Thank you to our funder and sponsors.. © Product Stewardship Institute, Inc. November 2008 PSI National Dialogue on Fluorescent Lighting National Dialogue.

Slides:



Advertisements
Similar presentations
June 4, 2003 Sustainable Rangelands Roundtable. June 4, 2003 A Strategic Course for the Future Sustainable Rangelands Roundtable June 4, 2003.
Advertisements

Overview of the Draft Regional Master Plan Presented to the Solid Waste Management Coordinating Board October 26, 2011.
Waste Prevention Whats Working Whats Challenging.
CFL Recycling. Lamps and Mercury CFLs (Compact Fluorescent Light Bulbs) - Approximately 290 million sold in Available for recycling 7-10 years.
Margaret Shield, PhD, Policy Liaison Local Hazardous Waste Management Program in King County WA’s Mercury Lamp Stewardship Law: spotlight on product stewardship.
Transitioning to Full Producer Responsibility for Household Hazardous Waste NAHMMA NW Chapter Conference 6/25/2014.
California Integrated Waste Management Board Contractor’s Report Framework for Evaluating End-of-Life Product Management Systems in California Presented.
Non-Refillable Gas Cylinder Meeting Sarasota County, FL FL Department of Environmental Protection The Product Stewardship Institute June 18, 2003.
The Association of Electrical and Medical Imaging Equipment Manufacturers 2014 Northwest Hazardous Materials Conference WASHINGTON H.B. 2246: MANUFACTURERS’
Thermostat Product Stewardship Initiative October 26-27, 2004 Chicago, IL.
November 1, 2012 HB 592 REVIEW Revisiting Ohio’s Comprehensive Solid Waste Law Ohio EPA-SWMD Workgroup.
Paint Product Stewardship Initiative Sacramento, CA April 15-16, 2004.
Local Hazardous Waste Management Program in King County Take it Back Network for Fluorescent Lamps Lauren Cole PSI Lamp Dialogue July 15-16, 2008.
PSI National Dialogue on Fluorescent Lighting. © Product Stewardship Institute, Inc. Overall Dialogue Goal: Fluorescent Lighting Promote use of energy.
IS&T Project Management: How to Engage the Customer September 27, 2005.
1 Bringing Curbside Recycling to Delaware A Proposal by: The Recycling Public Advisory Council (RPAC) The Delaware Solid Waste Authority (DSWA) The Department.
PaintCare Paint Stewardship Program Alison Keane, VP, Government Affairs, ACA General Counsel, PaintCare.
Great Lakes Binational Toxic Strategy Mercury Workgroup Meeting National Vehicle Mercury Switch Collection Program Ross Good – ELVS Board of Directors.
PSI Fluorescent Lighting National Dialogue Meeting © Product Stewardship Institute, Inc. April 2008 Fluorescent Lighting Product Stewardship Initiative.
National Summit on Preventing Pharmaceutical Waste October 19, 2010 University of the Sciences Philadelphia, Pennsylvania 1 October 19, 2010Prepared by.
Thank You to Our Project Sponsors! April 11, PSI Mattress Stewardship Initiative.
Organics Policy Roadmap  Sub-directive 6.1: 50% reduction of organics in waste stream by 2020  Need additional capacity to process 15 million tons per.
The Three Paradigms of Household Hazardous Waste Management Jim Quinn NAHMMA NW Chapter Conference June 2015.
Meeting funded by: Thank you to our sponsors!. PSI Fluorescent Lighting National Dialogue Meeting © Product Stewardship Institute, Inc. July 2008 Fluorescent.
Evaluation in the GEF and Training Module on Terminal Evaluations
Thank you to our funder and sponsors.. © Product Stewardship Institute, Inc. November 2008 PSI National Dialogue on Fluorescent Lighting National Dialogue.
Illinois Mercury Thermostat Collection Act.  4/30/10 - Passed out of both houses  Next step – Gets sent to Governor  No opposition.
PSI Forum/NW NAHMMA Conference Tuesday, June 2, 2009 Product Stewardship Framework Legislation Sego Jackson Snohomish County Solid Waste Division, Principal.
PSI Sustaining Partners April 11, As You Sow Giles W. and Elise G. Mead Foundation Hotz Environmental.
Paint Product Stewardship Initiative Washington, D.C. June 29-30, 2004.
The Measurement and Evaluation of the PPSI Oregon Pilot Program Paint Product Stewardship Initiative Portland, Oregon December 10, 2009 Matt Keene Office.
A Comprehensive Product Stewardship Approach Options for Rhode Island April 15, 2010 Scott Cassel, Executive Director/Founder Product Stewardship Institute,
The UK WEEE Regulations What do I need to do? The WEEE Regulations What do I need to do? Outline Objectives of the WEEE Regulations What is WEEE An overview.
“e-cycle St. Louis – Building Regional Support” AIChE Virtual Meeting July 6, 2006.
Minnesota Paint Demonstration Project Stakeholder Work Plan Considerations Mission: Design, implement and evaluate an industry led, fully funded statewide.
PSI Fluorescent Lighting National Dialogue Meeting © Product Stewardship Institute, Inc. July 2008 Fluorescent Lighting Product Stewardship Initiative.
© Product Stewardship Institute, Inc. October 8, 2009 Meeting sponsored by:
Paint Product Stewardship Initiative Chicago, IL September 20-21, 2004.
Phone Book Product Stewardship Initiative October 18, 2007 Seattle WA.
© Product Stewardship Institute, Inc. May 2008 PSI National Dialogue on Medical Sharps Boston, MA May 21-22, 2008.
U.S. work on surplus mercury Presentation by Lynn Vendinello National Program Chemicals Division, U.S. EPA April, 2009.
September 26-27, Paint Product Stewardship Initiative Meeting #5 Portland Oregon.
Paint Product Stewardship Initiative Update – May 2007 PSI National Product Stewardship Forum California Integrated Waste Management Board – Glenn Gallagher.
Platinum Thank you to our sponsors! Gold National Association of Clean Water AgenciesWaste Treatment Division, King County, WA San Francisco, CA – Department.
The Future of HHW: How Collection, Education and Product Stewardship Can Work Together Jim Quinn Metro Solid Waste and Recycling Department Portland, Oregon.
California Integrated Waste Management Board Contractor Report Framework for Evaluating End-of-Life Product Management Systems in California Presented.
Implementation of Minnesota’s E-waste Law RAM/SWANA 2007 October 22, 2007 Garth T. Hickle Minnesota Pollution Control Agency.
Universal Waste Action Plan February 8, 2006 February 8, 2006.
Tire Stewardship Initiative July 28, 2004 Sacramento, CA.
Phone Book Product Stewardship Initiative June 28, 2007 Raleigh-Durham, NC.
5 th ITU Green Standards Week Nassau, The Bahamas December 2015 Standards, Guidelines and Best Practices Applicable to the Environmentally Sound.
Thermostat Product Stewardship Initiative July 20-21, 2004 Portland, OR.
May 3-4, 2006 PPSI Meeting - Sarasota FL1 Paint Product Stewardship Initiative Dialogue Meeting Sarasota, FL May 3-4, 2006.
1 CIWMB E-Waste Update CIWMB Working Group December 2001.
PPSI Oregon Pilot Program Update Call 12/2/09 Oregon’s Paint Product Stewardship Law : 1 st in the Nation Abby Boudouris HHW Coordinator Oregon DEQ Alison.
Thermostat Product Stewardship Initiative October 26-27, 2004 Chicago, IL.
1 Paint Product Stewardship Initiative Update PSI Forum, June, 2008 Shirley Willd-Wagner California Integrated Waste Management Board.
© Product Stewardship Institute, Inc. May 2008 PSI National Dialogue on Medical Sharps Slides for Discussion of Issues : Day 1 (Key Issues # 1, 2, 4)
Update On Progress Of Developing A Nationally Coordinated Leftover Paint Management System California Integrated Waste Management Board - July 2007.
Bill Worrell, P.E. Manager San Luis Obispo County Integrated Waste Management Authority San Luis Obispo, California.
1 after legislation: evaluation for continued improvement in EPR programs 2015 NAHMMA Annual Conference September 16, 2015.
In Pursuit of EPR for All HHW Jim Quinn NAHMMA National Conference September 2015.
2/10/05 California Integrated Waste Management Board1 Consideration Of A Report to the Legislature: Plastic Trash Bag Program And A Comprehensive Approach.
Paint Recycling in Québec: The Financing System
Networking Call Product Stewardship Institute, Inc. October 14, 2009
May 3-4, 2006 PPSI Meeting - Sarasota FL
Product Stewardship Institute Advisory Council Meeting The Lenox Hotel – Boston, MA September 14, 2012.
CALSAVERS: A CROSS-GENERATIONAL APPROACH TO ADDRESSING POVERTY THROUGH
PSI National Dialogue on Medical Sharps
Presentation transcript:

Thank you to our funder and sponsors.

© Product Stewardship Institute, Inc. November 2008 PSI National Dialogue on Fluorescent Lighting National Dialogue Meeting #3 November 7, 2008 (Day 2) 2

© Product Stewardship Institute, Inc. November 2008 Summary of Day 1, Objectives for Day 2 (9:00 am PST) 3

© Product Stewardship Institute, Inc. November 2008 Summary – Enforcing Existing Bans Press Release – Comments back in one week -> Finalize – Send to BOMA, retailer’s associations, etc. in 2 weeks – Prepare target audiences for communication to their members in mid-January Get authority to share artwork on disposal bans (e.g., King County, VT DEC, etc.) 4

© Product Stewardship Institute, Inc. November 2008 Summary – Expanding Disposal Bans Model disposal ban language – Revise after meeting and distribute for review – Use just “recycle,” removing hazardous waste disposal option – Recycle so that mercury gets recovered and retired when options become available – Draft optional component referring to final disposition of mercury – Draft optional component on drum top crushers – Draft component specifying penalties & how they are used 5

© Product Stewardship Institute, Inc. November 2008 Summary – Expanding Disposal Bans Develop MOU to endorse model disposal ban and promote through ECOS, ASTSWMO, etc. Share model disposal ban with Quicksilver Caucus at leadership meeting in DC on December 10 (via Becky, Maria) 6

© Product Stewardship Institute, Inc. November 2008 Summary Criteria for Model Program Criteria generally on target, but add: – Specified high performance goals – Define consumer to include households and small generators – No visible fee at point of sale – No end of life recycling fee 7

© Product Stewardship Institute, Inc. November 2008 Summary Elements of Model Program Continue work on model state program/legislation Procurement – Lifecycle perspective – Recycling service separate from procurement – Limits on mercury content (like CA law) – Develop pros/cons on design drivers 8

© Product Stewardship Institute, Inc. November 2008 Summary Elements of Model Program Bans: modify state disposal ban model for local governments Activate bans only once infrastructure is developed Collection incentive for small to medium retailers 9

© Product Stewardship Institute, Inc. November 2008 Summary – Financing Overview of 5 financing options – focused on utility funding/cap and trade, and cost internalization Agreement on – Third party organization – Some role for manufacturers – Voluntary retail collection – Minimize increased cost of product – No end of life fee – Need for common performance goals methodology and program “robustness” measures 10

© Product Stewardship Institute, Inc. November 2008 Summary – Financing Different perspectives on: – Could an internalized cost be spread over product lines – whether this is inconsistent with the company business model, or whether the model could accommodate this cost increase – The impact of a product price increase on consumer behavior – Ease and interest in obtaining Cap and Trade funds for lamp recycling – Appropriateness and effectiveness of utility funding even in the short term – Likeliness of future retailer acceptance to cover cost of collections – Effectiveness of voluntary programs 11

© Product Stewardship Institute, Inc. November 2008 Summary – Performance Goals Agreement to jointly develop common methodology for measuring performance of lamp recycling efforts Emphasize working through data challenges and assumptions to establish a recycling rate Also develop “robustness” metrics and goals, including convenience and awareness Important to establish a baseline for comparative purposes, even if it is not “perfect” 12

© Product Stewardship Institute, Inc. November 2008 Objectives for Day 2 Lamp breakage impacts Voluntary retail collection Revisit model program and financing Revisit workgroup composition & focus Consider timing, stakeholders for Meeting #4 13

© Product Stewardship Institute, Inc. November 2008 Fluorescent Lamp Breakage (9:15 am PST) 14

© Product Stewardship Institute, Inc. November 2008 Next Steps? Are there concerns about breakage that this group wants to address? – Usage – Collection sites – Transport (shipping via private carrier, etc.) – Solid waste stream? What can we do? – Develop best management practices for shipping from collection locations? – Other next steps? 15

Thank you to our funder and sponsors.

© Product Stewardship Institute, Inc. November 2008 Encouraging Voluntary Retail Collection (10:45 am PST) 17

© Product Stewardship Institute, Inc. November 2008 Strategies to Encourage Voluntary Retail Collection Infrastructure Workgroup focused on promoting voluntary collection at retail locations 2 documents developed to consider today – Recommendations for Retail Collection: tips for successful implementation – How-to Fact Sheet: designing and starting program Review documents for general concept, tone – benefits and overcoming obstacles Develop strategies to use these and other tools to encourage retail collection of lamps 18

© Product Stewardship Institute, Inc. November 2008 Recommendations/best practices Infrastructure Workgroup developed survey – Better understand the challenges to retail collection and how these are being overcome – 17 retailers in different parts of the country – Big box, grocery, drugstore, hardware, lighting – Asked about program structure, logistics & obstacles Survey results compiled and discussed by workgroup, revisions made Draft document to review today – Emphasis is on in-store operational issues (as compared to program design) 19

© Product Stewardship Institute, Inc. November 2008 “How-to” Document Based on PSI pilot project in Region 8 states – Working with Ace Hardware and Women’s Voices for the Earth – Funded by U.S. EPA Region 8 – 25+ stores collecting with shipping-from-retail system in Utah, Montana, South Dakota – Contributions from utilities, local electrical co-ops, and State of Montana – May - December 2008 Overview of steps and considerations – Intended for those interested in setting up collection, including basic program design 20

© Product Stewardship Institute, Inc. November 2008 Next steps? What do we do next to encourage retail collection? Are there other infrastructure elements that need to be addressed? 21

© Product Stewardship Institute, Inc. November 2008

© Product Stewardship Institute, Inc. November 2008 Recap – Work Ahead Disposal bans press release – outreach to target audiences Revise model disposal ban language and develop MOU with dialogue group Continue work on model state program/ legislation and focus on procurement, etc. Develop common methodology for measuring performance of lamp recycling efforts 23

© Product Stewardship Institute, Inc. November 2008 Recap – Work Ahead Develop best management practices for shipping from collection locations? Promote voluntary collection at retail locations using two documents Financing – anything more that would be useful? 24

© Product Stewardship Institute, Inc. November 2008 Meeting #4 25 Tentatively scheduled for March 3-4, 2009 o Timing appropriate relative to legislative sesions? Chicago, IL Funding from U.S. EPA Region 5 Agenda items? Missing stakeholders?