The Bomb in the Basement Gas powered plant in enclosed plantrooms.

Slides:



Advertisements
Similar presentations
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Isolation Positive isolation of dangerous fluids is providing a safe environment during.
Advertisements

Safety Design Requirements for Class A Ovens ELC International Inc. (Loss Control through Engineering)
Regulations (Standards - 29 CFR) Flammable and Combustible liquids
Fired And Unfired Pressure Vessels
Compressed Gas Cylinder Safety
Aspirated Smoke Detection
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
Safety Gas Plus.
Mechanical Plan Review. Review Plan Package Use Group/Occupancy Correct Code Reference/Conformance Revisions Mechanical Plans/Spec Books Structural Plans.
DATA ONE, EUROPEAN OPERATIONS CENTRE, ST. PETERSBURG, RUSSIA Presentation of Design Proposal.
AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING Prepared by: Wajdi abu-muhsen Khaled aamer Ahmad Al-Hunate Nabeel.
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
© Siemens Industry, Inc Confidential / Drive Your Business Forward Ignite the Power of New Products and Partnerships Siemens Fire Partner Summit.
Codes and Standards to be followed in the design and construction of the Green Energy facility National Fire Protection Assoc (NFPA); American Gas Association.
The Life Safety Surveyor Facility Tour
Gas Transmission Pipelines
March 14, 2003 MICE Absorber/Coil Integration MICE LH2 Absorber 1.Assembly 2.Safety 3.Staging 4.Instrumentation.
Unit 206: Domestic hot water systems
CSE 466 – Fall Introduction - 1 Safety  Examples  Terms and Concepts  Safety Architectures  Safe Design Process  Software Specific Stuff 
Pixel Cooling System Modifications C. Newsom December 17, 2009 University of Iowa.
Welcome to Field Controls: HRV / ERV Training Duct Systems Part 3
Ventilation for Confined Spaces requires ventilation as follows: An employee may not enter the space until the forced air ventilation has eliminated.
CNG STATION & GARAGE MODIFICATION CODES & STANDARDS Graham Barker Business Development Manager.
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
NFPA-12 Edition 2005 What “IMPACT” will the changes to NFPA-12 have on the design and installation of a CO 2 system?
Kidde Engineered Fire Suppression System 25 bar Equipment Hardware Engineered for use with 3M™ Novec™ 1230 Fire Protection Fluid.
Patrick Thornton, SNS/FPE June 9, 2008
EGRESS AND FIRE PROTECTION
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Dr Daniel Colbourne 36th Meeting of the Open-ended Working Group of the Parties to the Montreal Protocol – Side Event UNEP.
Domestic Natural Gas Installations Marc Billington.
HVACR311 – Electrical for Refrigeration International Mechanical Code Relating to Refrigeration.
“We Bring Engineering to Life” U.S. Tobacco GAP – Barn Testing Procedure.
Burners TRAining CEntre. RESIDENTIAL GAS BURNERS R D B R D B series GOALS: KEEP STRONG OUR POSITION ON RESIDENTIAL GAS BURNERS DEDICATED TO OEM’s MARKET.
Air Conditioning International Mechanical Code
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Basic Awareness Training for all Staff
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Explosion An explosion is a rapid expansion of gases resulting in a rapid moving pressure or shock wave. The expansion can be mechanical or it can be.
1 HVACR318 – Refrigeration II International Mechanical Code Relating to Refrigeration.
Refrigeration System Equipment Room Design
Application – Identifying, Listing Equipment, and Documentation
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
1 System Design. 2 Primary Detection Secondary Detection Standards Pipe Design.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Sandra Nilsen et. al Determination of Hazardous Zones Case study: Generic Hydrogen Refuelling Station.
Subpart F - Fire Protection & Prevention ( ) Flammables/combustibles - Approved containers Fire protection program/equipment 2A fire extinguishers.
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
BY FRANS WILBRINK WILBRINK & ASSOCIATES. OUTLINE Classify the different types of hazardous areas Identify the risks associated with each of these areas.
Fault Tree Analysis for Fatality Prevention Dr. Steven A. Lapp President - Design Sciences, Inc.
Introduction of HYUNDAI CNG BUS
Flammable Liquids Directorate of Training and Education
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
Heat transfer Steady state conditions not for dynamic systems in buildings through walls, roofs, floors, windows, doors building structures and U-values.
2. Hazards Survey Suitable for identifying hazards for equipment design, layout, storage etc. Can be as simple as survey of inventory/stock of hazardous.
Refrigeration Issues and Developments
THUM Adapter Impact on Hazardous Area Classification
“ Highlighting the risks and challenges presented by modern data-center cooling systems in fire detection and suppression applications. “ Dave Boyack Sales.
Hot water Systems Heaters.
Firefighting equipment
HAZOP Guidewords Base Set
Risk Management Student Powerpoint
Gas Transmission Pipelines
Presentation transcript:

The Bomb in the Basement Gas powered plant in enclosed plantrooms

Introduction NOTE - This presentation is only for lighter than air natural gas (methane) – not LPG! Building Code requirements Compliance documents Functional objectives Overseas codes and standards Failure modes Design guidance and recommendations

Current NZ requirements Compliance documents 1.Enclosed in a fire rated room 2.External access 3.Any internal door must have a smoke lobby and heat detector 4.Floor at or above ground level 5.At least one side is on an external wall Hazardous atmosphere fires / explosions are outside C/VM2. NZBC compliance docs allows mechanical or natural ventilation

NZBC requirements NZBC classes C2.3 Fixed appliances..so that there is a low probability of explosive or hazardous conditions occurring within any spaces.. C3.9 Buildings must be designed with regard to the likelihood and consequence of failure of any fire safety system. Fire Service access and operations Overseas building codes allow internal gas plant, or make no mention of it. A risk assessment may be required in some cases. NFPA 52 (National Gas Code) NFPA 101 and IFC model codes (USA) Approved Document B (UK) Institute of Gas Engineers and Managers SR/25 and UP 16

Risks and consequences Risk of explosion – not just fire How do you clear the room if it is full of gas, especially with no external access? 7 dead, 50 injured in Harlem gas explosion, destroys 2 buildings (2014) 2 dead in house gas explosion (September 2015 – UK) “Boiler explosion rattles California school” 2014

Design approach Air and ignition sources cannot be controlled Suppression won’t work for explosions - control the room so it is considered to be non – hazardous - Objective is zoning to be “Zone 2 – negligible extent” Most guidance on this is by the petrochemical industry and not completely relevant to building services. Design guides include: IGEM SR/25 2 nd edition – Hazardous area classification of Natural Gas installation IGEM UP/16 – Design of Natural Gas installations on industrial and commercial premises with respect to hazardous area classification and preparation of risk assessments. AS NZS (2010) A more generic risk assessment approach such as AS/NZS and HB436:2013

From King Flame failure detector Auto gas shut down valve Manual gas shut down valve Pressure regulator

Fault assessment References 1- Flamegurad rtech sheet 2 -Bentley Nevada tech manual pg worst case = from OGP risk assessment data directory 4 - estimated From HB of smoke control for smoke control fans Pfail (gas leak from fitting)9.95E-05 Pfil (gas leak) - mech not indep9.95E-04 Conditional on gas detection working unless running at full capacity all the time Failure is taken as >30% LEL with an annual occurrence of less than 1*10 -4 / year (approx. 1 hour per year) (Cox etal). Need to assess operating frequency / duration for exposure risk “Failure on demand” assessment using fault tree, HAZOP etc Simplified burner fault tree -failure on demand

IGEM SR25 assessment information required 1.Get information on appliances, number of fittings (bends, elbows, joints, length of pipe, regulators, valves, and flexible connectors) to calculate primary and secondary gas releases 2.Does the appliance have flame failure detection? 3.What is the gas demand and pressure? 3. Energy use of equipment? How many? Are they independent? 3. Frequency of formal inspection? Will people be there at other times? Check if proposed ventilation is “more than adequate”, or “adequate”? Check if there are specific requirements for the installation e.g. congested areas where gas can build up? Local zones of non compliance? Will the gas detection activate in time for a leak? What details are required for improving safety, fire fighting?

Fault assessment SR/25 lists 3 types of gas releases ClassificationSecondary - Gas is released not through normal operation, and likely to be infrequent and short duration and due to catastrophic failure. E.g. pipe joins, flanges, hole<0.25mm - Gas is released not through normal operation, and likely to be infrequent and short duration and due to catastrophic failure. E.g. pipe joins, flanges, hole<0.25mm Primary Expected periodically during normal operation. E.g. burners, some regulators Continuous Gas is released as an everyday part of the process – eg gas bottle filling. This cannot be Zone 2 NE Gas is released as an everyday part of the process – eg gas bottle filling. This cannot be Zone 2 NE

SR25 assessment methodology Number of primary releases Count number of primary sources (burners) SR25 gives the expected number of simultaneous releases being: 1 burner = 1 source 2 burners = 2 sources 3 burners = 3 sources. 4-5 burners = 4 sources Flow rate = sum maximum flow from each primary source -Gas consumption from manufacturer’s data sheet -Or calculate from kW rating and calorific value of gas. -Refer to SR/25 A7.1.1 for other primary sources.

SR25 assessment methodology Number of secondary releases – pipes and joiners Count number and type of fittings Secondary gas flow rate = sum of (inspection interval)*(failure frequency per year)*(number of devices) Item Frequency of failures per year (fi) Maximum time between inspections T max (months) Flexible pipes and bellows in adverse conditions (vibration0.012 Pin hole fail of regulator diaphragm Rising stem valve stem Rotating stem valve stem Screwed union/ single ferrule compression joint Screwed fitting - sealed Flange, flexible pipes and bellowed - normal conditions Twin ferrule compression joints

Ventilation rates 1. Check for room mixing especially with mechanical ventilation Air volume for good mixing Q mix >0.15 (A.V e ) 0.5 V e = volume of enclosure (limit <100m 3 ) A = area of grilles (m 2 ) 2. Adequate ventilation Q req = 90.G.p 3. “More than adequate” ventilation Q req = 225.G.p Gas release G = sum of primary and secondary gas flow rates P = gas density “Adequate” ventilation is a minimum and “more than adequate “ may be required for some installations

Ventilation rates CHECK CONGESTED AND CONSTRICTED AREAS AND ZONING AROUND LEAK POINTS -Will you need local exhaust at tight points around the room? -Check where within 1m of a wall or other equipment -Affects mechanical layout with local exhaust points -Refer to SR/25 for requirements. Comparison with NZBC -SR/25 exhaust rates are much higher than NZBC G4 or NZS5601—6.5. G4 compliance may not be adequate if you are following SR/25 in full -In the order of times higher for SR/25 -Opening sizes for wall grills are also much higher than G4

Ventilation rates E.G – 5 Rinnai HD250 condensing boilers in a 47m 3 room 250MJ/hr each (69kW) with atmospheric burners NZBC G4 – 7.2m 3 /hr per kW = 690 l/s=0.69m 3 /s NZS5601 – 0.5 l/s per MJ/hr = 621 l/s IGEM SR/25 – min 1.6m 3 /s for mixing and 1.9 m 3 /s exhaust.. Which is right? NZBC G4 complies with NZBC for ventilation...

SR25 assessment methodology Gas detection reaction time Will the gas detector react in time given the expected simultaneous release rate? T90 time is time for gas detector time to react with a step change in gas concentration to 90% trigger level Information is in manufacturer's data sheet – typically around 30s. Check T90 time from gas detector Gas release rate into room volume to LEL level assuming good mixing.

SR25 assessment methodology Other items Manual shut off valve in an accessible location (not just in gas filled room) – required by NZS5601 Fire Service Ventilation fan control, shutoff, hazard warnings. How do you clear the room of gas? NZS5601 requires an explosion proof (remote motor or listed as suitable Zone 1) fan Ventilation airflow is important -Exhaust at high level – above all pipework with supply at low level -Air flow should be diagonal across the room for good mixing (supply low level one wall, exhaust other side) Fan airflow interlock (similar to smoke exhaust fans) – if fan is not operating, gas is isolated – also required by NZBC Fire alarm shutdown is required by NZS Gas detection is a must - and required by NZBC Location and correct installation is important Will you need more than 1? Compliance schedule requirements Maintenance and inspection methods needs to be clearly detailed Define the frequency of inspection – especially for remote rooms.

References Cox, Lees, Ang – classification of hazardous locations. IChemE IGEM SR25 2 nd edition – Hazardous area classification of natural gas installations. Institute of gas engineers and managers - August 2013 IGEM UP/16 – Design of natural gas installations on industrial and commercial premises with respect to hazardous area classifications and preparation of risk assessment, Institute of gas engineers and managers – 2011 AS NZS : 2009 – explosive atmospheres – classification of areas Area classifications of natural gas installations. - R C Santon and M J Ivings Safety in the Process Industries 2 nd ed – Ralph King 1998 Modelling Ignition Probabilities within the Framework of Quantitative Risk Assessments. Pesce, Paci at al. Chemical Engineering Transactions, vol 26, 2012 OGP risk assessment data directory of system reliabilities - Report No. 434 – A1. International Association of Oil and Gas Producers. March 2010