7 March 2006A.Ciocio - SCTSG1 SCT Services and Patch Panels Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing Workpackage https://edms.cern.ch/document/593278/

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
27 September 2005A.Ciocio - ID Week1 SCT Service Installation Overview Status of Type IV Cable Installation Type II/III Cable Installation Plan for the.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
31 January 2006A.Ciocio - SCTSG1 Type IV cables and PP3 Installation Type IV installation Connector in situ work Status of PP3 Testing.
29 November 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status of Type IV installation Connector in situ work Status of PP3 Testing.
SR1 ongoing workH.Pernegger21/2/02 Ongoing work in SR1 and preparations for detector macro assembly Heinz Pernegger.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
14 February 2006A.Ciocio - ID Week1 SCT Services Procurement & Installation Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing MTF Workpackage.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Setting up the Ricoh C305 Press F5 to start the Presentation
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
ID week - 26 September 2006 A. Ciocio1 SCT Services Installation SCT Cables Web page
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Electrical and Optical Cables Installation at P5 What When How H. Breuker
Pippa Wells25 October Procurement and manpower for service installation Services readiness dates Planning for type ii/iii Fibre installation dates.
Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
8 June 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Testing & Installation Plan Workpackage
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Tracker Summary Alan Bross MICE CM October 10, 2007.
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
14 December 2005A.Ciocio - SCTSG1 Services and Patchpanels Installation Type IV installation Connector in situ work Status of PP3 Type II/III Testing.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Status of NA62 straw electronics Webs Covers Services Readout.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
9 May 2006A.Ciocio - SCTSG1 SCT Services Installation Type IV PP3 Type II-III and PP1 Fibre Cables DCS Testing & Installation Plan Workpackage
13 September 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Delivery Installation Connector work Testing Summary.
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
25 October 2005A. Ciocio - SCTSG1 Type II/III Cables and PP1 Status & Plan.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
V. Bobillier1 Cable installation status.
31 January 2006A.Ciocio - SCTSG1 Type ii-iii and PP1 Production Timescale for installation Plan PP1and Testing.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Progress and plans for HO Installation S. Dugad, K. Sudhakar Tata Institute of Fundamental Research India-CMS Meeting at BARC, July 2005.
6 September 2007VELOEddy Jans 0 VELO-installation++ activities September 6, 2007 General items Detector installation plans.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Steinar Stapnes, LHCC June The ATLAS inner detector TRT endcap A+B TRT endcap C TRT barrel SCT barrel SCT endcap Pixels uWhole ID sits inside bore.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
Detector building Notes of our discussion
Service channels between Tracker and PP1
Service channels between Tracker and PP1
End-cap Mechanics FDR Overview of the Project
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
Chamber Design and Integration RE3/1 and RE4/1
ATL-IC-ES new version available - approval starts
Presentation transcript:

7 March 2006A.Ciocio - SCTSG1 SCT Services and Patch Panels Type IV PP3 Type II-III and PP1 Fibres Heaters DCS Testing Workpackage

7 March 2006A.Ciocio - SCTSG2 Status of Type IV Cables Cables production resumed last week (KontaktSysteme) doubles harnesses delivered –602 double harnesses to complete production Still to be tested and inspected Installation has very low priority but it is happening occasionally – ca. 250 harnesses installed out of 460 received for the USA side Installation will resume regularly in April Connector in situ (CPE) –All cables in US15 installed and almost completed with connectors on the PS end –A few racks are tested –Very good yield –Rack testing in progress –CPE will pause at the end of this week –Work will be resumed in April with racks in USA15 Encrease cost from both companies Racks on Level 6 US side

7 March 2006A.Ciocio - SCTSG3 PP3 PP3 units are produced in Melbourne and shipped to CERN –First 100 units were received in October –~1000 by December and several subracks of 30 units were assembled –1759 PP3s fully tested and 55 subracks assembled as of a month ago –2113 PP3 units just arrived at CERN The total number shipped should be 4103 But we need more PP3's total number There are spares in the middle of the rack (to skip PS channels - interlock modularity) and usually in groups at the top or the bottom Often top or bottom subracks are not completely used and we should optimize that occupancy – with empty boxes or mini subracks Mini subracks of different row-sizes it's not the best option (too many options) therefore we should build the standard subracks with the empty boxes The empty boxes should be at least 125 A few subracks of one row of PP3 are necessary for the very full racks that don’t have spares already at the top or bottom

7 March 2006A.Ciocio - SCTSG4 PP3 Assembly, Testing,Installation Assembly –30 PP3 units are assembled in one subrack –Insulating film applied on individual shield case –A few drops of silicone to hold them together –External clamp for rack mounting –Kapton tape strips to cover screw-heads –Extra kapton (or insulation film) inside the clamp Testing –Burn-in of 90 units/day Installation –Cables have been plugged in a few dummy Patch Panels during installation to be placed in the right (final) position and were tightened to horizontal bars –Cables will have to be all removed from the current position and plugged in by groups/rows when the installation of the real PP3 will occur –30 PP3 subracks (3 racks) have been installed so far Current Plan –Estimated installation of 90 units per day limited until now by delivery, testing capability and problems –Need 200 special PP3s soon to go in the first rack where bigger connector hood were used - requires more tolerance (shorter standoffs) –Rework of remaining subracks (10) that don’t have kapton tape on screws either by taking the subrack apart – but difficult at times and risk of damaging insulation or replacing shield case –Rework subracks that need extra insulation on the corner unit –Installation of PP3s in racks to which type III cables arrive with highest priority –Need continue SCT participation to meet schedule and long term presence of at least one technical staff –Scott Moncrieff (Melbourne) is at CERN working on assembly and installation

7 March 2006A.Ciocio - SCTSG5 Type II Services Timescale Sector 5 (top) and Sector 13 (bottom) –heater cables, and DCS cables –Just finished Sector 9 horizontal towards USA15 is currently being installed –SCT fibres and SCT power cables (886 cables + spares) –Fibres today –Barrel cables (side A and C) should start tomorrow Sector 3 –was supposed to follow sector 5, but was held up by problems with arches above detector and muon chamber installation –It’s going to follow Sector 9 Sequence in a sector is: –Tubes, fibres, heater cables, SCT cables, (Muon chambers), –TRT cables, pixel cables

7 March 2006A.Ciocio - SCTSG6 Type II/III & PP1 - Status INEO/Thurmelec are making double length harnesses with type II cable and type III spliced, and type II FCI/JST connectors on both ends as they receive information about the lengths Single length cables with FCT connector (PP3) are also produced –First 60 cables received + 60 coming (Sector 9) –200/week after to follow PPB1 – need small clamps, cable tray covers etc. (mid March) PPF1 – more parts needed. Cable clamp redesigned by NIKHEF. Other parts on order via RAL.

7 March 2006A.Ciocio - SCTSG7 Type II/III cables – Installation We measured with test cables the routing from cryostat to PP3 racks Found extra (more than extra) length to trim off – then new lengths were sent to the company –Labels printed and sent to company –Mapping defined – drawings for installation are made –Mapping for PP1 connectivity transferred to Nicolas/Sigi For installation of sector 9: –60 cables received + 60 coming –200/week after to follow –Found 3-4 m extra length on the type III –Sergei is adding cable tray loop near the PP3 rack Acceptance test –DPP1 are used to test cables before installation (mechanical and electrical tests) –Many use cycles on the very thin gold plating could create a surface that is too abrasive for the delicate JST –Use a DPP1 as a test fixture only 20 times, then swap –First batch of 60 cables fully tested (mechanical & electrical) – 100% yield –For future batches we will use a reduced acceptance test Will install PP3s in racks to which type III cables arrive with highest priority Will plug in type III cables (not the TC team)

7 March 2006A.Ciocio - SCTSG8 SCT Readout Cables - Status All cables for the SCT readout and 2 long cables which will cut to 38 FSI laser light delivery cables are at CERN 18 readout cables (9 side A and 9 side C) will be installed in sector 9. SCT readout cable protection: –End-cap: bare ribbons at the detector end of the readout cables will be temporarily protected using a foam tube. –Barrel: bare ribbons at the detector end will be temporarily protected near the PPB1 area by a protective plate that is being designed by Andy Nichols. The definition of the reference point and lengths of ribbons from the reference point became unclear during the tests with a model of PPF1. They are presently being clarified so that hopefully today we know the precise lengths. The installation of the first end-cap cables should start today

7 March 2006A.Ciocio - SCTSG9 SCT Fibre Cable Testing No acceptance test will be done before the cable installation to avoid spoiling the heavy duty rigging (Cables tested by Fujikura). After the cable installation, two test will be done: –Test of fibre attenuation: –TOF for all TTC fibres in cables: –Both attenuation and TOF test systems (described at categ=a055165&id=a055165s0t70/transparencies ) have already been tested at CERN. categ=a055165&id=a055165s0t70/transparencies

7 March 2006A.Ciocio - SCTSG10 ID Heater Cable Production and Installation TypeSec5Sec13Sec9Sec3Sec7Sec1Sec11Sec-15Totals B C D E F G44444 Totals Heater Pads (TE,IDEP….) PIX Evaporative Power SCT Evaporative Power Thermocouple ID Service FeedThu T ID Service FeedThu P Installed Ready to go Type III cut and ready to finish Total Cables Installed = = 253 Cables Tested = = 171 There are 2 Italian technicians here next week working on E-cables There is a German technician here this week working on C cables. Cryostat Cables Only TypeDamaged so far B6 C D E2 F & G

7 March 2006A.Ciocio - SCTSG11 SCT DCS Cables 128 type II and 40 type IV All cables for the barrel are in the pit 12 cables on sector 5 and 12 cables on sector 13 are installed and tested 3 cables in sector 5 were damaged during installation (caught on sharp edge of cable tray) – repaired 24 Cables in sector 9 installed and tested successfully

7 March 2006A.Ciocio - SCTSG12 Installation & Testing Type IVSandra TC team installation AcceptanceSCT After InstallationSCT In PP3 racks After ConnectorsPetr + SCT In US/A at PS end Type II/IIISandra Lars-Erik installation AcceptanceMartin + Pepe Only samples of double harness batches of cables are tested After InstallationSCT Cables are tested row by row as they are installed on tray PP3Shaun Burn-inSCT Assembly & InstallationMelbourne + SCT 2 techs required FibresKamil, Bilge Martin at the ROD’s end HeatersSteve 1 tech + SCT DCSRichard + Lars

7 March 2006A.Ciocio - SCTSG13 What to do To sign up for shifts (and contact me because of unexpected changing in rate delivery/testing problems) Safety courses: 1) basic safety training course (level video in B55) 2) Level 4 for working in US15 + Oxybox (we have them) If you have an AIS LOGIN (used for EDH documents), you can follow the course from anywhere (even outside CERN) with AIS login by accessing If you have no AIS LOGIN, you need to register at the following address 3) Level 4A mandatory to enter the ATLAS underground areas This course is composed of 4 modules : Cryogeny, Evacuation, Installation and Magnet. Each of these modules is followed by a small test which you have to take and pass. If you do not yet have an AIS login, please contact the ATLAS secretariat and ask for this AIS account (they must be registered with ATLAS). If this is not possible, we will organise special training at CERN. 4) make the access request on EDH 5) get your safety boots & helmet (or borrow them)

7 March 2006A.Ciocio - SCTSG14 Equipment IDs for MTF DB All equipment must have an MTF id to be installed in the pit (US/A or UX) Unique 14 character alpha numeric code Discussion with ID people about the equipment ID for MTF Fully digital code from SCT (and Pixel) production DB is acceptable All other ID equipment should have a code like 20ISDAQ Defining Power Supply and ROD items Each subsystem should have a contact person for MTF

7 March 2006A.Ciocio - SCTSG15 LINKS Summary SCT Cables Web page Mapping, technical appendices, cables related documents Shifts Shift planner (developed by D. Robinson) works very well for planning the activities and have people to sign up Safety courses Level basic course for access underground and point 1 Level 4: with AIS login Level 4A: AIS login Overall Safety and Health Procedure Document PPSPS – Rack Wizard – ID installation Tuesday mornings, CRM (control room management) meetings Wednesday mornings ID/TC installation meeting