Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.

Slides:



Advertisements
Similar presentations
Pay for Performance Regulation Donald Tretheway Senior Market Design and Policy Specialist January 11, 2012.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
Load Resource Inputs to the Multi-Interval Real-Time Market ERCOT is requesting input from LRs and QSEs to enable running meaningful MIRTM simulations.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
ERS Update for DSWG June 1, Agenda June – September 2012 Procurement XML Project Update Clearing Price discussion NPRR 451 Q & A.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Demand Response Products. Discussion Points 1.Setting the scene….. 2.Virtual Power Station 3.Reserves deployment order 4.Demand Response Products.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Updated Cost/Benefit Analysis for PRR Part A/S Bidding Proposed Methodology.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Nodal Settlement Delta Calculations and Statements – 7/11/06 Workshop  Objective: Describe design concepts of nodal settlement delta calculations and.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
2016 Long-Term Load Forecast
NPRR 571 ERS Weather Sensitive Loads Requirements Carl Raish, ERCOT QSE Managers Working Group November 5, 2013.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
Unit-Specific Bid Limits based on Modified Generic Cost.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
ORDC Options Analysis SAWG Market Analysis 12/16/2015.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
Graham Generation and the Market – The Facts October 8, 2008.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Co-ordination of Power Balance Penalty Curve, VOLL, SWOC for AS Demand Curves.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
MIRTM Temporal Constraints Discussion Loads in SCEDv2 Subgroup Jan. 8, 2016.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
Operations Update ERCOT Board Meeting March 18, 2003.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
Operations Update Kent Saathoff TAC Meeting March 6, 2003.
DAM Collateral Requirements Carrie Bivens Manager, Day-Ahead Market Dec 16,
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Report to WMS September 19, 2007.
Update: 30-Minute Emergency Response Service (ERS) Pilot Project Mark Patterson, ERCOT October 7, 2013.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Future Ancillary Services Cost Benefit Analysis - Additional Runs and Analysis Julie Jin March 10, PRS.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
RPRS March 23, 2006 Presented by ERCOT Art Deller Bill Kettlewell
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Query Functions.
Presentation transcript:

Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006

2 What We Want to Accomplish Today  Review methodology used to calculate benefits of PRR 567  Review input data and assumptions  Review results  Review revised CBA

3 Input data requirements Typical Unit Data Start Cost - ($) Unit Max (MW) Unit Min (MW) AGC Max (MW) AGC Min (MW) Avg HR at Unit Max (MMBtu/MWh) Avg HR at Unit Min (MMBtu/MWh) Avg HR at AGC Max (MMBtu/MWh) Avg HR at AGC Min (MMBtu/MWh) Min Run (Hours) Min Down (Hours) AGC Range Ramp Rate (MW/min) Market Data (Actual)  Hourly energy prices for next day Used the previous 10 day average of North zone MCPE as a proxy  Daily gas prices Used Gas Daily prices for HSC  ERCOT historic deployment data Used previous 10 days for URS Used same month for RRS  ERCOT day-ahead A/S market data for following: (hourly for URS and RRS) MCPC Procured MW Aggregated bid stack Note: all data except gas prices were obtained from the ERCOT Public Market Information web page.

4 Methodology for Calculating Market Cost Savings Using the input data calculate the following for a typical conventional steam unit and CCCT unit for both URS and RRS:  Offer bids ($/MW)  Minimum running cost ($)  Start Costs ($)  Offer capacity (MW) Offers from these typical units are inserted into the RRS and URS supply stack and re-clear the RRS and URS markets for all hours Calculate daily savings based on the lower MCPC resulting from the new bid stack Determine if any “make whole payments” are required to cover start up and minimum running costs Subtract “make whole payments” from daily savings to determine market savings for the day Repeat for each day from 11/01/2004 through 10/31/2005 Take the maximum daily saving between URS and RRS for each type of unit and sum the market savings for the 12 months.

5 Assumed Unit Parameters Used in Model Large SteamCCCTSmall Drum Start Cost ($) *Max*Gas *Gas2160+9*Max*Gas Unit Max (MW) Unit Min (MW) AGC Max (MW) AGC Min (MW) Avg HR at Unit Max (MMBtu/MWh) Avg HR at Unit Min (MMBtu/MWh) Avg HR at AGC Max (MMBtu/MWh) Avg HR at AGC Min (MMBtu/MWh) Min Run (Hours)5103 Min Down (Hours)442 AGC Range Ramp Rate (MW/min)301014

6 Market Savings Model Results Steam

7 Market Savings by Day # Days > % Days > 0 60% Max Savings $2,618,889 Min Savings > 0 $427

8 Analysis of Resource Plan Availability of Gas Fired Steam Units Number of days in the month unit available but not on-line

9 Analysis of Resource Plan Availability of CCCT Units Number of days in the month unit available but not on-line

10 Revised PRR 567 CBA