1 LBT Q2 2008 Eng/SW Review ICS – Instrument Cooling System.

Slides:



Advertisements
Similar presentations
Fluid Mechanics.
Advertisements

Learning Outcomes Upon completion of this training one should be able to: Identify open loop and closed loop campus-type hydronic water system applications.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
Presented April 16, 2009 at the ACG Annual Meeting in Chicago, IL. GAYLON RICHARDSON Engineered Air Balance Co., Inc. Houston, Texas 5/7/20151.
HVACR312 - Refrigeration Metering Devices.
Direct Cross-Connection (a) A Clean-In-Place system is used to direct sanitizer from a reservoir to a recently cleaned milk tank. The sanitizer exists.
Heather Instasi Tulio Borel. Objectives Design a radiant heating system for a greenhouse located in Atascadero, CA Hot ethylene-glycol solution flowing.
Sean Kalman – Hays Fluid Controls
Hydraulics For The Long Term
 Install new air cooled high efficiency screw chiller (variable speed)  Install new fan coils with ECM motors and low temperature heating coils and proper.
NOvA Water Cooling System Erik Voirin, Mike Zuckerbrot Erik Voirin; Mike Zuckerbrot1NOvA Water Cooling System.
Specifying and Sizing Control Valves A design equation used for sizing control valves relates valve lift to the actual flow rate q by means of the valve.
DUCT EFFICIENCY AND HEAT PUMP PERFORMANCE Paul Francisco David Baylon Ecotope, Inc.
Water piping design.
Overview of Liquid Cooling Systems Peter Rumsey, Rumsey Engineers.
NCSX NCSX CDR May 21-23, 2002 Larry Dudek Slide 1 Facility Systems (WBS 62-65) L. Dudek, G. Gettelfinger, M. Kalish.
Maggie Alvarado Diego Azevedo Raphael Santos Cavalcanti Natalie Levings Richard Robards Bruno Vieira.
1 Medical Office Building. 2 Occupancy – 400 persons 8 a.m. – 5 p.m. Monday - Friday Building Characteristics Three stories 40,000 square feet (200’ x.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
The Refrigeration Process
Re-Commissioning of the Water Cooling System at Université de Sherbrooke Department of Buildings June 2008.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Eng/SW Review MCSC – Mount Control System.
Learning Outcomes Upon completion of this training one should be able to: Identify hydronic chilled water system applications. Define the difference between.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
LBT Q Engineering Review Instrument Cooling.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Maggie Alvarado Diego Azevedo Raphael Santos Cavalcanti Natalie Levings Richard Robards Bruno Vieira.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 LBT Q Eng/SW Review PWR: Site electrical power.
Lecture Objectives: Answer question related to Project 1 Finish with thermal storage systems Learn about plumbing systems.
LBT Q Engineering and Software Review ENGG Engineering General.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
PRINCIPLE OF OPERATION
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 10 : CONTROL VALVES IN CLOSED LOOP SYSTEMS.
1 LBT Q Eng/SW Review PLMG: Plumbing, Chiller Systems.
Technical Seminar on Application and Technical Specification June 2016
WELCOME. Glycol Refrigeration A most basic definition of refrigeration is taking heat from someplace we don’t want it and moving it to someplace where.
Lecture Objectives: Learn about thermal storage systems
Heat Transfer and Refrigeration Cycle
Heat Transfer and Refrigeration Cycle
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
CBETA Technical Review
HVAC Building & Floor Cooling System
UNIT IV AUXILIARY SYSTEM
Troubleshooting Hydraulic Pumps
water to water heat-pump
Lecture Objectives: Continue with Sorption Cooling
FRESNO COUNTY WEST ANNEX JAIL
CONFIDENTIAL Technical Seminar on Application and Technical Specification 21 June 2016 Rezza Arif Bin Mustapa Kamal Senior Engineer Project And Application.
Eastern Pennsylvania Laboratory Facility
The Basic Direct Expansion Refrigeration Cycle
Compound VCRS.
Desuperheater Heat Transfer Device Manufactured by Maniks
Increase your business
Pressure oscillation and the damper function
Feasibility of Ice Storage
Equilibrium.
Lecture 30 Heat Pump Systems.
Reheat Coil (Typical of 5)
System Curve Example Design Condition 20 ft.w.c. required each way to deliver design flow to and from the headers at the loads Distribution Pump Bell.
Presentation transcript:

1 LBT Q Eng/SW Review ICS – Instrument Cooling System

2 Highlights (Q2/2008) IC system is operating, it has not been commissioned IC system is operating, it has not been commissioned Both sides are operating, lightly loaded Both sides are operating, lightly loaded Upper and lower tree house commissioned action item list is Upper and lower tree house commissioned action item list is

3 Open Issues Technical Technical IC system not designed for fluctuating loads IC system not designed for fluctuating loads Heat exchanger on tree houses restrict flow to 7 gpm Heat exchanger on tree houses restrict flow to 7 gpm ICS needs to be tested to determine if design requirements are met, commissioning ICS needs to be tested to determine if design requirements are met, commissioning Chiller and IC system operates off of siphon principle, not good for our dynamic system Chiller and IC system operates off of siphon principle, not good for our dynamic system Schedule Schedule Verify operation, coil sizes, redo prints, proper bypass Verify operation, coil sizes, redo prints, proper bypass Financial Financial Maybe large if have to redesign, however, if it meets the requirements then there will be no more cost Maybe large if have to redesign, however, if it meets the requirements then there will be no more cost Resource Resource Searching for a consultant to address overall system design issues, has been a low priority, it will become high priority as instruments are added Searching for a consultant to address overall system design issues, has been a low priority, it will become high priority as instruments are added

4 Planning (Q3/2008) Find a solution to the flow restriction in the tree houses Find a solution to the flow restriction in the tree houses Test IC system for heat load performance Test IC system for heat load performance Install larger expansion tanks and pressure pumps near the elevation axis Install larger expansion tanks and pressure pumps near the elevation axis