Support in implementation of the Law on Integrated Prevention Pollution and Control The Law on IPPC was adopted at the end of 2004 Six bylaw drafts were.

Slides:



Advertisements
Similar presentations
© European Communities, 2007 Purpose The European Integrated Pollution Prevention and Control Bureau (European IPPC Bureau) of the JRC/IPTS was set up.
Advertisements

EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.
Industrial Pollution Control - Harmonization and Implementation in Bulgaria Slavitza Dobreva Ministry of Environment and Water Bulgaria Final Seminar.
Romanian experience on the transposition and implementation of the IPPC, LCP, Seveso II, Waste Landfill, VOC Directives – experience and lessons learnt.
The Industrial Emissions Directive (IED) 2010/75/EU
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
SERBIA AND MONTENEGRO Tanja Popovicki Department for International Co-operation Ministry for the Protection of Natural Resources and Environment of the.
Practical use of newly developed BAT conclusions Valts Vilnītis.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
Harmonization and Implementation/Enforcement of Environmental Legislation in the field of Industrial Pollution Control in Latvia Ilze Kirstuka Director.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
IPPC IN MINING AND METALLURGY IN THE REPUBLIC OF MACEDONIA Bosko Nikov
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
SATI TEXTILE GROUP IPPC IMPLEMENTATION 23 March 2012.
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
Report on the current legal structure and resources available to the environmental protection agencies and inspectorates in Croatia 1st BERCEN Exchange.
IPPC Directive state of play and future developements
IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA Ankara, Turkey 5-6 November 2009 
TRANSPOSITION AND IMPLEMENTATION OF THE IPPC, LCP, SEVESO II, VOC DIRECTIVES – EXPERIENCE AND LESSONS LEARNT Kalin Iliev Nikolay Savov Ministry of Environment.
Implementation of IPPC and its application to sectors in different industrial scales – Experience of Czech Republic Jan Slavík, IPPC Unit - MoE of Czech.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
1 Permitting of industrial facilities in Croatia.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
IPPC transposition and experience with its implementation in the Czech Republic ?? …!! AjPíPíSí ??
AйПиПиСи ?? IPPC implementation - experience from new EU member countries & changes brought by Industrial Emissions Directive Monika Přibylová Kiev, 10.
The Process of Development of IPPC Legislation Robert Sarlamanov MA, IPPC Expert Ministry of Environment and Physical Planning, Bercen Exchange Programme,
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
The conception of Information System on Integrated Pollution Prevention and Control (IS IPPC) Ing. Blanka Kapustová, PhD. Slovak Environmental Agency Centre.
Implementing legislation for Integrated Permitting Monika Pribylova 1 October 2013 года Air Quality Governance in the ENPI East Countries.
Republic of Serbia BENCHMARKING AND SETTING ENVIRONMENTAL COMPLIANCE AND ENFORCEMENT INDICATORS Ministry of Science and Environmental Protection Directorate.
Consultant: CMDC Joint Venture EIA, IPPC and SEVESO Links.
Priority Environmental Investment Programme National Workshop Serbia Overview Of EU Waste Policy Belgrade, 8 th May 2008 Ruslan Zhechkov, REC
PERMIT ISSUANCE SYSTEM IN CROATIA ENVIRONMENTAL REVIEW Authors: Jasna Paladin-Popović Iva Milić Štrkalj Renata Sinovčević Brijuni, 27 November /21/02Croatia.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
First ECENA Plenary Meeting January 2006, Zagreb Croatia Serbia-Update on strengthening the implementation and enforcement of EU environmental legislation.
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 Update on the IPPC directive transposition and implementation in Republic of Serbia Directorate.
Iuliana CHIDU European integration counsellor Ministry of Environment and Water Management Prague - CZECH REPUBLIC April 2005 DIRECTIVE 96/61/EC.
BERCEN plenary meeting Sofia, March 18, 2005 Agenda item 8 Draft Scope and Proposed Location of BERCEN Training 2005 BERCEN Secretariat.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Third BERCEN Plenary Meeting December , Brussels Belgium The key achievements in environmental enforcement and compliance REPUBLIC OF SERBIA.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
Ministry of Environment and Physical Planning Status of the LRTAP Convention and its recent protocols in the Republic of Macedonia St.Petesburg,
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Consultant: CMDC Joint Venture Czech experience - Use of BREFs and national BAT notes, role of IPPC Agency, Czech TWG Multi-Country Workshop June 8th,
The current legal situation
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
1 Kosova/o ECENA 3 rd Plenary meeting September 18-19, 2008 Istanbul, Turkey.
1 Review of the IPPC Directive and related legislation Second Meeting Of Working Group E On Priority Substances 17 October 2007 Filip FRANCOIS – DG ENV.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
This Project is funded by the European Union Project implemented by Human Dynamics Consortium FINAL STEERING COMMITTEE MEETING BELGRADE, 2 FEBRUARY 2016.
Introduction to the philosophy
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
WEST BALKAN WORKSHOP ON WASTE SERBIAN REPORT
SERBIAN NATIONAL ACTION PLAN [DRAFT]
Aleksandra Antonowicz Green Federation GAJA/CCB
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

Support in implementation of the Law on Integrated Prevention Pollution and Control The Law on IPPC was adopted at the end of 2004 Six bylaw drafts were adopted in 2005 and 2006 Three bylaw drafts are in preparatory phase (to be adopted in six months) Deadline to obtain IPPC permits is 2015 Department for IPPC formed in Ministry of Environmental Protection (provides 8 working places and 5 are filled by now) In the preliminary list of IPPC installations there are 242 existing installations Not even one IPPC permit is issued until today nor application for it Only one simulation of issuing IPPC permit for Cement industry HOLCIM (Serbia)ad. In Popovac in the scope of ECBP-2003 and DHV Project

Application of BAT in Serbia Cement industry (privatized, changing fuel, starting with an alternative fuel, installing filters, continuous monitoring of emissions, first installations that are in procedure of issue permit) Holcim *(Serbia)ad. – 6,5mil Eur Metal industry (partly privatized, improvement of technology in the beginning) Chemical industry (very bad situation, far from BAT requirements, except pharmaceutical industry) HIP Petrohemija -8mil Eur Thermal power installations (installing electro filters and continual monitoring emissions, the biggest problem is emission of sulphur dioxide, very big investments for desulphuration process) EPS -90mil Eur invests in ecology Waste management (accepted concept of project for 29 regional sanitary landfills)

Necessary help Training of all levels authority employers, SEPA, SEPF and Provincial authority responsible for environmental protection (employees on issuing IPPC permit and inspectors) –Experience exchange in appliance of BREF document –Applying BAT documents in the procedure of issuing IPPC permit –Creating instructions for polluters Training of employees in IPPC installations –Following up and applying BAT documents in installations Efficient and effective system of communication and reporting Possible improvements of existing laws and bylaws (changes and annexes) WE MUST prevent the pollution at the “end of pipe”!