ASAS Definitions »ATSAW, benefits »RFG type, ATSAW type considered »Concerns with passing safety case »Changes in separation criteria »Need for Level 2 application »Not to be pushed to Package 2

Malmö 5 September. 27 th 2005 NUP ITP Air Space Utilization ?

Malmö 5 September. 27 th 2005 NUP ITP NAT TRACKS EAST BOUND TRAFFIC

Malmö 5 September. 27 th 2005 NUP ITP NAT TRACKS WEST BOUND TRAFFIC

Malmö 5 September. 27 th 2005 NUP ITP

Malmö 5 September. 27 th 2005 NUP ITP OTS Aircraft Climb Possibility

Malmö 5 September. 27 th 2005 NUP ITP

Malmö 5 September. 27 th 2005 NUP ITP A three day simulation december 2004  Day 1: base line scenario  Day 2: ITP, all aircraft equipped  Day 3: ITP, 80% equipped

Malmö 5 September. 27 th 2005 NUP ITP Traffic: real traffic from december NAT tracks, A, B and C No crossing traffic Time of entering the airspace: »From 11:30 to 18:00 Number of aircraft per track: »A: 9 »B: 49 »C: 45

Malmö 5 September. 27 th 2005 NUP ITP Participants: 4 controllers »1 female, 3 males »Age: 28 – 38 »ATC experience: 2 – 8 years 2 pilots »Requesting clearances and accepting messages.

Malmö 5 September. 27 th 2005 NUP ITP The process: Pilots asked for FL changes, both standard and ITP requests The controller accepted or rejected the request If clearance was issued the pilot would accept through CPDLC if ITP or via voice if standard clearance. For ITP clearances, regular level reports throuch ADS-C

Malmö 5 September. 27 th 2005 NUP ITP

Malmö 5 September. 27 th 2005 NUP ITP

Malmö 5 September. 27 th 2005 NUP ITP

Malmö 5 September. 27 th 2005 NUP ITP

Malmö 5 September. 27 th 2005 NUP ITP Briefing and training  Performed by an air traffic controller  An easy adjustment to new procedures  The working environment, FDPS and situation display the same as used in the Oceanic Area Control Center

Malmö 5 September. 27 th 2005 NUP ITP Measurements: ISA, during the simulation NASA-TLX Post run questionnaires Work shop environment at the end of each day Data on when the sectors were splitted

Malmö 5 September. 27 th 2005 NUP ITP Main results: Responsibility the main issue Workload increases with ITP but not significantly Number of simultaneous ITP contracts for a controller: 1 – 3 Easy adjustment to new procedures Phraseology needs adjustment Performance of ITP applicable within the simulation environment The controllers positive towards ITP

Malmö 5 September. 27 th 2005 NUP ITP NASA-TLX: ScaleValueWeight Mental Demand Physical Demand8.750 Temporal Demand Performance Effort Frustration Total Workload:49.25

Malmö 5 September. 27 th 2005 NUP ITP Reykjavik SPACING In Trail Climb Reykjavik ITP »HMI design and mockup evaluation »Early safety considerations Concept : The aircraft is responsible for ensuring spacing with designated traffic => Spacing application

Malmö 5 September. 27 th 2005 NUP ITP Spacing In Trail Climb HMI

Malmö 5 September. 27 th 2005 NUP ITP Spacing In Trail Climb : Conclusions Results : »Automatic altitude changes rejected »Pilot manual action on FCU is preferred (safety aspects) »Phase of flight not heavy »Computation by FMS of point of crossing with Flight Level »Would require significant FMS change »Time opportunity window considered useful »Requires significant FMS change »Alerts needed when spacing infringed Significant changes required not justified by Spacing ITC alone Airbus push for In Trail Procedures based on ATSAW ATSA-ITP developed at RFG

Malmö 5 September. 27 th 2005 NUP ITP NUP – 2, ITP Conclusions ITP »Simulation shows acceptable by controllers Spacing Application »Historical reasons for selecting »Stepping stone into level 3 application »No specific separation change required »Spacing role not realistic »80% equipage - > acceptable nuisance

Malmö 5 September. 27 th 2005 NUP ITP NUP – 2, ITP Conclusions RFG Level 0,5 & 1,5 Application »Logical simplification of the NUP ITP »Passing safety case ITP not sole means of solving problem »30 / 30 affects (RVSM results) »CPDLC usage already enabling an increase in actual climbs