The Relationship of Scheduling to Costs. Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler.

Slides:



Advertisements
Similar presentations
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Advertisements

Transit Capacity & Quality of Service Manual, 3rd Edition Fixed Route Quality of Service.
Transit Scheduling Manual
ABC. Question 1 Human capital is defined as: The knowledge, talent, and skills that people possess. A The common knowledge, talent, and skills that all.
1 Reliability-Based Timepoint Schedules for Long Headway Transit Routes Peter G. Furth, Northeastern University with Theo H.J. Muller, Delft University.
Abstract The SEPTA Regional Rail system serves as an important network for the Philadelphia region, moving many commuters during the peak hours on suburb-to-city.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Network Design Unit 4: Service Planning & Network Design.
Raising Money to Grow a Business Lesson 4 Issuing Stock vs. Bonds.
School Calendar Strategies 1. Least complicated (but maybe hardest politically) – take fewer “days off” ▫ Squeeze in days during regular work weeks, maintain.
Organisational policies
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Route Design Unit 4: Service Planning & Network Design.
Silberschatz, Galvin and Gagne  2002 Modified for CSCI 399, Royden, Operating System Concepts Operating Systems Lecture 19 Scheduling IV.
Community Transit Solutions for the Suburbs APTA Annual Meeting September 30, 2013.
1 Introduction to Transportation Systems. 2 PART II: FREIGHT TRANSPORTATION.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Design Speed and Design Traffic Concepts
Modelling Service Quality for Public Transport Contracts: Assessing Users’ Perceptions Gabriela Beirão José Sarsfield Cabral 9th Conference on Competition.
APTS – Fourth Day Miscellaneous Topics. Fleet Management Fixed Route versus Paratransit Operations versus Maintenance.
Business Logistics 420 Public Transportation Lecture 26: Transit Pricing.
TEST YOUR KNOWLEDGE LESSON 4: BACK TO SCHOOL ABC Lesson 4: Back to School.
Short Range Transit Improvement Plan CITY OF HIGHPOINT Sounding Board Meeting Service Recommendations September 9, 2014.
Redlands Mortgages MORTGAGE TYPES. REDLANDS MORTGAGES HOME LOAN TYPES Fixed Rate Variable Rate P&I V’s Interest Only Low Doc Line Of Credit 100% Offset.
March 2005 UMORS 1 UMORS Vander Kooi and Associates, Inc Ultimate Multiple Overhead Recovery System.
Helena Inclusive Transit Planning Grant Round 2 Service Improvement Planning -Recommended Local Transit Service Improvement October 21, 2014 Presented.
1 Presentation to TAC June 17, 2009 Overview of Rapid Bus Measures and Effectiveness And Case Studies.
Airport Shuttle Agreements Presented by: John McCarthy GO Airport Express.
11/26/ J/ESD.204J1 Transit Crew Scheduling Outline Crew Scheduling Work Rules and Policies Model Formulation Matching Problem Approximation approach.
Transportation leadership you can trust. presented to TRB Planning Applications Conference presented by Vamsee Modugula Cambridge Systematics, Inc. May.
Business Logistics 420 Public Transportation Lecture 20: Transit System Design.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Service Planning & Standards Unit 4: Service Planning & Network Design.
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
PPA 419 – Aging Services Administration Lecture 10c – Public Transportation and Aging.
UPDATING TRANSIT Lake County, Illinois Lake Co. is changing fast Learn how we modified the transit network to meet changing demand Seth Morgan, Senior.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
TRB 88th Annual Meeting, Washington DC January, 2009 Huan Li and Robert L. Bertini Transportation Research Board 88th Annual Meeting Washington, DC January.
Prepared by: DECEMBER 2008 Metro Transit Light- Rail and Bus Rider Survey FINDINGS AND RECOMMENDATIONS PERISCOPE.
TOTAL COST OF OWNERSHIP
Business Logistics 420 Public Transportation Lecture 23: Transit System Performance Evaluation.
Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
MATH 10 – UNIT 4. FM. 3 Students are expected to: Describe, using examples, various methods of earning income. Identify and list jobs that commonly use.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Vehicle & Crew Scheduling Unit 5: Staff & Fleet Scheduling.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Timetabling Components Unit 5: Staff & Fleet Scheduling.
Chapter 15: Our Economy and You Social Science. Income Managing your money takes several steps, the first of which involves what you make There are several.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
10-1 Decentralization: Responsibility Accounting, Performance Evaluation, and Transfer Pricing 10.
Transit Quality of Service Applications Comprehensive Planning November 2, 2007 Florida Department of Transportation Public Transit Office.
Route and Network Planning
Comprehensive Operations Analysis LYNX 2013 Comprehensive Operational Analysis John Lewis, CEO.
IPART’s review of CityRail’s regulatory framework – stakeholder roundtable 31 July 2008.
Transport.tamu.edu Fall 2016 Proposed Route Changes.
TDTIMS Overview What is TDTIMS? & Why Do We Do It?
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Frequency Determination Unit 5: Staff & Fleet Scheduling.
Ensieea Rizwani An energy-efficient management mechanism for large-scale server clusters By: Zhenghua Xue, Dong, Ma, Fan, Mei 1.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Lecture 4 Page 1 CS 111 Summer 2013 Scheduling CS 111 Operating Systems Peter Reiher.
Transportation Fee FY2016 January 16, Services Provided by Transportation Stinger Buses - Three routes with 10 buses operating weekdays and two.
Life Insurance. Objectives Students will define keys terms related to life insurance Students will identify key features of various types of life insurance.
AGENDA PROJECT OVERVIEW PAST AND PRESENT YOUR VALUES FOR TRANSIT NETWORK CONCEPTS.
MODULE 4, LESSON 2 Fundamentals of Transit Service and Networks.
Comprehensive Route Network Analysis
Disabled Adult Transit Service:
Project Feasibility Analysis
Service Routes and Community Transit Hubs: Right Sizing Transit
Staten Island Bus Study Public Workshop
THE LABOR SUPPLY / DEMAND ANALYSES THE “HATRAK” APPROACH TO USING
GROTON-DUNSTABLE REGIONAL SCHOOL DISTRICT
Sample ‘Scheduling Process’
1. Where should buses run and with what frequency?
Presentation transcript:

The Relationship of Scheduling to Costs

Introduction Robert Madison – Manager, Scheduling & Analysis Ken Halliday – Senior Scheduler

Scheduling Process Transit Scheduling Definition (verb) - the act of designing a relationship between time and space – creating a plan for when a vehicle will pass by a specific geographic location. Because of the geographic aspect, efficient scheduling is not a “stand alone” activity, it has to be related to the route design.

Scheduling process (overview) 1.Understand the challenges and opportunities 2.Understand the constraints 3.Collect information 4.Collect basic running time data 5.Refine running times 6.Determine cycle time

Scheduling process (overview) 7.Build trip schedule 8.Block trips 9.Runcut blocks 10.Finalization and wrap-up

Scheduling process (approaches) Network/route design and scheduling go hand-in-hand Various approaches ‣ Hub and spoke » Often with timed transfers ‣ Loops » High coverage vs. inconvenient routings/timings ‣ Grid » Often offers best headway opportunities

Hub and Spoke network Schedules are designed so several buses arrive at one location at specific times to facilitate transfers. Also known as timed-transfer, or pulse network

Hub and Spoke network (pros) Maximize transfer opportunities ‣ Often with timed transfers/scheduled meets Most passengers can get to main hub on one-seat ride

Hub and Spoke network (cons) Very little flexibility with route length ‣ Bus has to be able to get back to hub to meet with other buses Delays cause significant disruption ‣ One late bus can make every bus late Not convenient for travel between outer ends of adjacent spokes

Loop networks (pros) Maximize coverage area with fewer vehicles Really, seriously, not much else.

Loop networks (cons) Indirect routings One-way loops offer no easy return trip options Hard for passengers to understand Not always a clear start and end point ‣ Interlining can be difficult if the bus is expected to continue on its loop routing

Loop networks

Grid Buses are scheduled to run frequently so wait times for transfers are minimized.

Grid networks (pros) Allows for best headway / frequent transit Convenient for transferring anywhere in system Straightforward, logical Allows for less service duplication

Grid networks (cons) Not easy to do timed transfers ‣ Each route can have different headways ‣ Too many transfer possibilities to try and make individual ones work Local street network must work for grids

Short turns & branches Useful where demand on one portion of a route is significantly higher than demand on another portion Multiple outlying areas need service to a single dense corridor

Short turns & branches Short turns should actually save money in order to be logical Branches necessarily must have a headway that is a multiple of the trunk headway.

Route Design/Structure Efficient, lower cost systems ideally run buses through dense population areas Take passengers to/from popular destinations ‣ Employment centres ‣ Shopping and entertainment centres ‣ Schools

Service Standards and Policies Define your transit system’s “reason for being”.

Service Standards and Policies Policies and standards used in service development Balance between cost efficiency and provision of adequate service to the public

Cycle time The amount of time it takes for a bus operate a round-trip (i.e. both directions, or one loop), including layover/recovery. BA

Cycle time Good route design takes into account cycle time For “clock-face” headways (frequencies), design routes that have a cycle time that can be divided by your headway (15/30/60 minutes)

Cycle time

Cycle time / interlining How do you maintain efficiency if you can’t design routes with even cycle times? ‣ That’s where you employ interlining Example ‣ Route 100: 37 minute cycle ‣ Route 200: 40 minute cycle ‣ Route 300: 38 minute cycle ‣ 30 minute frequency

Interlining Example:

Interlining Same trips, interlined

Interlining Without interlining ‣ 6 buses ‣ Long layovers With interlining ‣ 115-minute total cycle ‣ 4 buses ‣ Less excess recovery time

Interlining No interliningWith interlining In-service time42h55 Pull in/out trips9h006h00 Layover29h316h45 Buses used64 Total time81h2655h40

Interlining (pros vs. cons) Pros ‣ More efficient use of vehicle/driver time ‣ Reduce excess recovery ‣ Can offer additional direct service Cons ‣ Delays on one route may impact others ‣ Only works if vehicle types compatible on all trips/routes

Small schedule tweaks 5 Min

Small schedule tweaks

Peak vs. Off-peak service Typical weekday “vehicles in service” graph

Peak vs. Off-peak service Typically, “base” service (midday service) cheapest to add Peak service typically most expensive ‣ Assuming service span is fixed. Adding new service day or extending service day can have lots of overhead costs. “Shoulder” peak usually more expensive than base ‣ Just before AM peak ‣ Just after PM peak

Runcutting Often overlooked in overall system design Can be a key driver of efficiency, particularly for larger systems Impacted by collective agreement work rules ‣ Or even generic work rules if no CA

Overtime vs. adding drivers? Consider cost of having extra drivers vs. cost from overtime Often, fixed costs for employees (benefits, vacation, training, etc.) exceed overtime Must balance with driver quality of life, fatigue from longer hours, etc.

OT vs. adding drivers example Total of 240 hours per weekday Driver pay = $25 / hour Overtime (1.5x pay) after 8 hours 250 weekdays per year Each run costs $30,000/year in fixed costs ‣ Vacation benefits for driver ‣ Health benefits for driver ‣ Training and other administrative costs ‣ Extra board

OT vs. adding drivers example # of daily shifts Average shift length8 hours8.28 hours8.57 hours Straight time pay per run/day$200$206.90$ Overtime premium$0$3.45$7.14 Total daily pay per run$200.00$210.35$ Annual pay total$1,500,000$1,525,000$1,550,000 Fixed run cost (total)$900,000$870,000$840,000 Total annual cost$2,400,000$2,395,000$2,390,000 Paying ½ hour overtime to fewer drivers saves $10,000/year

Drawbacks of high overtime Increased driver stress may lead to more sick time Longer hours, particularly at night, can increase fatigue (i.e. higher accident risk) Not all drivers want to work longer hours Some contracts may specify limits on work time

Spread premium and limitations Spread: The time from the earliest report to the latest sign-off for a driver’s work day ‣ Piece 1: » Report 6:00 » Pull out 6:15 » Pull in 9:30 » Sign off: 9:40 ‣ Piece 2: » Report 14:00 » Pull out 14:15 » Pull in 17:45 » Sign off: 17:55 ‣ Spread: 6:00 – 17:55, 11h55

Spread premium and limitations Most transit collective agreements have spread premium ‣ E.g. 10% bonus pay for spread beyond 10 hours Most also have a maximum spread time ‣ Generally 12 or 13 hours, depending on run type

Spread premium and limitations Spread limitations can cause difficulty for runcutting in certain cases ‣ Service operates far from downtown (has to start early/finish late) ‣ Service levels drop off later in PM rush/early evening ‣ Limited opportunities to mix with other services Because of spread premium, can make adding service more expensive at certain times of day

Spread premium and limitations Filling in midday is often cheaper than adding to the outer edge of the peaks More $ Cheaper

Vehicle blocking and runcutting Vehicle blocking can drive runcutting costs ‣ Short blocks may have to pay guarantee ‣ Blocking can affect efficiency in scheduling straights and splits Most efficient vehicle schedule isn’t necessarily most efficient crew schedule

Vehicle blocking and runcutting Scenario: ‣ Route operates 5:00-21:00 ‣ 45-minute cycle ‣ 15-minute headway (3 buses) 7:00-9:15, 15:15-18:00 ‣ 45-minute headway (1 bus) all other times

Vehicle blocking and runcutting Blocking option 1: Total 26h15 vehicle time per day

Vehicle blocking and runcutting Blocking option 2: Total 27h15 vehicle time per day

Vehicle blocking and runcutting Blocking option 1:

Vehicle blocking and runcutting Blocking option 2:

Vehicle blocking and runcutting Option 1Option 2 Vehicle time26h1527h15 Straight runs12 Split runs12 Trippers30 Paid time34h5330h15

Pitfalls to avoid “We can’t afford to schedule accurate running times” ‣ You are paying for it one way or the other ‣ Schedule accurate run times to better control overtime costs/service reliability ‣ Increase headway if cost increase can’t be accommodated in budget

Pitfalls to avoid Time-consuming diversions to serve few passengers ‣ Mass transit should serve the masses ‣ Increase in running time will increase costs without a commensurate benefit to ridership ‣ Passengers on board inconvenienced by longer trip

Pitfalls to avoid Trying to guarantee everyone an 8 am arrival ‣ If every route has to have a bus at the same time, you need a separate bus for every route » Particularly expensive for smaller systems ‣ Reduces ability to gain efficiency through interlining ‣ If possible, try to work with schools, major employers to stagger start/end times

Pitfalls to avoid Building a bus garage in the middle of nowhere because the land is cheap 15 Km

Tools to help improve schedules Automated data collection technology to help calibrate service levels, cycle times ‣ AVL, APC systems generate large amounts of data for planners and schedulers to use ‣ BC Transit currently working on a program to improve our APC technology ‣ Smart Bus program to consider AVL options

Tools to help improve schedules HASTUS-ATP ‣ Run-time analysis tool offered by GIRO » On wish list for near-term purchase ‣ Uses data from AVL/APC software ‣ Calibrates run times and cycle times based on user-specified criteria for on-time performance

Tools to help improve schedules MinBus ‣ Vehicle blocking optimizer ‣ Finds efficiency in vehicle blocking, reducing peak vehicle requirements based on parameters set by scheduler ‣ Best for larger systems (multiple garages, multiple vehicle types)

Tools to help improve schedules CrewOpt ‣ Crew schedule optimizer ‣ Finds efficiency in crew scheduling, reducing overall schedule cost based on parameters set by scheduler ‣ Uses rules based on collective agreement, plus other preferences

The End Thanks for listening!