How 3D models and photos are organized in the database 08.09.2009 ADO-PO meetingTatiana KLIOUTCHNIKOVA.

Slides:



Advertisements
Similar presentations
WP7 ATLAS ID Barrel End Services T.J.FRASER UCL Aim: Using experience gained from work on the current ATLAS SCT Barrel, attempt an improved design and.
Advertisements

Magnet mur de plomb PRS, SPD Photo: Peter Ginter.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Design Office meeting Design office meeting.
CAD services for mechanical integration of large experiments Tatiana KLIOUTCHNIKOVA Introduction to a discussion aiming to collect comments and.
December 3, 20031Muon Integration Meeting B. Schmidt Introduction: The present architecture of the Muon System is based on the assumption that the maximal.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
ATLAS SLHC UPGRADE ENGINEERING – LIST OF DECISIONS which will affect the design of auxiliary systems layout and routing BASIC LAYOUT FOR BARREL and WHEELS.
Infrastructure for LHCb Upgrade workshop CAD integration EDMS: February 2015.
Development of Reference Geometry in CATIA Besik Kekelia Georgian Technical University SCSWT’2012 South Caucasus Software / Computing Workshop & Tutorial.
Adding New Volumes to G4 geometry Baseline Alexander Sharmazanashvili, GCCEC.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Work to Date Analysis Work –Random Vibration Analysis of RICH2 Structure PSD data from LEP Tunnel (Including affect of large ventilation system) Excitations.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
ATLAS EDUCATION AND OUTREACH march 1 st Coordinators: Michael Barnett and Erik Johansson Outreach Officer: Claudia Marcelloni.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
SiD Engineering Design for the LOI Kurt Krempetz (Layer 5) (Layer 1) VXD.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
2 nd PH-DT Training Seminar CERN TODAY An introduction to rapid prototyping techniques by C.Bault, PH-DT-EO NEXT on 3 th October at 11:00 Overview.
Survey techniques for experiments and advanced 3 D Digital Reconstruction Aurelie Maurisset, Christophe Bault, Andrea Catinaccio October 1 st 2010 Ref.
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
Proposal for routing of ATLAS TAXS region HL-LHC WP8.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
1 Antonio Romanazzi 3D CFD study of the ATLAS (UX15) ventilation system.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
DCal-ALICE integration and installation plan and status A. Tauro.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Removing the VTPC from the VERTEX magnets
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
LBNF CAD models, Drawings and Component list
ADO-PO section meeting. ADO : Atlas Detector Operation
VELO-installation meeting CERN, January 17, 2006
Geometry Description for Cavern Background
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
LHC Experimental Vacuum Systems Status October ‘07
EDMS, CDD, Catia, smarteam.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
for the transition region on behalf of the RPC upgrade group
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
Technical Support Activities in PH-ADO-PO
Installation plans from mid 2005
Question & Suggestions March 17th
OT Survey & Adjustment Outline: Survey technique at present
L H C A T L A S International Collaboration on the LHC Project
FLEXIBLE CHAIN GEOMETRIC MODEL PROCESSING AND STUDY
Presentation transcript:

How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA

Why we need databases of detector photos and 3D models? 1.Future studies of installation and integration of new parts of detector Example: study of installation of new Inner Detector for the Atlas Upgrade

Why we need databases of detector photos and 3D models? 2. Information about free space inside of detector for the integration of additional equipment : electronic boxes, cables, pipes…

Why we need databases of detector photos and 3D models? 3. Information about additional material inside detector is requested by physicists to be entered into their programmes for calculations and simulations Example: Sector 9 Z0 services and structures in 3D models.

Platform modifications- this passage will not exist Platform modifications - new passage should be created through the voussoir hole – both platforms need modifications on HO and IP sides Why we need databases of detector photos and 3D models? 4. For further modifications Sectors 3, 7 view from IP EES EEL

Presentation of database of Atlas photos 1.Muon community started creation of their database of photos for the inside part of the muon barrel detector (Alexi Gongadze and Claudia Marcelloni took >2100 pictures)

Presentation of database of Atlas photos 2. We decided to complete this database with photos of other parts: Calorimeters, Magnets, Small and Big Wheels, services in Barrel and end-cap gaps and also equipment on HS and HO structures (Alexandre Seletskiy and myself took > 900 pictures).

Presentation of database of Atlas photos The idea is to know from photos as much as possible information about the equipment : real routing of pipes and cable trays, free space inside existing trays, position of electronic boxes, racks, platforms, ladders… Quite often this information is not 100% reliable from models and drawings for many reasons.

CERN has chosen the CAD product “CATIA” for mechanical design. It is reinforced by the data management system “SmarTeam”. In more that D models (out of accumulated in Euclid) has been converted to Catia editable format. Until 2008 Starting from 2009 Drawings- CDD 3D models – EUCLID (+other CAD systems) Reports - EDMS Catia& SmarTeam engineering DATABASE Presentation of database of Atlas models

SmarTeam structure for ATLAS detector CDD folders Presentation of database of Atlas models

Example of integration of services and structures in Z0 region sector 11