NEW FAST WIRE SCANNER 2013-2015 Manufacturing review Emilien Rigutto - 19.06.15 1.

Slides:



Advertisements
Similar presentations
Stainless Steel By: Dawn McCandless.
Advertisements

CALICE - European DHCAL meeting Ciemat Mechanical Workshop and test of the Stainless steel plate machining for the CALICE-HCAL. Enrique Calvo Alamillo.
CHAPTER 1 Introduction to manufacturing Process and Properties of Metal -Vishal Sir.
HANIL FORGING Ko MinJi. ▪ Index About ‘HANIL FORGING’ Product - Axle shaft, Spindle. Etc. Manufacturing Process - Axle shaft.
JPCI CONTROLS Ultimheat
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Theodore Todorov Pixel mechanics november 8th Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
AIDA Infrastructure for very forward calorimeters 13/11/2012 In collaboration with: François-Xavier Nuiry Andrea Catinaccio Konrad Elsener 113/11/2012AIDA.
Shafts for rotating machines. Sorting of rotating el. machines According power –Small < 10 kW –middle-class up to 1 MW –big (not correctly specified)
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Manufacturing Engineering Objectives:  Create product structure charts, BOM’s and routing sheets  Determine appropriate manufacturing process  Evaluate.
MFGE 102 Fundamentals of Product Design and Manufacturing Engineering Production.
Selection Criteria Properties Availability Cost Manufacturability
Status report on “Industrialization studies” at LAL on power couplers for XFEL _____ TILC08 – Tohoku University 3-6 March 2008 Sendai - Japan G. Wormser.
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
MICE Target Mechanical Design l Contents »Status of modelling and drawing »Work being undertaken at RAL on shaft and bearing prototypes »Procedure for.
TURBO FLANGES We specialize in design, CNC milling, metal turning, plasma cutting, and TIG welding all done in house. Please contact us for further information.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
10/28/2015Pierre Moyret1 Production of SQXF Magnet Components: Return on experience P.MOYRET EN-MME-FS.
1.3GHz Input Coupler for ILC
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Introduction to Manufacturing Processes
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
BPM for Spectromety development status A. Lyapin.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.
THE LINAC4 RFQ – Experience with Design, Fabrication and Tuning C. Rossi and the RFQ Project Team GSI Review – 20 November 2013.
Mechanical design considerations for beta=1 cavities OC, 28/July/20111SRF2011 Chicago O. Capatina, S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo,
MQXFB Prototype structure and plans at CERN J.C Perez On behalf on MQXF collaboration team Joint HiLumi-LARP Meeting & 24 th LARP Collaboration Meeting.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
Fabrication of LHC cavities at CERN N. Valverde Alonso, G. Favre,T. Tardy, F. Pillon, R. Claret, S. Mastoura, E. Rigutto,J. Geisser
Pierre Delebecque Cooling – upgrade 2012 May 31 st 1 Inner detector upgrade / IBL Activities on cooling LAPP LAPP team Jacky Ballansat, Patrick.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
Results of short module and qualification strategy
MANUFACTURING TECHNOLOGY A BRIEF OVER VIEW NATIONAL INSTITUTE OF TECHNOLOGY AGARTALA
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
First Wall Panel - Overview
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Brief Status SPS Prototype PSB Prototype Installed in LS1
MICE Target Mechanical Design
LIU Wire Scanner Milestones June 2017
Cryostat procurement, status and plan, QA/QC
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Wideband kickers Mechanical design and Fabrication
Teleconference ACS – FREIA 18th April 2017
Diffuser status October 2017
Beam Wire Scanner for PSB
Parts exchange for HL-LHC AUP Q1&Q3
LIU Wire Scanner Series Costs
Beam Wire Scanners (PS prototype and LIU series)
ME 330 Introduction Revision For the final exam Contact:
Planning Quality control - Manufacturing logbook Photos Conclusions
Ceramic to metal connection.
Crab – RFD prototype: Fabrication Status Update
Manufacturing process 15
Manufacturing process 4
Production Cryo HL-LHC BPMs
Presentation transcript:

NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto

Summary Emilien Rigutto J Drum and internal parts prototype 1 2. J Vacuum tank 3. J Drum and internal parts prototype 2 4. Conclusion

1. J Drum and internal parts, proto 1, SPSBWSRE0011 x1 Subcontracting to POLMANS (BE), CA , 2721 CHF, report , no conformities detected. -SPSBWSRE0010 / 0008 x1+1 Raw material purchase INCONEL : 640 CHF. -SPSBWSRE0021 x1 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0011 x1 Subcontracting to POLMANS (BE), CA , 2721 CHF, report , no conformities detected. -SPSBWSRE0010 / 0008 x1+1 Raw material purchase INCONEL : 640 CHF. -SPSBWSRE0021 x1 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0014 x2 -Roughing the 2 parts -Relieving heat treatment -Final machining, turning of thin paroies (0.3mm) with specific internal mandrel (new request from Dmitry : 0.2mm) -Etching -Electron beam welding -Leak test Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 -Roughing POS 2 / 3 / 6 -Rolling, welding, calibration POS 4 -Heat treatment POS 2 / 3 / 4 / 6 -Finishing POS 6, semi finishing POS 2 -EB welding POS 2 et 6 -Finishing POS 2 -Roughing POS 4 -EB welding POS 2 et 4 -Semi finishing POS 4 -Roughing POS 3 -EB welding POS 3 et 4 -Finishing with «cradles» -Welding of POS 1 / 5 / 6 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 -Roughing POS 2 / 3 / 6 -Rolling, welding, calibration POS 4 -Heat treatment POS 2 / 3 / 4 / 6 -Finishing POS 6, semi finishing POS 2 -EB welding POS 2 et 6 -Finishing POS 2 -Roughing POS 4 -EB welding POS 2 et 4 -Semi finishing POS 4 -Roughing POS 3 -EB welding POS 3 et 4 -Finishing with «cradles» -Welding of POS 1 / 5 / 6 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 -Roughing POS 2 / 3 / 6 -Rolling, welding, calibration POS 4 -Heat treatment POS 2 / 3 / 4 / 6 -Finishing POS 6, semi finishing POS 2 -EB welding POS 2 et 6 -Finishing POS 2 -Roughing POS 4 -EB welding POS 2 et 4 -Semi finishing POS 4 -Roughing POS 3 -EB welding POS 3 et 4 -Finishing with «cradles» -Welding of POS 1 / 5 / 6 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 -Roughing POS 2 / 3 / 6 -Rolling, welding, calibration POS 4 -Heat treatment POS 2 / 3 / 4 / 6 -Finishing POS 6, semi finishing POS 2 -EB welding POS 2 et 6 -Finishing POS 2 -Roughing POS 4 -EB welding POS 2 et 4 -Semi finishing POS 4 -Roughing POS 3 -EB welding POS 3 et 4 -Finishing with «cradles» -Welding of POS 1 / 5 / 6 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 -Roughing POS 2 / 3 / 6 -Rolling, welding, calibration POS 4 -Heat treatment POS 2 / 3 / 4 / 6 -Finishing POS 6, semi finishing POS 2 -EB welding POS 2 et 6 -Finishing POS 2 -Roughing POS 4 -EB welding POS 2 et 4 -Semi finishing POS 4 -Roughing POS 3 -EB welding POS 3 et 4 -Finishing with «cradles» -Welding of POS 1 / 5 / 6 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 -Roughing POS 2 / 3 / 6 -Rolling, welding, calibration POS 4 -Heat treatment POS 2 / 3 / 4 / 6 -Finishing POS 6, semi finishing POS 2 -EB welding POS 2 et 6 -Finishing POS 2 -Roughing POS 4 -EB welding POS 2 et 4 -Semi finishing POS 4 -Roughing POS 3 -EB welding POS 3 et 4 -Finishing with «cradles» -Welding of POS 1 / 5 / 6 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 -Roughing POS 2 / 3 / 6 -Rolling, welding, calibration POS 4 -Heat treatment POS 2 / 3 / 4 / 6 -Finishing POS 6, semi finishing POS 2 -EB welding POS 2 et 6 -Finishing POS 2 -Roughing POS 4 -EB welding POS 2 et 4 -Semi finishing POS 4 -Roughing POS 3 -EB welding POS 3 et 4 -Finishing with «cradles» -Welding of POS 1 / 5 / 6 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 -Roughing POS 2 / 3 / 6 -Rolling, welding, calibration POS 4 -Heat treatment POS 2 / 3 / 4 / 6 -Finishing POS 6, semi finishing POS 2 -EB welding POS 2 et 6 -Finishing POS 2 -Roughing POS 4 -EB welding POS 2 et 4 -Semi finishing POS 4 -Roughing POS 3 -EB welding POS 3 et 4 -Finishing with «cradles» -Welding of POS 1 / 5 / 6 Emilien Rigutto Manufacturing process proto 1 : 39 Steps (turning, milling, forming, heat treatment, EB welding, wire cutting, cleaning, control, leak test…) Metrological report (edms ) : - Default of coaxiality and 0.03 between Ø 32 and 47 H7 Difficulties : -Deformation POS 3 -Concentricity of Ø H7 -Final machining with «cradles»

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 Emilien Rigutto

1. J Drum and internal parts, proto 1, SPSBWSRE0005 x1 Emilien Rigutto

1. J Drum and internal parts, proto 1, Emilien Rigutto Cost analysis: -Stainless steel 316LN 3D forged purchase for POS 2, EDH (with 2 spares) = CHF (2.980 CHF / drum) -Raw material purchase, EDH (with 4 spares for the flange DN400) = CHF (7.780 CHF / drum) -Subcontrating shaft SPSBWSRE0011, CA , CHF -Purchase Inconel, 640 CHF -Mechanical operations (including tooling) : CHF -Welding and forming operations : CHF -Metrology operations : CHF -EB welding operations : CHF -Heat treatment : CHF -Total Job: CHF (cleaning not including) -Total only drum: CHF

2. J Vacuum tank, 2014 Emilien Rigutto Manufacturing of 2 tanks SPSBWSRE0002 -Standard tolerances (be careful coaxiality Ø190H7 : 0.4mm) -Manufacturing process : 45 steps -Spinning POS 8, OLSEN, CA Metrological report edms , OK Cost analysis (pour 1 tank) : -Material purchase : CHF -Mechanical operations : CHF -Forming and welding operations : CHF -EB welding operations : 780 CHF -Subcontracting of spinning : CHF -TOTAL : CHF

3. J Drum and internal parts, proto 2, Emilien Rigutto Different approach for the drum: - subcontracting a maximum mechanical operations for a mass production of 20 to 25 drums -Creating intermediate drawings -Price inquiry -CA Rottger’s (DK) Metrological report edms : OK

3. J Drum and internal parts, proto 2, Emilien Rigutto New manufacturing process, shorter, 24 steps. Costs analysis for the drum PROTO 2: -Material purchase: CHF -Mechanical subcontracting : CHF -Forming and welding operations : CHF -Mechanical operations: CHF -EB welding operations : CHF -Heat treatment : CHF -TOTAL : CHF Costs analysis for the drum PROTO 1: -Material purchase: CHF -Mechanical subcontracting : NO -Forming and welding operations : CHF -Mechanical operations: CHF -EB welding operations : CHF -Heat treatment : CHF -TOTAL : CHF Why differences : -Existing tools -Experience of the prototype 1

4. Conclusion Emilien Rigutto Internal parts : -Internal manufacturing : possible -Subcontracting : already done, for a production of 25 units, we can estimate a discount of 30%. -Vacuum tank : -Internal manufacturing : already done -Subcontracting : possible, be careful to the tolerances and EB welding, we can estimate a discount of 30%. - Drum : -Mechanical roughing with subcontracting is validated. -We recommend finishing in the main worshop because EB welding and critical operations -Adding calibration procedures -Study of a new clamping system for the final milling operation (removal of cradles)