CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 1 Status of Cosmic Reconstruction Offline weekly meeting.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Status of BESIII Distributed Computing BESIII Workshop, Mar 2015 Xianghu Zhao On Behalf of the BESIII Distributed Computing Group.
Workload Management meeting 07/10/2004 Federica Fanzago INFN Padova Grape for analysis M.Corvo, F.Fanzago, N.Smirnov INFN Padova.
The LEGO Train Framework
– Unfortunately, this problems is not yet fully under control – No enough information from monitoring that would allow us to correlate poor performing.
CSC DQA and Commissioning Summary  We are responsible for the online and offline DQA for the CSC system, a US ATLAS responsibility  We are ready for.
Parallel Reconstruction of CLEO III Data Gregory J. Sharp Christopher D. Jones Wilson Synchrotron Laboratory Cornell University.
ALICE Operations short summary and directions in 2012 Grid Deployment Board March 21, 2011.
ALICE Operations short summary LHCC Referees meeting June 12, 2012.
ALICE Operations short summary and directions in 2012 WLCG workshop May 19-20, 2012.
Statistics of CAF usage, Interaction with the GRID Marco MEONI CERN - Offline Week –
Chiara Zampolli in collaboration with C. Cheshkov, A. Dainese ALICE Offline Week Feb 2009C. Zampolli 1.
Production test on EDG-1.4 Goal 1: simulate and reconstuct 5000 Pb-Pb central events 1 job/event Output size: about 1.8 GB/event, so 9 TB Job duration:
ALICE Trigger and Event Selection QA 1Kevin McDermott By: Kevin McDermott August 9, Michigan REU Student Program – Final Presentations.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES P. Saiz (IT-ES) AliEn job agents.
CERN IT Department CH-1211 Genève 23 Switzerland t Internet Services Job Monitoring for the LHC experiments Irina Sidorova (CERN, JINR) on.
STAR Analysis Meeting, BNL, Dec 2004 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software and calibration L3 display 200 GeV February.
Tracking Task Force Predrag Buncic Offline Week, 19 March 2014.
CERN – Alice Offline – Thu, 03 Feb 2005 – Marco MEONI - 1/18 Monitoring of a distributed computing system: the AliEn Grid Alice Offline weekly meeting.
Costin Grigoras ALICE Offline. In the period of steady LHC operation, The Grid usage is constant and high and, as foreseen, is used for massive RAW and.
Offline shifter training tutorial L. Betev February 19, 2009.
Panda Grid Status Kilian Schwarz, GSI on behalf of PANDA GRID Group (slides to a large extend from Radoslaw Karabowicz)
Offline report – 7TeV data taking period (Mar.30 – Apr.6) ALICE SRC April 6, 2010.
DQM status report Y. Foka (GSI) Offline week from pp to PbPb.
Infrastructure for QA and automatic trending F. Bellini, M. Germain ALICE Offline Week, 19 th November 2014.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Working with AliEn Kilian Schwarz ALICE Group Meeting April
5/2/  Online  Offline 5/2/20072  Online  Raw data : within the DAQ monitoring framework  Reconstructed data : with the HLT monitoring framework.
Planning and status of the Full Dress Rehearsal Latchezar Betev ALICE Offline week, Oct.12, 2007.
CERN – Alice Offline – Thu, 27 Mar 2008 – Marco MEONI - 1 Status of RAW data production (III) ALICE-LCG Task Force weekly.
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
PROOF and ALICE Analysis Facilities Arsen Hayrapetyan Yerevan Physics Institute, CERN.
Michele de Gruttola 2008 Report: Online to Offline tool for non event data data transferring using database.
1 Checks on SDD Data Piergiorgio Cerello, Francesco Prino, Melinda Siciliano.
Phase 2 of the Physics Data Challenge ‘04 Latchezar Betev ALICE Offline week Geneva, September 15, 2004.
AliEn central services Costin Grigoras. Hardware overview  27 machines  Mix of SLC4, SLC5, Ubuntu 8.04, 8.10, 9.04  100 cores  20 KVA UPSs  2 * 1Gbps.
Computing for Alice at GSI (Proposal) (Marian Ivanov)
A. Gheata, ALICE offline week March 09 Status of the analysis framework.
AliRoot survey: Analysis P.Hristov 11/06/2013. Are you involved in analysis activities?(85.1% Yes, 14.9% No) 2 Involved since 4.5±2.4 years Dedicated.
1 Offline Week, October 28 th 2009 PWG3-Muon: Analysis Status From ESD to AOD:  inclusion of MC branch in the AOD  standard AOD creation for PDC09 files.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Predrag Buncic CERN ALICE Status Report LHCC Referee Meeting 01/12/2015.
Data processing Offline review Feb 2, Productions, tools and results Three basic types of processing RAW MC Trains/AODs I will go through these.
M. Gheata ALICE offline week, October Current train wagons GroupAOD producersWork on ESD input Work on AOD input PWG PWG31 (vertexing)2 (+
Analysis Trains Costin Grigoras Jan Fiete Grosse-Oetringhaus ALICE Offline Week,
Physics selection: online changes & QA M Floris, JF Grosse-Oetringhaus Weekly offline meeting 30/01/
03/09/2007http://pcalimonitor.cern.ch/1 Monitoring in ALICE Costin Grigoras 03/09/2007 WLCG Meeting, CHEP.
Monitoring for the ALICE O 2 Project 11 February 2016.
D.Spiga, L.Servoli, L.Faina INFN & University of Perugia CRAB WorkFlow : CRAB: CMS Remote Analysis Builder A CMS specific tool written in python and developed.
Alien and GSI Marian Ivanov. Outlook GSI experience Alien experience Proposals for further improvement.
Analysis framework plans A.Gheata Offline week 13 July 2011.
AliRoot survey: Calibration P.Hristov 11/06/2013.
AAF tips and tricks Arsen Hayrapetyan Yerevan Physics Institute, Armenia.
Virtualisation: status and plans Dag Toppe Larsen
ANALYSIS TRAIN ON THE GRID Mihaela Gheata. AOD production train ◦ AOD production will be organized in a ‘train’ of tasks ◦ To maximize efficiency of full.
Offline week meetings CERN – June 25, 2009 CAF user experience Maria Nicassio (INFN Bari)
1 14th June 2012 CPass0/CPass1 status and development.
Availability of ALICE Grid resources in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Analysis trains – Status & experience from operation
DPG Activities DPG Session, ALICE Monthly Mini Week
CPass0/CPass1 on LHC12d/c Updated at 08:45 on 02/08
Massimo Masera INFN sezione di Torino
Offline shifter training tutorial
Analysis Trains - Reloaded
Experience between AMORE/Offline and sub-systems
Simulation use cases for T2 in ALICE
Offline shifter training tutorial
Pablo Saiz CAF and Grid User Forum
Offline framework for conditions data
Presentation transcript:

CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 1 Status of Cosmic Reconstruction Offline weekly meeting

CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 2 Current Situation Production started on March 17th at 7pm (on global partition LHC08a) Phase 1 – Most Wanted List: 120/857 runs, / raw files – Local steering (see later) – Completion expected by next Tuesday Phase 2 – Low Priority List – Will be steered by LPM – Lightweight Production Manager (see later) – Completion expected during the ALICE week Phase 3 – Missing Dec07's global runs (~10k raw files)

CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 3 Phase1: Ongoing Production ~ done jobs Manual intervention is evident No specific Grid problems, only Cluster Monitor stuck on voalice03/06

CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 4 Phase1: Failures Others errors: – Input Box: none – Expired: none – Saving: negligible AliRootGrid

CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 5 Phase1: few details One job for single chunk (it will be per run in Phase2) Output is about 40MB rec.C added to rec.log (experts review) Packages: AliRoot v4-11-Rev-03, ROOT v b Sites: CERN::LCG, CERN::CERN-gLite Reconstruction time per raw file: 5 minutes in avg (no QA)

CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 6 Monalisa DAQ page shows now percentage and number of chunks reconstructed per each run (Costin) Phase1: can be monitored!

CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 7 Need to switch to one master-job per run – Now hard to monitor – Now no automatic re-submission to keep the task queue filled – LPM will be used for this purpose JDL already in place – Split by #alienfirstfilename# – waiting for correct functioning of the #aliensplit_se# directive (used to create the output folder for the reconstructed chunks) According to the current reconstruction time per raw file, we expect an "online production"! Phase2

CERN – Alice Offline – Thu, 20 Mar 2008 – Marco MEONI - 8 Conclusions Everything is working, just be patient for results to be computed