Risk Analysis for Major Rehabilitation. Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation.

Slides:



Advertisements
Similar presentations
Chapter 7 Managing Risk.
Advertisements

PROJECT RISK MANAGEMENT
One Corps Serving the Armed Forces and the Nation Navigation Lock and Dam Inspection and Emergency Repairs Workshop ERDC Vicksburg, Mississippi April.
ICS 442 Software Project Management
20- 1 Chapter Twenty McGraw-Hill/Irwin © 2005 The McGraw-Hill Companies, Inc., All Rights Reserved.
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter Twenty An Introduction to Decision Making GOALS.
OPSM 639, C. Akkan1 Defining Risk Risk is –the undesirable events, their chances of occurring and their consequences. Some risk can be identified before.
Presented by Matthew J. LaChance Pavement Solutions for State, County, and Municipal Infrastructures.
Environmentally Impaired Property Transaction Analysis Combining Decision Trees and Monte Carlo Simulation Timothy Havranek and Poh Boon Ung October 2007.
 Life cycle costing, LCC, is the process of economic analysis to asses the total cost of ownership of a product, including its cost of installation,
Lecture(4) Instructor : Dr. Abed Al-Majed Nassar
FASAB Update CIGIE/GAO Financial Statement Audit Conference Wendy Payne Executive Director March 30, 2011.
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
CTC 475 Economic Analysis in Technology. Time Value of $ How to choose alternatives based on economics How to choose alternatives based on economics How.
Value of Information for Complex Economic Models Jeremy Oakley Department of Probability and Statistics, University of Sheffield. Paper available from.
PROJECT EVALUATION. Introduction Evaluation  comparing a proposed project with alternatives and deciding whether to proceed with it Normally carried.
System Engineering Instructor: Dr. Jerry Gao. System Engineering Jerry Gao, Ph.D. Jan System Engineering Hierarchy - System Modeling - Information.
Benjamin Krom, PE Michigan Department of Transportation.
Environmental Impact Assessment (EIA): Overview
NED COSTS And Other Bewilderments Of COE Planning And Other Bewilderments Of COE Planning.
University of Sunderland CIFM02 Unit 3 COMM02 Project Evaluation Unit 3.
Chapter 11: Project Risk Management
AT Benefit Cost Analysis Model Highway Design, Project Management and Training Section Technical Standards Branch Presented by Bill Kenny, Director: Design,
Managing Risk. Objectives  To Describe Risk Management concepts and techniques  To calculate and analyze a project using Probability of completion 
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
1 ECGD3110 Systems Engineering & Economy. 2 Lecture 1 Introduction to Engineering Economics.
“ Building Strong “ Delivering Integrated, Sustainable, Water Resources Solutions 1 What is Engineering Risk and Reliability? Why We Use It? Robert C.
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
Transit Revitalization Investment Districts Planning and Implementation of Act 238 of 2004 July 2006 Getting to TRID Lynn Colosi Clear View Strategies.
Introduction A GENERAL MODEL OF SYSTEM OPTIMIZATION.
UNEP Training Resource ManualTopic 7 Slide 1 The purpose of mitigation is to: F find better ways of doing things F enhance environmental and social benefits.
© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
43 rd Annual Western States Highway Equipment Managers Association Conference Washington State Department of Transportation Presentation August 29, 2011.
Integrated Risk Management Charles Yoe, PhD Institute for Water Resources 2009.
Policies and procedures for developing acquisition plans; determining whether to use commercial or Government resources; whether it is more economical.
Parts of this presentation is extracted from Ian Sommerville’s slides located at
CHEVRON PIPE LINE COMPANY Risk Based Prioritization Process.
PHARMAC What is PHARMAC? PHARMAC - the Pharmaceutical Management AgencyPHARMAC - the Pharmaceutical Management Agency A New Zealand Government Agency (Crown.
SOFTWARE PROJECT MANAGEMENT
Cost Management.
Mitigation and Impact management
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES The Disaster Mitigation Act of 2000.
Software Project Management
The Lower Mon Project William A. Karaffa, P.E. Project Manager Briefing to Waterways Association of Pittsburgh April 14, 2004.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Risk Management. 7–2 Where We Are Now 7–3 Risk Management Process Risk –Uncertain or chance events that planning can not overcome or control. Risk Management.
David Moser USACE Chief Economist
2006 Project Management Workshop External Independent Reviews Catherine Santana November 14, 2006.
QUANTITATIVE TECHNIQUES
Decision Analysis Pertemuan Matakuliah: A Strategi Investasi IT Tahun: 2009.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
Select Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
US Army Corps of Engineers BUILDING STRONG ® 1 Inland Marine Transportation System Capital Investment Strategy Jeanine Hoey, PE, PMP Program Manager 15.
Road Investment Decision Framework
Civil Assets, Stations & Facilities Project - ESTEEM (WLC) (Engineering Strategy for Economic & Efficient Management) April 2010.
Parts Management Agreements
Maintenance strategies
CAPITAL BUDGETING – CASH FLOWES
THE COUNTY OF YUBA OFFICE OF EMERGENCY SERVICES
Chapter Twenty McGraw-Hill/Irwin
Point and interval estimations of parameters of the normally up-diffused sign. Concept of statistical evaluation.
Manage costs and schedules for system replacement due to obsolescence
CPM, PERT & Schedule Risk Analysis in Construction
Software Project Management (SPM)
Indiana “Blue Ocean” Project
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Managing Project Work, Scope, Schedules, and Cost
CEng progression through the IOM3
Presentation transcript:

Risk Analysis for Major Rehabilitation

Major Rehabilitation Background  Prior to FY 1992  Funded under Operation and Maintenance, General, Appropriation  FY 1992 and subsequent  Study funded in O&M  Construction funded under Construction General Appropriation  Compete with New Starts

Major Rehabilitation Background  Objectives of program  Reliability improve reliability of a feature thereby extending its physical life and deferring capital expenditures to replace the structure  Efficiency Improvement enhance operational efficiency increasing outputs beyond the original project design

Major Rehabilitation Background  Cost Threshold for Inclusion in Program:  Reliability Inland Navigation--$10.4 mil. All Other--$6.5 mil.  Efficiency Improvement All--$1.28 mil.  Provided each year in Budget EC

Major Rehabilitation Background  Analytical Requirements  Equivalent framework to planning studies

Major Rehabilitation Guidance  Major Points  Objective of the Analysis  Base Condition  Analysis of Alternatives

Objective of the Analysis  Determine the Economically Efficient Rehabilitation Strategy  Commensurate values that differ in terms of risk, monetary values, and timing

Analysis Must Answer 1.Why are we doing this now? 2.What are the consequences of not doing this now? 3.Which project or component is in the most critical condition? 4.Which alternative rehabilitation strategy is the best?

Steps in the Analysis 1.Establish the overall engineering condition and reliability identifying problems associated with critical project features. 2.Identify and define existing and potential reliability problems and opportunities for efficiency improvements. 3.Identify alternative methods to resolve or manage the problem

Steps in the Analysis (cont.) 4.Develop cost estimates for proposed solutions 5.Determine if proposed project is eligible for funding under major rehabilitation 6.Estimate economic benefits and costs of the base condition and alternatives. 7.Identify cost sharing requirements 8.Identify all environmental concerns

Steps in the Analysis (cont.) 9.Identify the recommended plan 10.Develop M-CACES cost estimate for the recommended plan 11.Prepare draft Project Cooperation Agreement (PCA) if required 12.Prepare Project Management Plan (PMP) for recommended alternative

Engineering and Economic Evaluation Considerations  Required information  Project outputs and costs Normal conditions Unplanned outage conditions  Current and future reliabilities of project operation  Base Condition  Any Rehabilitation Strategy

The Base Condition  The condition used as the baseline against which all rehabilitation alternatives are measured  conceptually equivalent to the "without" condition in new project evaluation  assumes that the existing O&M practices will continue in the absence of rehabilitation  emergency repairs of feature components as they occur

The Base Condition  Describe using event tree  Probabilistic Scenario Analysis

To T1 Tn-1 Tn

PUP Functions  Probability of Unsatisfactory Performance  Instantaneous probability of component not performing as designed  Typically related to age or number of operations  Unsatisfactory performance must have measurable consequences

Example PUP Function

Rehabilitation Alternatives  Advanced Maintenance Strategy  schedule repair or replace of component to avoid emergency repair  Planned Repair Strategy  stockpile replacement parts and develop emergency repair procedures to reduce service disruption

Rehabilitation Alternatives  Scheduled Rehabilitation Strategy  determine "optimum" timing for rehabilitation based on reliability, service degradation, and economic costs  Immediate Rehabilitation Strategy  Rehabilitation with Efficiency Improvement

Impact of Alternatives  Changes the life-cycle cost time path of the project

NED Cost Timeline Base condition: fix-as-fail Alternative: Rehabilitate then fix-as-fail

Analysis of Alternatives  Calculate the Expected Present Value of Benefits and Costs for Each Alternative  Each alternative modifies some part of Base Condition event tree Typically reduces PUP value resulting in reduced repairs and downtime losses Makes the component “younger”

Base Condition PV  E[C] = [(1-p f,0 ) C nf + p f,0 C f ]/ (1+r) 0 + [(1-p f,1 ) C nf + p f,1 C f ] / (1+r) 1 p f,0 = 0.1 p f,1 = 0.11 C nf = $100 C f = $10,000 r = 5.625% E[C] = $ 2,216

Rehab Condition PV  E[C] = [(1-p f,0 ) C nf + p f,0 C f ]/ (1+r) 0 + [(1-p f,1 ) C nf + p f,1 C f ]/ (1+r) 1 p f,0 = 0.01 p f,1 = C nf = $100 C f = $10,000 r = 5.625% E[C] = $ 303

Analysis of Alternatives  Benefits  Avoided loss in project benefits compared to Base Condition  Avoided increase in project O&M and repair costs compared to Base Condition  Reduced project O&M costs

Analysis of Alternatives  Costs  Rehabilitation costs  Foregone project outputs during rehabilitation

Display of Results  Statistics of estimated benefits and costs (mean, variance, skew)  Tabular display of mean, standard error, and 90% confidence interval for net benefits of all alternatives  Graphic display of effect of alternatives on project benefits, costs, O&M costs, etc.

Example Results Table

Example Graphical Results

Decision Criteria  Rank alternatives based on expected present value of net benefits  choose alternative with largest expected present value  Supplement with risk considerations  probability that net benefit is positive  sensitivity analysis

Discussion