West Coast Light Sources Simon Clark 2004 COMPRES Annual Meeting Granlibakken Resort and Conference Center, Lake Tahoe, California June 19-22, 2004.

Slides:



Advertisements
Similar presentations
Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
Advertisements

Director’s Welcome Jonathan Dorfan 32 nd Annual SSRL Users Meeting October 17, 2005.
Pressure-Induced Polymerization of Dehydro[24]annulenes Derivative Shimizu-group M1 NAKASE Tomoya 1.
Structure determination at megabar pressure New possibilities for high-pressure single-crystal XRD Development project and COMPRES sponsored workshop Przemek.
Pressure-Induced Polymerization of 24NHBn(Dehydro[24]annulenes) Shimizu-group M1 NAKASE Tomoya 1.
Update on Laser Heating at the ALS Simon Clark Laser heating workshop Saturday March 20 th 2004.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
Office of Science Office of Biological and Environmental Research Roland F. Hirsch Biological Systems Science Division Workshop: Applications of new DOE.
Sept. 18, 2008SLUO 2008 Annual Meeting Vision for SLAC Science Persis S. Drell Director SLAC.
8 th Jun SEM X International Congress X-Ray Microdiffraction on Diamond-shaped NiTi for Biomedical Applications Apurva Mehta SSRL/ SLAC, Stanford.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Synchrotron Radiation Science at SLAC Joachim Stohr, SSRL Deputy Director July 6, 2004.
LCLS Studies of Laser Initiated Dynamics Jorgen Larsson, David Reis, Thomas Tschentscher, and Kelly Gaffney provided LUSI management with preliminary Specifications.
LCLS Linac Long Lead Procurement Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
LCLS NEH Operational and User Safety Programs
Investigation of fluid- fluid phase transition of hydrogen under high pressure and high temperature 2014/11/26 Shimizu laboratory SHO Kawaguchi.
GSECARS Update 13-BM-C Side Station Scientific programs is DAC diffraction and surface science Proposed partial funding as COMPRES Infrastructure Project.
DAC Center at NSLS H. K. Mao (spokesperson)
Main Bullet #1 Main Bullet #2 Main Bullet #3 Canadian Light Source National Synchrotron Light Facility.
SESAME Status Ahed AL Adwan (SLS, SESAME) EPICS Collaboration Meeting Bessy, May 2002 Synchrotron-light for Experimental Science and Applications in the.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II XPCS/SAXS workshop Jan 10 th 2008.
COMPRES 2008 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13- BMD (bending magnet end station),
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES User Access and Beamline Development John Hill Director, NSLS-II Experimental Facilities Division NSLS-II User Workshop.
On the way to neutron scattering at 40 T Report from this workshop Discussions with NSF/DOE/SNS Letter of Intent to SNS Conceptual design project proposal.
Laser Heating at Description of simultaneous Laser Heating and XRD. Pt and NaCl. Sander Caldwell, Dylan Spaulding, Simon Clark.
1 BROOKHAVEN SCIENCE ASSOCIATES Experimental Facilities J.P. Hill Experimental Facilities Division Director PAC Meeting November 20, 2007.
Status of the Spanish Light Source David Beltrán.
Laser Assisted High Pressure Phase Transformation in SiC
High Pressure study of Bromine Shimizu Lab M2 Hayashi Yuma.
High Pressure study of Bromine
High-pressure study on the crystal structure and the spin-state of Ni ions in the triple-layer T′-La 4 Ni 3 O 8 John B. Goodenough, University of Texas.
Phase diagram of solid oxygen at low temperature and high pressure
Alexei Yu. Kuznetsov 1, Vitali B. Prakapenka 1, Andrew J. Campbell 2, Thomas S. Duffy 3, Guoyin Shen 4, Dion L. Heinz 1, Mark L. Rivers 1, Stephen R. Sutton.
COMPRES 2007 Annual Meeting GSECARS Update  Now have 3 beamlines running 100% of the time: 13-ID-D (undulator), 13-BMD (bending magnet end station), 13-BMC.
Multi-anvil at the NSLS Michael Vaughan Liping Wang Jiuhua Chen Baosheng Li Li Hélène Couvy Wei Liu Carey Koleda Bill Huebsch Ken Baldwin.
Pressure Scales & Hydrostaticity National Institute for Materials Science (NIMS), Tsukuba, Japan TAKEMURA Kenichi COMPRES workshop on pressure scales,
7/23/99 NIH/NIGMS Support of Structural Biology NIH individual research grants with crystallography projects (FY 98) –primary: 225 grants, $51M total costs.
Simon Clark Advanced Light Source, Lawrence Berkeley National Laboratory, Berkeley, CA94720 Report on West Coast Activities COMPRES AGU: Mohonk Mountain.
Pressure-Temperature Stability Studies of Talc and 10-Å phase using x-ray diffraction. Arianna E. Gleason 1, Martin Kunz 1, Stephen Parry 2, Alison Pawley.
COMPRES Facilities Agenda 9:30 Mark Rivers—Introduction to COMPRES Community Facilities 9:40 Mark Rivers—GSECARS Update 9:45 Simon Clark—West Coast Synchrotrons.
DAC Center at NSLS Q. Z. Guo (X17B3) Jingzhu Hu (X17C) Z. X. Liu (U2A) R. J. Hemley (IR spokesperson) H. K. Mao (Xray spokesperson) Geophysical Laboratory,
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II Nanoprobe Workshop February 15 th 2008.
Structural Determination of Solid SiH 4 at High Pressure Russell J. Hemley (Carnegie Institution of Washington) DMR The hydrogen-rich solids are.
X-17 DAC Operations at NSLS Progress Report June 2007 Jiuhua Chen.
Plans for the DAC Program at X-17 Short term (existing $90K) Purchase symmetric DACs and diamonds Install Laue-Laue mono in 17B3 (NSLS provides) Improve.
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
Pre-workshop questions 1. What are our immediate needs for an ALS laser heating system? 2. What are our future ideals for an ALS laser heating system?
BROOKHAVEN SCIENCE ASSOCIATES NSLS-II - New opportunities for high pressure research - Lars Ehm National Synchrotron Light Source Brookhaven National Laboratory.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
LCLS 2009 NSLS-II 2015 APS 1995 BES Light & Neutron Sources SPEAR ALS 1993 HFIR 2008 SNS
Nondipole Effects in Chiral Systems Measured with Linearly Polarized Light K.P. BOWEN, O. HEMMERS, R. GUILLEMIN, W.C. STOLTE, M.N. PIANCASTELLI, D.W. LINDLE.
COMPRES Annual Meeting, June 2011 COMPRES is funded by Cooperative Agreements with the NSF Division of Earth Sciences [ ] COMPRES at Kingsmill.
ALS MRPI Business meeting Overview of the Beamline PRT Structure Scheduling and Allocation Future upgrade plans Financial report.
Why are. we not solving more struct tures? James Holton University of California San Francisco and Advanced Light Source Lawrence.
Experimental Facilities Planning
Meetings 2018 Letter of intent: (Deadline) Full proposal: (Deadline)
The Phase Diagram of FeO
Experimental Program and Endstations System (WBS ) J
Linac Coherent Light Source Transition to Operations 11 July 2007
Presentation transcript:

West Coast Light Sources Simon Clark 2004 COMPRES Annual Meeting Granlibakken Resort and Conference Center, Lake Tahoe, California June 19-22, 2004

West Coast Light Sources Advanced Light Source, Berkeley SPEAR3, SLAC SPPS, SLAC LCLS, SLAC

Who was who at the ALS

Who’s who at the ALS? ?

Three beam lines for high-pressure BL11.3DAC powder and single crystal x-ray diffraction BL1.4DAC infra-red spectroscopy BL12.2.2DAC XAS and x-ray diffraction resistive and laser heating

Support facilities HP labGasket prep., cell loading, Raman Ruby line SoftwareJCPDS, Fit2d …….

BL11.3

Understanding strength in materials: OsB 2

Run 1 Run 2 Bo = 395 GPa

BL1.4

BL1.4: Study of Talc and 10A phase

BL12.2.2

Current end station configuration

First experiment

Laser heating system in lab.

Schematic of laser heating system

Laser heating goes live!

Heating fluids

Outline development plan for beam line Beam line Construction Phase JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC 2002 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC 2003 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC 2004 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC 2005 Conceptual Design Review Beam line Design Review Beam line Ready for Commissioning End Station Ready for Commissioning Begin PRT Operation Begin User Operation JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC 2006 Start Project Order Long Lead Time Items Beam line Design Phase Beam line Construction Phase Commissioning Phase Honeymoon Period: PRT Only Operation PRT and General User Operation Outline Proposal Submitted Full Proposal Submitted

Summary ALS Beamlines 11.3 and 1.4 fully operational Beamline in commissioning with friendly users SPEAR3 No plans as yet SPPS First test experiments this year LCLS Letter of intent submitted Proposal for development program submitted