Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced.

Slides:



Advertisements
Similar presentations
IPAC10, Kyoto, Japan, May 23-28, 2010 E-cloud feedback simulations - Vay et al. 1 Simulation of E-Cloud driven instability and its attenuation using a.
Advertisements

M.Gasior, CERN-AB-BIBase-Band Tune (BBQ) Measurement System 1 Base-Band Tune (BBQ) Measurement System Marek Gasior Beam Instrumentation Group, CERN.
1 Warp-POSINST is used to investigate e-cloud effects in the SPS Beam ions Electrons Spurious image charges from irregular meshing controlled via guard.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Introduction to the High Bandwidth Transverse Feedback W. Hofle on behalf of HBTFB Team Proposed New System vs. Existing Feedback System Brief History.
POTENTIAL OF THE WIDEBAND TRANSVERSE DAMPER G. Kotzian on behalf of HBTFB team G. Kotzian, LIU-2013, April 12, 2013.
W. LHC Studies WG Day Review MDs Transverse Damper from Run1 to Run2 reported by W. Hofle for ADT & friends LHC MSWG Special Meeting.
Summary of visit to BNL and LARP workshop High Bandwidth Feedback perspective Preliminary Report by W. Hofle
March 2, 2007ELC Experience with clearing voltages and solenoids at SPS damper pick-ups W. Hofle Acknowledgements PS-OP, SL-OP, SL-BI LHC-VAC, SL-HRF.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni, Hannes Bartosik, Sandra Aumon 27/06/2012 ICE.
Elias Métral, APC meeting, 02/02/2006 1/35 E. Métral, G. Arduini and G. Rumolo u Observations of fast instabilities in the SPS (1988 and 2002/3) and PS.
Mathilde FAVIER Fellow in BE/BI/QP Mathilde FAVIER BE/BI-QPSCHOTTKY STATUS - BI DAY - December 6th
Beam observation and Introduction to Collective Beam Instabilities Observation of collective beam instability Collective modes Wake fields and coupling.
Update of the SPS transverse impedance model Benoit for the impedance team.
PS (electron cloud?!) instability at flat top Mauro Pivi Gianni Iadarola, Giovanni Rumolo, Simone Gilardoni 05/06/2012 LIU-PS meeting, CERN.
Update of the SPS transverse impedance model C. Zannini, G. Rumolo, B. Salvant Acknowledgments: H. Bartosik, O.Berrig, F. Caspers, E. Chapochnikova, G.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Wolfgang Hofle AB/RF LHC MAC - June 15, Abort gap cleaning with damper 1/23 Acknowledgements: T. Kramer (AB/BT), E. Shaposhnikova (AB/RF) Wolfgang.
1 Transverse Mode Coupling Instability in the CERN SPS: Comparing HEADTAIL Simulations with Beam Measurements Benoit Salvant (EPFL / CERN Switzerland)
High Bandwidth damper Input from W.Hölfe Acknowledgement to all collaborators at SLAC, INFN, LBNL and CERNL Presentation of recent MD results (J.Cesaratto):
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
BEPCII Transverse Feedback System Yue Junhui Beam Instrumentation Group IHEP , Beijing.
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Instability rise-time far above the TMCI threshold: Comparison between simple theory, MOSES and HEADTAIL E. Benedetto, E. Metral Acknowledgements: G. Rumolo,
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
Outcome of HBW damper Review of W. Hofle LIU-SPS HBW damper review LIU SPS Coordination,
Elias Métral, SPSU Study Group and Task Force on SPS Upgrade meeting, 25/03/2010 /311 TMCI Intensity Threshold for LHC Bunch(es) in the SPS u Executive.
CERN F. Ruggiero Univ. “La Sapienza”, Rome, 20–24 March 2006 Measurements, ideas, curiosities beam diagnostics and fundamental limitations to the performance.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS Transverse Damper with Crab Cavities G. Kotzian, W. Hofle BE-RF-FB, 11. January 2016 Crab Cavity SPS Tests Day I
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Bunch shortening along SPS bunch trains due to e-cloud G. Rumolo, G. Arduini, F. Roncarolo Show results from the data analysis of 2 coasts during the August.
Experience and Perspectives of Transverse Feedback Systems for Scrubbing Thanks to: SPS OP crew and colleagues from BE-ABP and BE-RF, for their support.
Comparison of stainless steel and enamel clearing electrodes E. Mahner, F. Caspers, T. Kroyer Acknowledgements to G. Arduini, H. Damerau, S. Hancock, B.
Update on TMCI measurements March 5, 2008 G. Arduini, R. Jones, E. Métral, G. Papotti, G. Rumolo, B. Salvant, R Tomas, R. Steinhagen Many thanks to the.
LARP CM12, 9 April 2009M. Furman: PS2 ecloud p. 1 PS2 Electron-Cloud Build-Up Studies: Status LARP CM12, Napa, CA, 9 April 2009 Miguel A. Furman LBNL.
Three examples of application of Sussix 1)Data from simulations  sensitivity 2)Data from measurements  frequency resolution.
Progress on e-cloud effects (PS and SPS) G. Iadarola, H.Bartosik, G. Rumolo, M. Taborelli, C. Yin Vallgren Many thanks to: G. Arduini, T. Argyropoulos,
ADT kickers and amplifiers in tunnel point 4 of LHC, RB44 and RB46 1 W. Hofle LHC Transverse Damper LARP CM20 Napa April 8-10, 2013 LHC Transverse Damper.
Feedback Simulations with Amplifier Saturation, Transient and Realistic Filtering Mauro Pivi, Claudio Rivetta, Kevin Li Webex CERN/SLAC/LBNL 13 September.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Transverse Feedbacks against ECE at SPS and LHC W.Hofle CERN BE-RF-FB on behalf of a multi-lab team CERN – SLAC – LBNL – LNF-INFN W. -
Benchmarking Headtail with e-cloud observations with LHC 25ns beam H. Bartosik, W. Höfle, G. Iadarola, Y. Papaphilippou, G. Rumolo.
Status of the single-bunch feedback system for the SPS/LHC M. Pivi C. Rivetta, J. Cesaratto, J. Fox, O. Turgut, S. Uemuda, W. Hofle, U. Wehrle, K. Li,
W. Hofle / March 5, 2008 Extended LTC meeting 1/22 Acknowledgements: P. Baudrenghien, A. Butterworth, E. Ciapala, B. Goddard, A. Koschik, F. Killing, G.
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Preliminary results of the E-Cloud Instability MDs at the SPS G. Rumolo, in.
PS beam dynamics issues in view of LHC beams upgrade: brief status and prospects G. Rumolo (Beam Dynamics for the PSB/PS Upgrade Working Groups), based.
Progress with High Bandwidth Transverse Feedback CERN - May 2015 Reported by W. Hofle.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Longitudinal impedance of the SPS
Follow up on SPS transverse impedance
Longitudinal beam parameters and stability
Proposals for 2015 impedance-related MD requests for PSB and SPS
Digitizers in CCR for transverse wide-band pick-ups
Benchmarking the SPS transverse impedance model: headtail growth rates
Head-Tail monitor Benoit, with the help of Christian Boccard and Ralph Steinhagen (BE/BI-QP)
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
Limits on damping times
W. Bartmann, M. Benedikt, E. Métral, D. Möhl, G. Rumolo and B. Salvant
News on TMCI in the SPS: Injecting high intensity bunches
DEMONSTRATION OF TRIPLE BUNCH SPLITTING IN THE CERN PS
Observation of Transverse Mode Coupling Instability at the PS and SPS
Collective effects in the SPS and LHC (longitudinal plane)
CERN-SPS horizontal instability
2008 MDs Helmut Burkhardt, Rama Calaga, Wolfgang Hoefle, Riccardo de Maria, Elias Metral, Giulia Papotti, Giovanni Rumolo, Benoit Salvant, Bruno Spataro,
Presentation transcript:

Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20091/23 reported by Wolfgang Hofle CERN BE/RF/FB Transverse feedback to cure electron-cloud induced single bunch vertical instability and TMC-Instability in the SPS Progress Team Wolfram Fisher, Riccardo De Maria (BNL) John Byrd, M. Furman, Stefano De Santis, Jean-Luc Vay (LBL), Joel R. Thompson (Cornell) Gianluigi Arduini, Giovanni Rumolo, Urs Wehrle (CERN) TMCI: Elias Métral, Benoit Salvant (CERN) John D. Fox, Georges Ndabashimiye, Mauro Pivi, Claudio Rivetta (SLAC) Acknowledgement: T. Bohl, G. Kotzian, F. Caspers, T. Linnecar

Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20092/23 Interest expressed in 2007 by J. Byrd (LBL, Berkeley) and J. Fox (SLAC) to collaborate on transverse feedbacks in the frame work of LARP now receiving increased support from LARP Joint MDs in 2008 and 2009 Preparation of instrumentation, pick-up response analysis ( ) R. de Maria, U. Wehrle, W. Hofle (CERN) Simulations by Joel R. Thompson with head tail (2008) Simulations by Jean-Luc Vay et al. (LBL) Web meetings to follow-up collaborations organized by J. Fox (SLAC) Analysis of MD data of 2009: C. Rivetta (SLAC) Single bunch MDs: B. Salvant, E. Métral et al. Preparation of hardware for beam transfer function measurement W. Hofle, U. Wehrle, D. Valuch (CERN) LARP Initiative for SPS e-cloud FB - single bunch TMCI

Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20093/23 Observation of electron cloud instability in the past From G. Arduini et al, Proceedings E-cloud 2004 Observation of oscillations with strip line coupler (head tail monitor) along batch: - horizontal plane: coupled bunch behavior, strong correlation between bunches, low frequency (~ 1 MHz), taken care of by the present transverse feedback system -vertical plane: some bunches oscillate with large amplitude, single bunch oscillations, weak correlation between adjacent bunches, controlled by current transverse feedback and high chromaticity, emittances at the limit for nominal LHC beam (blow-up at tail of batch)

unstable bunch (  -signal)  -signals always stable (yellow) unstable bunch (  -signal) stable bunch (  -signal) 10 ns/div 5x72 bunches injected; 25 ns bunch spacing; machine well scrubbed with four batches shown are the last three bunches of the 5 th batch, vertical pick-up, shortly after injection evidence of single bunch multi-100 MHz transverse instability, Instability at injection of 5 th batch, analysis ongoing Wolfgang Hofle BE/RF4/23SPS Studies WG - November 17, 2009 MD with LHC nominal beam in June 2008 Considerable effort followed to understand signals and de-convolve coupler and cable response

Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20095/23 Exponential coupler Four such couplers installed in SPS (four electrodes at 45 degrees) can be used for MDs, hybrids and cables checked and their transfer functions measured in March 2008 (R. de Maria, Gerd Kotzian) Developed for SPS by T. Linnecar, Reference: CERN-SPS-ARF-SPS/78/17 phase response not linear frequency !

Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20096/23 Evaluation of 7/8” cables used for exponential coupler Pulse response and response to a bunch of with 4  =1.7 ns Full non-linear phase included in red trace (response to bunch) and green trace with ripple (pulse response); the other two curves correspond to fits of the phase with a sqrt(f) term only total length 447 m

Wolfgang Hofle BE/RFSPS Studies WG - November 17, 20097/23 Evaluation of 7/8” cables with corrugation 100 m sample, computed pulse response from measured S 11 in short circuit Additional phase term (cubic) due to corrugation Taken on by IEC standardization organization (at initiative of F. Caspers) see PAC 2009 paper TH5RFP033 (G. Kotzian, F. Caspers, S. Federmann, W. Hofle, R. de Maria)

Pick-up re-cabled with resistive combiners Wolfgang Hofle BE/RF8/23January 2009

2.5 ns/div Injection, 26 GeV/c (longer bunch) Single bunch signals after modification of pick-up connection (resistive combiners) (stable short bunch with ~5 x10 9 protons per bunch) Wolfgang Hofle BE/RF9/23January ns/div 450 GeV/c (shorter bunch)

Wolfgang Hofle BE/RFSPS Studies WG - November 17, /23 Reconstructing signal from pick-up see DIPAC 2009 paper mopd17 (R. de Maria et al. ) response measurement with short bunch Reconstructed signal during debunching longitudinal transverse

Single bunch signals after modification of pick-up connection (stable bunch with ~5 x10 9 protons per bunch) Wolfgang Hofle BE/RF11/23January 2009

Single bunch signals after modification of pick-up connection (stable bunch with ~5 x10 9 protons per bunch) Wolfgang Hofle BE/RF12/23January 2009 averages of 20 measurements A and B time-aligned (A+17 ps) pick-up strips not exactly equal !

Measurements on all four exponential couplers in the SPS (data from November 4 th, 2008) Wolfgang Hofle BE/RF13/23January 2009 FC, resistive combiners 1 st bunch of a train PU backwards installed FC, resistive combiners 1 st bunch of a train PU forwards installed CCR, H-183 combiners single bunch (semi-short) PU forwards installed vertical BPWA, small diameter (now) vertical BPWA, small diameter horizontal BPW, large diameter vertical BPWA, small diameter CCR, H-183 combiners 1 st bunch of a train PU forwards installed 1 st bunch of bunch train oscillates -> jitter in measurement; single bunch -> no jitter slow rise-time fast rise-time saturation or cable?

Wolfgang Hofle BE/RFSPS Studies WG - November 17, /23 Single bunch – spectral domain see DIPAC 2009 paper mopd17 (R. de Maria et al. ) Beam pipe diameter = 107 mm de-bunching, RF off

Wolfgang Hofle BE/RFSPS Studies WG - November 17, /23 Single Bunch and 25 ns bunch trains Transverse instability with captured beam see DIPAC 2009 paper mopd17 (R. de Maria et al. ) single bunch instability (TMCI) low chromaticity E-cloud instability

Wolfgang Hofle BE/RFSPS Studies WG - November 17, /23 Single bunch results See PAC 2009 paper TH5RFP047 (B. Salvant et al. ) Forrest of signals > 1.5 GHz from beam but enhanced by pick-up

Wolfgang Hofle BE/RFSPS Studies WG - November 17, /23 Simulation with headtail (e-cloud) no feedback, spectrum extends to ~ 1GHz

Wolfgang Hofle BE/RFSPS Studies WG - November 17, /23 Simulations with head-tail See PAC 2009 paper TH5RFP076 (J. R. Thompson et al. ) and AB report CERN-AB

Wolfgang Hofle BE/RFSPS Studies WG - November 17, /23 Courtesy J.D. Fox, simulations by team at LBNL (J.-L. Vay et al.)

Wolfgang Hofle BE/RFSPS Studies WG - November 17, /23 Courtesy J.D. Fox, analysis of 2009 MD data by C. Rivetta (SLAC)

Wolfgang Hofle BE/RF21/23January 2009 Pick-up re-cabled with hybrids for excitation (up to ~200 W) Pick-up used for observation

Wolfgang Hofle BE/RF22/23January 2009 Observed (transverse) spectrum with single bunch at 4xRF frequency (26 GeV/c) Same spectrum observed with and without excitation; signal disappears when beam is switched off  need to repeat spectrum measurement versus time with ramp down of chromaticity to catch onset of TMCI + excitation, NWA versus spectrum analyser

Wolfgang Hofle BE/RFSPS Studies WG - November 17, /23 Conclusions and outlook Instrumentation in the SPS improved and method developed to reconstruct time evolution of internal bunch motion, results for e-cloud and single bunch instability, should we build a new pick-up (precision-long coupler ?) Head-tail simulations with e-cloud and feedback showed that a minimum bandwidth of 300 MHz is necessary to damp the instability but unrealistic high gain is required; with larger bandwidth the necessary gain can be reduced, in practice with realistic gains up to 1 GHz bandwidth required Qualitatively the measured internal bunch motions agrees with simulation - strong head-tail tune shift observed as in simulation Single bunch measurements started as well (TMCI) Set-up prepared for beam transfer function measurements, not yet successful, need more time, possibly more RF power or a better sensitivity and a good technique for chromaticity control, first measurements  concentrate on single bunch J. D. Fox at SLAC is now looking into the technology available for ADCs, DACs, signal processing to cope with the required bandwidth