ID 307 Construction + Materials III: Lighting Prof. Brody Endicott College Fall 2012 Custom Luminaires.

Slides:



Advertisements
Similar presentations
Revit Materials Living in a Material World Elise Moss Adjunct Faculty Laney College.
Advertisements

References: Ballast, D. K. (2002). Interior Construction and Detailing for Designers and Architects. Belmont: Professional Publications, Inc Reznikoff,
Ceilings and Stairs RCPs good place for building systems coordination More three-dimensional variety than plans Coordinate vertical elements like elevators.
Reading Assignment for next week: HCL Chapter 14 ELECTRIC LIGHTING.
Developing and Presenting a Design Plan Just FACS.
Civil Engineering & Architecture 2.3 Residential Design.
Presented by: Norm Delay Manhattan Area Technical College Manhattan, Kansas Presentation materials may be found online at: smokyhill.org/vnews/display.v/art/4c87b3ca37004.
Extreme Makeover –Part II The Nitty Gritty Renovation Project Phases Conceptual Design Schematic Design Design Development Construction Documents Construction.
 For controlling the operation and intensity of lighting instruments;  Computerized lighting systems operate lights based on information input and stored.
Copyright © CADCIM Technologies ( ID 230 CAD 3D Autodesk Revit Building 9 for Architects & Designers Introduction AUTODESK REVIT Welcome.
Elevations.
3 interior planning + design conference room
Sketching Exercise id 475 advanced issue. warm up…
Design Development Drawings 1. Code analysis: examine needed changes 2. Draw accurate existing plans/model 3. Indicate demolition 4. Indicate new wall.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Facilities Management and Design
INTERIOR DESIGN FINAL EXAM DUE
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Chapter 22 Lighting Design Process: Design Phases 1.
Show Off Project Mark Singleton. Building a Little Cabin Illustrated instruction to build a small cabin in Autodesk Revit.
ID 308 Construction + Materials IV: Construction Documents Prof. Brody Endicott College Systems Coordination.
Picking up from last week…. Fire stair layout Fire stair layout Due October 18 th Due October 18 th Assignment #1.
Electronic Workflow for Interior Designers and Architects Andrew Brody.
Chapter 7 Lighting Controls © 2006 Fairchild Publications, Inc.
Objective 7.07: EXECUTE scaled drawings. Beginning on page 159 in Housing Decisions, define these terms.  Architectural drawings  Prints  Plan view.
code calculations, construction drawings
A few different things… ID 206 construction + materials II.
Chapter 9 ID 234 Building Codes Fall 2012 Finish and Furniture Selection.
Section drawings know standard construction finish attachment and dimension custom fabrications 1.
LIGHTING LAYERS DIAGRAMS. individual layers might be… Focal – vertical surfaces and objects Task- specific activities Daylight- may provide any role Decorative.
Control System Design Process Planning Documentation.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Chapter 41 Presentation Drawings and Renderings. Introduction Presentation drawings –Convey basic design concepts from the design team to interested persons.
ID 475 Advanced Issues. This course explores the process of advanced and current integrated design trends in Interior Design as related to whole building.
Custom luminaire design sketch test construct document © 2006 Fairchild Publications, Inc.
Clerical Training Adding/Changing Staff Assignments in Campus Independent School District Highway 10 Elk River, MN
R E S I D E N T I A L I N T E R I O R D E S I G N C H A P T E R 1 INTRODUCTION Larger image files are available where noted with *
The Drawing Process Step 1: Looking Stage LOOK at the object you are drawing THINK about what shapes make up the object.
Project Management Plan Howard Community College Canvas Training Course Instructional Designer Ruddhi Wadadekar Presented to The Dean: Teaching and Learning.
Retail project charette Project is already designed! One class Hand or electronic Submit electonically 1.
Lighting Equipment. Lighting: Equipment and Supplies Lighting Control Equipment Lighting Control Board: controls the operation and intensity of lighting.
Doors Revit® Architecture C H A P T E R OBJECTIVES Learn how to place and control doors. Learn how to Tag doors. Understand Wall Closure. Learn.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
Learning Objectives Understand the concept of floor. Create floors using the Floor tool. Create roofs using the Roof tool. Use the shape editing tools.
Learning Objectives Create a rendered scene. Set natural and artificial lightings. Use different materials and textures. Create and render a walkthrough.
Chicago Public Library Board of Directors Meeting January 13, 2015 Projects in Planning Schedule/Activity Phase 1 – Under construction. Refer to YOUmedia.
Final half of the semester Putting theory into practice 1.
Final team building Presentation
One Point Perspective Rooms
Concept sketches are free hand drawings used throughout a project to explore different ideas quickly and efficiently. They are very quick, simple drawings.
Learning Objectives •Understand the basic concepts and principles of Revit Architecture • Understand different terms used in Revit Architecture.
Net-Link Today & Tomorrow
Creating a Landscape Plan
Learning Objectives • Create a callout view using the Callout tool.
ID 234 Building Codes Fall 2008 Fire Suppression Chapter 5.
Architectural Drafting
New Morehead State Bowling Facility
Architectural Drafting
FUE - Future University in Egypt Faculty of Engineering and Technology Department of Architectural Engineering ARC472 - Execution Design (2) Spring 2017.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Omni Facility Services Quality Inspection Training
INTD 405 Modern Practices in Interior Design PLANS
INTD 405 Modern Practices in Interior Design PLANS
MODULE 2 – Project Introduction
Concept Generation: ID-3D Design’s Initial enclosure concepts are generated based on specifications, requirements and preferences from the client as well.
1 Semester Project Design A Multi Story Office Building
Facilities Modernization Program
Creating a Design Plan Working with Clients.
Sketchbook Page 8 How to draw a tree
Presentation transcript:

ID 307 Construction + Materials III: Lighting Prof. Brody Endicott College Fall 2012 Custom Luminaires

what to design: overall concept finish materials (including how it relates to wall/ceiling/floor/furnishing) structure and construction lamp and base type wiring/switching

what to design: overall concept a sketch is fine finish materials (including how it relates to wall/ceiling/floor/furnishing) elevations, with plenty of notes structure and construction sections and/or plans lamp and base type section and/or plans wiring/switching section or plan

Standard incandescent lamps shapes and their designations

Halogen incandescent lamps shapes and their designations

Fluorescent lamp shapes and data

Metal Halide Lamp shapes

Assignment #2: Final lighting design project Due December 17 th 3:15-5:15 Rendered Plan (include materials, furnishings) Rendered perspectives 8x10) –Conference room –Custom luminaire –Lobby –Your choice… RCP (include tags, soffits, exit signs, sprinklers, HVAC supply/returns, projectors, screens, window shades, dashed in furniture where needed, etc) Switching plan (indicate location of switches graphically or with a schedule if they’re in a closet or control room) Wall 1 ½” = 1’-0” (show wall/ceiling interface) Lighting equipment schedule (indicate all equipment Custom luminaire design (elevations, section, plan)

Job book –Equipment cuts (labeled to match plans; include all luminaires, switches and switch plate covers, and acoustical ceilings) –Tabbed sections for each stage of design –Include all drawings and sketches for the project – even the rejected ones, test renders and the like –Organized by date –Class notes –Reproductions of final board Submit physical and electronic copies of boards and book

Revit cloud rendering Revit 2013, the Cloud Render toolbar is already integrated with the program For 2012, install an updateinstall an update Install the Cloud Render toolbar, which is found on the AutoDesk 360 website, under rendering. Once you render, this is where you come back to… AutoDesk 360 website I strongly recommend that you do a test render locally before using up your freebies, as I don’t know yet how much more will cost. Rumor has it that you can delete old renderings, and get back under the 25 total cap…