ILC-EDR Kick-off Meeting Main Linac Integration Organization and Tasks Sept. 27, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Main Linac Integration To.

Slides:



Advertisements
Similar presentations
GDE-Tohoku Meeting WG-2 (SCRF) : Tasks and Goals Akira Yamamoto 1.SCRF efforts since Fermilab Meeting 2.Replan of SCRF R&D for TDP1 & 2 3.Tasks and Goals.
Advertisements

Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Cavity Technical Specification IWLC2010 WG3 industrialization session H. Hayano Geneva,Oct.2010.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Report of HLRF KOM S. Fukuda. Project Management Structure Area: Main Linac Technology (to be completed) Regional/Intsitutional Effort: - Director-US:
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Towards an International Linear Collider Barry Barish GDE 6-June-07.
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Global Design Effort Americas Region Efforts and Resources Mike Harrison GDE.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
International Linear Collider The ILC is the worldwide consensus for the next major new facility. One year ago, the choice was made between the two alternate.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Date Event Global Design Effort 1 ILC Engineering Design Phase - Status & Plans Mike Harrison GDE/BNL.
Plug compatibility Document ILC10 cavity integration session H. Hayano.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Work Packages Lutz Lilje GDE.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Requirements for Cryomodule What have to be inevitably realized?
Date 2007/Oct./25 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Report N. Ohuchi KEK 1.Cryomodule & Cryogenics KOM 2.GDE-meeting discussion I.Interface.
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
25-Sept-07 P5 Fermilab Global Design Effort 1 Report from GDE Barry Barish Caltech / GDE 25-Sept-07.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
ILC-EDR Kick-off Meeting Cavities Organization and Charges Sept. 19, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Cavities Held at DESY, Sept ,
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
Goals of the ILC-Asia Meeting at Pohang Fumihiko Takasaki PAL, Feb. 17, 2006.
Cavity and Cryomodule Plug-Compatibility To Reach Consensus Akira Yamamoto ILC-08, Chicago, Nov. 17, 2008 Nov. 17, 2008ILC-08 SCRF1.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Main Linac (SCRF) Technology Area Guidelines for the Meeting Akira Yamamoto Parallel Session ILC-GDE Meeting, Fermilab, Oct , 2007.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Tuner, Coupler WP & specification table H. Hayano, KEK GDE Sendai.
Report of HLRF KOM/ALCPG07 S. Fukuda(KEK) R. Larsen(SLAC)
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Saclay / Orsay visit – (GDE Project Managers) 1 R&D Plan: ‘Engineering Design’ Phase - presentation to Saclay / Orsay Marc Ross, Akira Yamamoto,
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
Global Design Effort Controls LLRF EDR Kick Off Meeting View from the Project Management Office Fermilab / ANL August 20, 2007.
SCRF: Monthly WebEx Meeting Oct., 19, 2011
SCRF WebEx Monthly Meeting Agenda and Reports from PM
Meeting for S1-Global module design Cryomodule and Cryogenics
ILC Project Management Status
ILC ‘Engineering Design’ (ED) Phase
Global System Kick-off Meeting
Report on plan to produce an Engineering Design Report
ILC-EDR Kick-off Meeting, Cryomodule and Cryogenics
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
High Gradient Cavities: Cost and Operational Considerations
ILC Global Design Effort
Nick Walker (DESY) EU GDE Meeting Oxford
Presentation transcript:

ILC-EDR Kick-off Meeting Main Linac Integration Organization and Tasks Sept. 27, 2007 Akira Yamamoto ILC-EDR Kick-off Meeting, Main Linac Integration To be held at Fermilab, Sept , 2007

ILC Project Management as a proposal for the organization toward EDR V ILC Council (ILCSC) Funding Agencies and Institutions Executive Committee Director, Regional Directors, Accelerator Experts, PMs ML Tech. A. Yamamoto Global Sys. M. Ross Accel. Sys N. Walker Asia y M. Nozaki US M. Harrison Europe B. Foster Technical Leadership (by Project Managers) - Engineering Design and R&D Regional Leadership (by Reional Directors) - Funding and Authorization Global Design Effort Institution Instit. …. Director’s Office Director: B. Barish Project Managers: M. Ross*, N. Walker, A. Yamamoto Many Tasks P. M. Office M. Ross Board - Accelerator Advisary - RD subpanel - Design & Industr. subpanel. -..

ILC Project Management and Sharing Responsibilities Project Managers responsible for –Leading the world-wide technical development effort efficiently and effectively –Setting technical direction and executing the project toward realization of the ILC Day-to-day project execution and commucniation Regional Directors & Institutional Leaders responsible for –Promoting, funding and authorizing the cooperation programs. Formaly responsible for institutional activities, funding and oversiting the technical progress,

Project Management Structure (baseline) Director’s Office - Director (B. Barish) - Project Managers (Ross (chief), Walker, Yamamoto) Project Man. Office (Ross, ) Groups: - System integration - Eng. Manage - Cost and schedule - X FEL liaison ML Technology (Yamamoto, Shidara, Kerby) Groups: -Cavity Process (Lilje) -Cavity Prod/Integ (Hayano) -Cryomodule (Ohuchi/Carter) -Cryogenics (Peterson) -HL-RF (Fukuda) -ML Integ. (Adolphsen) Global Systems (Ross, ) Groups: -Civil -Controls -Convent. Facil. Accelerator Systems (Walker ) Groups: - e- source - e+ source - Damp. Ring - BDS - RTML - Simulations Executive Committee Board - Accelerator Advisary - RD subpanel - Design & Industr. Subpanel. - Change Control Board Regional Effort

Project Management Structure Area: Main Linac Technology (to be completed) Regional/Intsitutional Effort: - Director-US: Mike Harrison - Director-EU: B. Foster - Director-AS: M. Nozaki Technical Effort (ML (SCRF) Technology): - Project Manager: A. Yamamoto - Associate Managers: T. Shidara, J. Kerby, * Group leader, ** Co-leader RegionsInstituteInstitute Leaders Cavity (Process) L. Lilje* Cavity (Prod./Int.) H. Hayano* Cryomodule N. Ohuchi* -H. Carter** Cryogenics T. Peterson* HLRF S. Fukuda* ML Integr. C. Adolphsen US Cornell Fermilab SLAC ANL J-lab H.Padamsee R. Kephart T.Raubenhaimer H.Padamsee C.Adolphsen H.CarterT.Peterson R. LarsenC. Adolphsen EU DESY CERN Saclay Orsay INFN Spain R.Brinkman J. Delahaye O. Napoly A.Variola C. Pagani L.Lilje C. Pagani Parma Franco Pal. Tavian AS KEK Korea Inst. IHEP India Inst. K.YokoyaNoguchi, Saito HayanoTsuchiya/ Ohuchi Hosoyama/ Nakai Fukuda

Technical Responsibilities : (from RDR Chapter 7) Green indicates a commitment: –institute will deliver MoUs facilitate connection: – Project Management (authority and responsibility) and institutions (funding and resources). The ‘C’  coordinating role in a WP –Each WP has one coordinator. Technical responsibility

Main Linac Integration Groups Organization for EDR-tasks Cavity Cryomodule Cryogenics Vacuum HLRF LLRF Control Beam dynamics, Quadrupoles, Diagnositic,,, US Cornell Fermilab SLAC ANL J-lab EU DESY CEA-Saclay -Olsay INFN Spain CERN AS KEK Korea Inst. IHEP India Inst.

Technical efforts to EDR Complete the critical R&D –as identified by the (R & D Board and) S0, S1, S2 task forced and.. Establish the base-line design, –Technologies to be chosen and to be demonstrated through pre- mass-production –Learn industrialization Obtain the maximum benefit from the realized project Proceed alternate design and development –As technology back-up to achieve the ILC design goal, with “Plug-compatible” concept, and for maximizing performance/cost (value-engineering)

Technically Driven Timeline proposed by GDE Director August BCD All regions ~ 5 yrs Construction  Startup Siting Plan being Developed RDREDR Begin Const End Const Engineer Design Site Prep Site Select R & D -- Industrialization Gradient e-Cloud Cryomodule Full Production System Tests & XFEL Detector Install Detector Construct Pre-Operations

2007/08 EDR Milestones 07-8:Korea ILCSC: »New EDR organization start, 07-9, 10: EDR Kick Off Meetings 07-10:Fermilab ILC-GDE meeting »Establish initial Base-line for ED phase »EDR Work Packages to be discussed 08-1,2EDR-R&D Meetings 08-3 Tohoku (Japan) GDE Meeting

M.L.I. – EDR Tasks and Discussions in KOM Base-line Design and interface parameters to be verified, –Functional parameters and interface conditions to be unified, –What have to be achieved and what have to be maintained, –What can be plug-compatibly improved, –How the tasks can be shared among sub-groups, Critical Goal: –Technology to achieve E-op = 31.5 MV/m Otherwise, need to reduce the gradient or adjust the machine design Need a vital program of both R&D and demonstrations Important Work at Main Linac Integration tasks –System optimization for the best “value engineering”, such as Beam dynamics and quadrupoles system design, Cryomodule design to be optimzed with cryogenics system design

Summary for Charges Functional performances and Interfaces to be verified, EDR design work and R&D (goal) –Basic R&D to be completed –Learning mass production Discussions towards –“unified design/specification” and/or “”plug- compatible design/specification Task sharing and schedule

Appendix For discussions

4 th generation prototype ILC cryomodule Cavities & Cryomodules Producing Cavities

ML (SCRF) Technology Design Parameters As of Sept. 27, 2007 To be integrated

Cavity RF propertiesFrequency1.3 GHz Gradient31.5 MV/m 35 MV/m Opertaion Vertical test Q01.0 E MV/m HOM dumpingQ R/Q Short range wake T-operation2.0 K Physical Prop.Length-- m Aperture-- mm Alignment acc.300 um MaterialNb Wall thickness2.8 mm Stiffness Flange/sealMaterial? Pressure Lorentz F detune. at E-max 1.00 kHz Out. Dia. He vessel Mag. shieldingInside/outside

Coupler Power Req.Operation400 kWFor 1,300 us Processing100 kWUp to 400 us 600 kW> 400 us Processing timeWarm--- hours, Cold--- hours Heat loads2K 4 K 40/80 K Cavity vac. Integ.2# of windows biss R RF propertiesQextYes/Notunable Tuning range1- 10 E6If tunable Physical prop.PositionSee cav. lentgh Flangecompatible InstrumentationVac. level Spark detection Electron current temperature

Tuner Slow tuner Tuning range600 kHz Hysteresis Allowed Power-off Holding require. Physical envelope Mag. Shielding2 mGAt cabity surface Survive Freq. Change in lifetime of machine Could be total number of steps in 20 year, ~ 20 mio. Steps in TESLA? Fast tunerTuning range1 kHzOever flat-top Survive Freq. Change in lifetime of machine Number of pulses over 20 years. R

Cryomodule 8 cav+ 1 quad.9 cav.9 cav. + 2 q6 cav. 6 q…. Number Heat load2K 5K K Phys. Prop. Vacuum Ves.Lengh Out. Diameter Inner diameter Connection flange to input coupler Dimension Position Tolerance Connection flanges to Next cryomodule Dimension Tolerance He jacketLength Outdiameter Inner diameter Support position Cooling pipesOuter diameter Inner diameter Location Maximum pressure Thermal rad. S.Number of shieldOne or two Support postNumber of postR Quardupole mag. Field gradien Lengt Number of correctors, Alignment, Tolerance, Vibration, A

Cryogenics Cryomodule PressureTemperature Nominal range LineMAWPMin.Max.Min.Max kPakP KK 1.3 GHz RF cav.B, G , Subcooled HeA2, Cold thermal int.C.D,2, Warm therm. int.E, F2,2001,8002, Warmup/cool d.H UncertaintyPlant Ov. Cap. CryoplantEfficiencyMin. % carnotStaticdynamicFactor 2 K level22 % K level K

HLRF

Beam Dynamics (Q. BPM.. )