EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan www.kuraarasbasin.net.

Slides:



Advertisements
Similar presentations
Confidence building in transboundary river basin management context Michal Nekvasil EU Delegation to Georgia Water seminar Dead Sea, Jordan March.
Advertisements

Workshop on the prevention of accidents of gas transmission pipelines The Hague, 8-9 March 2006 Sergiusz Ludwiczak.
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities An EU project managed by the European Agency for.
BUILDING PARTNERSHIPS FOR ENERGY SECURITY
ENPI FLEG Regional Activities: WWF’s Progress, Achievements and Impacts Elena Kulikova Director of Forest Programme WWF Russia.
ECOLOGICAL STANDARDS OF MARINE ENVIRONMENT QUALITY DEVELOPED BY: Research Organization “Ukrainian Scientific Centre of the Ecology of Sea” (RO UkrSCES)
Reducing Trans-boundary Degradation of the Kura-Aras River Basin UNDP/Sida United Nations Development Programme Swedish International Development Cooperation.
UNDP-ENVSEC Project Fostering a Dialogue between Riparian States for Development and Establishment of Initial Legal and Institutional Frameworks for Increased.
European Commission, DG Environment Brussels, April 2006 Christof Planitzer DG ENV Slide 1 Fish & Shellfish Water Directives 78/659/EEC & 79/923/EEC.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
CHEMICAL-PHYSICO MONITORING SUPPORTING ECOLOGICAL STATUS FOR THE EU WATER FRAMEWORK DIRECTIVE BY MICHAEL JACKMAN CHEMISTRY EXPERT.
The United Nations Economic Commission for Europe (UNECE) Convention on the Protection and Use of Transboundary Watercourses and International Lakes A.
EuropeAid Development and Co-operation Eastern Partnership Flagship Initiative: Programme for the Prevention, Preparedness and Response to Man-Made and.
Water.europa.eu Assessment of the River Basin Management Plans – preliminary findings Conference on River Basin Management Planning Ankara, 28 February.
Project situation analysis and technical reporting UNEP/GEF FNR_Rio project – 3 rd Project Steering Committee, March 13 th, 2012, Tehran, Iran Peter Herkenrath,
NATO-CCMS Pilot Study Tour de Table - Greece Recent Developments on Contaminated Land in Greece Anthimos Xenidis Laboratory of Metallurgy National Technical.
Development of lake Druksiai/Drisviaty Basin Management Program Feasibility study.
Module 4: RBM Planning regarding Blueprint document, training skills, transboundary issues, public consultations, negotiation skills Transboundary cooperation.
Enhancing Access to Information and Public Participation in Environmental Decision-making UNDP-GEF Danube Regional Project Component 3.4 Magda Toth Nagy,
June 12-16, 2005 Ottawa, Canada NATO CCMS Pilot Study PREVENTION AND REMEDIATION IN SELECTED INDUSTRIAL SECTORS: Mega-Sites Transboundary Cooperation for.
NFP/EEA Working Group on Eionet priority data flows (EPDF) - Status and developments for water Beate Werner Eionet FW workshop Copenhagen, 18 – 19 June.
Powerpoint Templates Page 1 Powerpoint Templates Black Sea Basin Directorate – presentation of the scope, responsibilities and project interests Mrs. TANYA.
Dzidra Hadonina Ministry of the Environment of the Republic of Latvia Kiev, Ukraine, November 22-24, 2004 Legal Framework for Cooperation in the River.
1 - DG ENV Brussels, 5 March 2003 Draft INSPIRE Legislative proposal The key issues 9th INSPIRE Expert Group Meeting Brussels.
Component 5.2 Harald Marent, Veronika Koller-Kreimel, Austrian Ministry for Agriculture, Forestry, Environment and Water Management Edith Hödl-Kreuzbauer,
08 th Meeting of the Working Group on Flood Management and Climate Change Adaptation Kiev, Ukraine 13 December 2013 Project Overview Project: Climate Change.
1 United Nations Economic Commission for Europe 1 ENPI/SEIS Consultation Meeting European Commission, Brussels, 11 November 2010 Current Situation and.
Work of the Task Force on Water and Climate Jos G. Timmerman Rijkswaterstaat Centre for Water Management.
3. Pilot projects on transboundary rivers under the UN/ECE Water Convention.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
Project «Development of lake Druksiai/Drisviaty Basin Management Program », Initiative of UNEP-UNDP-OSCE-NATO "Ecology and Safety”»
Turkey-FAO Partnership Programme (FTPP-II) Planning Workshop Bishkek, Kyrgyz Republic 15 December 2015.
TISZA RIVER BASIN SUSTAINABLE DEVELOPMENT PROGRAM (TRB-SDP) Challenge for Transboundary Cooperation Kálmán MORVAY & Péter VARGA PhD Tisza-Szamos Public.
Matthias Wentzlaff-Eggebert, BZgA This work is part of the Joint Action on Improving Quality in HIV Prevention (Quality Action), which has received funding.
Ecologic.de Public Participation- Key element of EU Water Policy Nicole Kranz Ecologic - Institute for International and European Environmental Policy.
Stela Barova, senior expert, “Marine environmental protection and Monitoring” Department, “Plans and Permits” Directorate State of play of MSFD implementation.
1 European Topic Centre on Water Workshop on: Identification of surface water bodies under the Pilot River Basin Initiative Monitoring Water Bodies Steve.
3rd Biennial GEF IW Conference Brasil, June UNDP/GEF Danube Regional Project and Public Participation in the Transboundary River Basin Management.
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
Monitoring Visit to NatRisk Project
EMODnet Chemistry 3 Kick-off Meeting May 2017
Alexander Petrovich Dalimayev,
Twinning – a Tool to Develop Education and Evaluation Systems
Advancing Dissemination of Environmental Information and Public Participation through Electronic Information Tools Aarhus MOP-5, Maastricht, July 1, 2014.
Project Coordination Group (PCG) for the implementation of the MSFD
Civil Protection Financial Instrument – Prevention Projects
D8 and D9 REVIEW PROCESS April-June 2014: February 2015:
State of play of French progress in cost-effectiveness analysis
Introduction to the training
Philippe QUEVAUVILLER
Commission report on Art. 8 WFD Monitoring programmes
Draft Work programme / revised mandate for WG F
at Umweltbundesamt GmbH Wien
Natural water Retention Measures
Introduction- Link with WG E activity CMEP PLENARY MEETING-PRAGUE
Cluster Knowledge Integration and Dissemination
on a protocol for Intercalibration of Surface Water
Meeting of Water Directors Eutrophication Guidance
Project 2.7 Guidance on Monitoring
Workshop on metals bioavailability under the Water Framework Directive
Update WG Eflows activity and link with EcoStat
Water Framework Directive, Habitats Directive and Inland Waterway Transport Marieke van Nood WFD Team, DG ENV.D.2, European Commission.
Preparation of the second RBMP in Romania
EU Water Framework Directive
WG PoM 15 October 2015, Brussels
WG A ECOSTAT Draft Mandate
Scientific Support to Policies
Workshop WFD and Hydromorphology Brussels, June 2012
EU Water Framework Directive
Presentation transcript:

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan  Regional Project  Beneficiary Countries: Armenia, Georgia, Azerbaijan  Managed from the project office in Tbilisi  Client: European Commission, DG EuropeAid  Consultant: EPTISA & Grontmij-CarlBro Consortium  Start: June 2008  Duration: extended until Dec 2011

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan Project purpose:  To help Georgia, Armenia and Azerbaijan to improve river water quality in the Kura River basin through transboundary cooperation and adoption of the river basin management approach  To improve capabilities of environmental authorities and monitoring establishments in Georgia, Armenia and Azerbaijan in water resources management in the Kura River basin

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan Project Partners: Georgia:  Ministry of Environmental Protection and Natural Resources  National Environment Agency Armenia:  Ministry of Nature Protection  Water Resources Management Agency  Environmental Impact Monitoring Centre Azerbaijan  Ministry of Ecology and Natural Resources  National Hydrometeorology Department  Environmental Monitoring Department

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan Key Activities:  Pilot projects: Draft river basin management plans (RBMP) for 5 pilot river basins using EU Water Framework Directive methodology  Joint Transboundary River Monitoring Programme to harmonise sampling and analysis procedures  Proposals for improvements in the data structures and information flows to facilitate decision making  Training and technical guidelines - EU Study Tour for the beneficiaries’ staff from the project countries  Public awareness raising of the priority transboundary water issues in the Kura-Aras River basin

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan To help Project Partners to understand EU Water Framework Directive methodology the following key documents translated to Georgian, Armenian and Azeri, printed and delivered to the Beneficiaries  EU Water Framework Directive  EU Floods Directive  WFD Technical Guidance: Identification of Water Bodies  WFD Technical Guidance: Analysis of Pressures and Impacts  Introduction to Biological Monitoring of Water Quality

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan Pilot river basins:  basin characterization/pressure-impact analysis  identification “water bodies at risk”  setting environmental objectives  programme of measures

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan Pilot river basins: Alazani-Ganykh; Debed-Khrami; Aghstev; Ganjachai; Aragvi

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan Joint Transboundary River Monitoring April, June, September, December 2009  Agreed common procedure and reporting format: before sampling, sampling, after sampling  Analysis: standard methods  Inter-laboratory testing  Review of existing practices and QA procedures: questionnaires, visits to the labs  Workshops  glp guidance

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan Joint Transboundary River Monitoring

4th RBM Workshop JMP in Kura River basin Selected parameters Temperature C Transparency Dissolved oxygen Oxygen saturation pH Salinity Conductivity Total suspended/Total dissolved solids BOD5 COD Ammonia nitrogen, ammonia Nitrate nitrogen, nitrates Phosphates Copper Zink Iron Manganese Cadmium Nickel Led Molybdenum Petroleum products Arsenic Phenols

JMP in Kura River basin Overall Evaluation of three Sampling events 4th RBM Workshop

JMP in Kura River basin River water quality data – comparison of heavy metals (1) There are differences in the concentrations of heavy metals between the countries and results from the National Reference Laboratory. RPD= (NRL-country)*100 (NRL+country)/2 RPD for Zn ARM-104% AZ-195% GE-17% The lower value of RPD means the more precise measurements. 4th RBM Workshop

JMP in Kura River basin River water quality data – comparison of heavy metals (2) 4th RBM Workshop

JMP in Kura River basin River water quality data – comparison of heavy metals (3) RPD= (NRL-country)*100 (NRL+country)/2 RPD for Cu ARM-1,7% AZ-114% GE-92% The lower value of RPD means the more precise measurements.

Interlab testing Preliminary comparison of the results from the 1st and the 2nd Inter- laboratory testing 4th Workshop

JMP in Kura River basin River water quality data from the 2nd and the 3rd Sampling (3) However, there is better situation with NO3 and PO4 and in the case of 3rd sampling the results are comparable. 4th RBM Workshop

EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan

THANK YOU !