Assets Returned From Lease Project: 0307-01-003 Bill Cody Black Belt September 25, 2003.

Slides:



Advertisements
Similar presentations
Chapter 20 CONTROLLING FOR ORGANIZATIONAL PERFORMANCE
Advertisements

PG&E’s Proposed Bankruptcy Settlement Excess Costs and Savings Potential with DRC Bond Issuance The Utility Reform Network September 3, 2003.
High Value Revenue Cycle Audits AHIA 2009 Annual Conference September 1, 2009.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
Strategic cost analysis 2
The Strategic Management Process
Barry Murash MBBit Nortel 2007
SIX SIGMA. What is six sigma? Sigma is a measure of “goodness: the capability of a process to produce perfect work. A “defect” is any mistake that results.
Six Sigma Black Belt Project Information Prepared: July 20, 2004.
Chapter 20 CONTROLLING FOR ORGANIZATIONAL PERFORMANCE © 2003 Pearson Education Canada Inc.20.1.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Managing Project Quality
Operations Management
METODOLOGI SIX SIGMA PERTEMUAN 12 IMPROVE PHASE OLEH: EMELIA SARI.
6 Sigma Hazırlayanlar : Emine Yılmaz Cansın Eminoğlu.
Welcome to Lean Six Sigma Green Belt Training
M A N A G E M E N T M A N A G E M E N T 1 st E D I T I O N 1 st E D I T I O N Gulati | Mayo | Nohria Gulati | Mayo | Nohria Chapter 10 Chapter 10 PERFORMANCE.
0 0 Six Sigma – Financial Overview. 1 1 Roles and Responsibilities of the Finance Support Team Policy Setting – Define Savings/Benefits – Provide tools.
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Lean Enterprise. It’s the one word we all know, waste. In fact we can be more specific, any human activity which absorbs resources but creates no value;
Lean Six Sigma: Yellow Belt Advanced © Max Zornada (2012) Process Objective: Establish current/baseline performance or process and quantify customer requirement.
0 Six Sigma Project Guidance. 1 Roles and Responsibilities of the Finance Support Team Define Savings/Benefits Provide Financial Support – Project Selection.
Global Economy (International Business) n Importance to DFW Area n Why TXU Went International n How TXU Decided Where to Enter (the Strategy) n What TXU.
Define Tollgate Checklist
Estimating Project Benefits ISE Sr. Design
What is Transportation Cost Management? A Proven and Measured Approach Reduces Transportation Costs (between 8-15% or more) Optimizes choice for low cost.
PRIMO Limited & 6 Sigma By HKU SPACE 6 Sigma Consultant Firm 30-May-2006.
1 DMAIC Define Overview Paul Grooms Black Belt in Training.
9. Applying scientific tools & techniques for improving customer satisfaction.
DMAIC 1. (Define, Measure, Analyze, Improve and Control) is a process for continual improvement. It is a systematic and fact based approach to plan, sequence.
CSE 577b - Six Sigma1 Outline What is Six Sigma? Six Sigma methodologies Process Improvement — DMAIC Define – Measure – Analyze – Design – Verify (DMADV)
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
Price Support (Vendor Rebates) Outside Vendor Window Black Belt: Debbi Youmans-McCreary Division: INA - eIKON BU – Ops/Vendor Credits/Southeast.
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Operations/Northeast BU – Steering Comm Presentation.
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
Project Update Effective Product Launch Vendor Integration Inga Broerman Black Belt Marketing - Corporate.
Project Charter Revenue/Sales Implications of Trials Black Belt Jack Thackrah NE Region BS – Malvern PA.
Meter Reads-Method Project Number Black Belt Rob Zinsky Northeast region.
Sales Forms Package Art Zieky INA-Sales Operations Macon, Malvern.
Project Chartering & Approval Process
Assets Returned From Lease Project: Bill Cody Operations Columbus OH.
Six Sigma Black (& Blue) Belt: Jeanette Wall. Unapplied Cash-Calculation Error Jeanette Wall Operations Location- Company-wide CANCELLED!
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
Meter Reads-Optimum Calling Process Project Number Black Belt Rob Zinsky Northeast region.
Service Productivity- Parts Project # Black Belt – Rich Capasso Northeast Region.
© 2003 Six Sigma Academy Sustainability & Leveraging Success Champion Workshop.
Roles and Responsibilities of the Finance Support Team
Unapplied Cash: eIKON Dealer Compensation Joyce Darson NE Region CCC.
Connecting the dots … between Finance and Operations in Telecoms Don van Splunteren VP Sales, NAAP Global Solutions.
Collections Accountability Leases that Terminate into Term Code TMDCR Tom Merry October 23, 2003 Week 4 Presentation.
Assets Returned From Lease Project: Bill Cody Black Belt Week 3 Report Out.
Management Information Systems MANAGING THE DIGITAL FIRM, 12 TH EDITION MAFI 419: Management Information Systems ACHIEVING OPERATIONAL EXCELLENCE AND CUSTOMER.
Project Charter Template Note: Multiple “Tabs” in Project Charter Template.
Deal Approval Process Project # &
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Northeast BU – Forecasting/Service/ Revenue/Base/Type of Machine.
Contract Setup Project Black Belt: Rob Vaughn Week 3 Presentation Houston, TX.
Credit/Rebill – Field Service Incorrect Billing. The Problem We are generating invoices for service calls on machines that have contracts, are IKON fixed.
Collections Accountability Leases that Terminate Following Automatic Renewal Tom Merry September 24th, 2003.
Meter Reads- Web Meter Effectiveness Project Number Black Belt Cathy Delvalle Atlanta CCC.
9 - 1 Chapter 9 Management Control Systems and Responsibility Accounting.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
 The concept of Quality is very broad and can be defined in various way:  From the customer point of view: (Specification Quality) › Quality is the.
Six Sigma.
Chapter 20 CONTROLLING FOR ORGANIZATIONAL PERFORMANCE
SIX SIGMA IMPLEMENTATION
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Quality Management Six Sigma
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton ©2008 Prentice Hall Business Publishing,
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Assets Returned From Lease Project: Bill Cody Black Belt September 25, 2003

2 Background n IKON assets remain with at customer locations after lease obligations are met n Nationally, 84,000 assets are tied to contract terminations yearly; 20,000 are in the West Region n Recovery rate in West Region is 88%, translating to 2,400 assets not being recovered. n Non-recovered assets at customer locations represent lost revenue opportunity from a wholesale and retail perspective with associated margin impacts n Six Sigma Process will focus on improving the recovery rate for the West to 95% thus providing IKON with incremental revenue and margin

3 Project Charter & Uncovered Opportunities n Project Charter Identified Revenue Opportunity of $1.8 million with 95% Recovery Rate Achievement n Based on further analysis - opportunity potential in excess of $3.5 million n Original Data Excluded Total Region (old Southwest District basis) n Current Process Review Activities have Identified Additional Opportunities (still to be Validated): n Headcount: n Headcount: currently 9 Associates involved within Phoenix CCC n Process benchmark in NER utilizes 2 Associates for similar volume n Cycle Time: n No current measures in place for Cycle Time n Assets remain “unrecovered” in excess of 1 year n Reduction in Cycle Time generates earlier Revenue/Margin recognition

4 Process Discovery n Current Process Focused Solely to Asset Recovery based on IOS Capital Direction which Encompasses only 6% of the Lease End Recovery Base n No Centralized Process or Ownership to Insure all Assets are Accounted => Multiple Touch Points with Minimal Interactions n Poor Process Communication between Recovery Team and Field Organizations including Supply Chain n Process Redundancies Identified creating Potential Unnecessary Manual Inputs

5 Project Improvement Focus n Process Capability will be Improved from Current Output utilizing fewer Associates: n Standardize Process and Centralize Ownership to CCC n Elimination of Redundancies currently Required n E.g. Individual Pickup Order Generation for Multiple Machines located in same Location (Process Capable - validated in Northeast and Midwest Regions) n Strengthen Communication links with Key Constituents (CCC/CC/Marketplace) through improved Process Outputs n Ongoing Process Model Validation through Key Measures and Controls

6 Next Steps n Benchmark Detailed NER Process Capability to Determine West Region Output Potential n Validation of Process Inputs and Ranking of Each n Measurement System Development focused to Volume, Defect Detection and Cycle Time Measures n Analyze Data Collected to Isolate Areas of Immediate Focus n Implement Appropriate Changes Sooner than Later when Data Supports

7 QUESTIONS?