ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.

Slides:



Advertisements
Similar presentations
Surge Pressure Computations
Advertisements

CONSTRUCTION DRILLING INC.
Assessing the Effects To Fish From Pile Driving: Application of New Hydroacoustic Criteria February 25, 2009 David Woodbury NMFS, Southwest Region Protected.
HVAC CONTROLS (See section 18.9)
Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014
Pile Driving Equipment
Small-Scale Fish Screen Selection Workshop
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
Foundations Excavations
Boiler Mountings.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Contract Specifications Background on.
Watershed System Physical Properties Stream flow (cfs) Stream Channel Pattern Substrate Chemical Properties pH Dissolved Oxygen Temperature Nutrients Turbidity.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Hydroacoustics Ken Cannon, ODOT Aquatic Biology Program ESA Document Training, May 26, 2010.
Wave/Tidal Energy by: Karina Ayala, Rachael Carleson Williams, Lidya Makonnen, Terrell Stevenson.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
Chapter 19 Floors.
Basic Civil Engineering-Foundation
1402 Hybrid Firefighter I 6 th Edition Chapter 14 Water Supply.
USGS Procedures for High-Flow Measurement using the Price AA Meter Annual Tri-Agency Coordination Meeting Memphis, TN Mark E. Smith USGS.
Overview of AIRE-O2 Triton® Technology
Design of Bypass Systems Special thanks to Ed Meyer, who provided the framework for most of these slides.
A portable 6-inch diesel-powered trash pump was used to pump water from Little Topashaw Creek for gully erosion tests February 4 and 5, 2002.
Other Construction Projects
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 When a new project begins early coordination,
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Bank Stabilization Streambank or channel.
High School Water Edition Fall 2012, Version 1.0.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Casing Design.
CAISSON FOUNDATION.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Roles & Responsibilities Project Biologist.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Highway Aid Programmatic.
Woodrow Wilson Bridge Project 1 Fish Protection Strategies on the $2.45B Woodrow Wilson Bridge Project ~Presented By~ Mike Baker, Environmental Manager.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Hydroacoustics ODOT Hydroacoustic Work Group Agreement on Thresholds Specifications Effects to fish Attenuation Monitoring and Reporting Information needs.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
TRENTON Casing Filler Presentation
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Drafts and Duct System Sizing
I-5: Willamette River Bridge (WRB) Replacement Hydroacoustic Project Development A Case Study ODOT Hydroacoustic Training May 14, 2009.
DIESEL FUEL FILL 1.Secure Fireboat 2 to fueling dock, fueling vessel, or vessel to receive fuel (Fig ). 2.Develop communications as needed, including.
A Primer on Pumps Shenandoah Valley December 2, 2015.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
Natural Resources Waste Water Management. Wastewater entering the treatment plant includes items like: Wood Rocks Dead animals Wedding Rings  Unless.
Screening: Wastewater entering the treatment plant includes items like wood, rocks, and even dead animals. Unless they are removed, they could cause problems.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Hydroacoustics and Transportation Projects “Change is the only thing that is constant” -Heraclitus -Diogenes Laertius -Transportation Professionals.
Bulb Piles –Franki Piles or pressure injected footings –Special form of cast in place pile with an enlarged base for increased load bearing F 10-4 Minipiles,
CTC 450 Review 1  WW Characteristics. Objectives 2  Understand the basics of storm drainage systems  Understand the basics of sewer systems.
Lake clean-up process. 1. Project overview The compressed air can reach into the contaminated area to treat, and contaminated materials are separating.
COFFERDAMS.
CAISSON FOUNDATION.
Concrete Repair presented by: Amirhossein Jodeiri Mapua Institute Of Tecnology.
S.T.B.S. College of Diploma Engineering
Riprap Installation Construction Inspection for Field Office Activities Will use Riprap Gradation and Riprap Subgrade Problems from Class Problem Section.
Excavation & Trenching Awareness Plus
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
Concrete Repair.
2015 FAHP Annual Meeting For Oregon’s Programmatic Endangered Species Act Consultation on the Federal-Aid Highway Program March 15, 2016.
Find : Velocity V and discharge Q Problem 2
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
B.V.Patel Institute of Technology-Diploma studies
Water.
TRENTON Casing Filler Presentation
ENG421 (6abc) – Screens and Grit Removal
Suryoday Technologies ISO 9001:2015 Co.
Running Water and Groundwater
Maintenance.
Large Air Systems – Sales Training
Presentation transcript:

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving near Steller Sea Lions Columbia River (up to Bonneville Dam) or within 10 mi. of known haul-out Known Haul-out Locations –See Appendix 8 Biological Monitoring –Qualifications Stop work if present within 1,200 feet –More Information About Specs Later Otherwise Observed During In-Water Work? Page/Append. references are for May 2013 User’s Guide

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Haul out locations: Three Arches Rock & Sea Lion Caves Cape Arago State Park Orford Reef & Rogue Reef Oregon Islands National Wildlife Refuge South Jetty Columbia River

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 (Appendix 8)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 (Appendix 8)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Installation Standards relevant when ESA-fish may be present (pg 36) Concrete, Steel Round < 24” diameter, Steel H-Pile < HP24, or untreated wood pile Minimize impact hammer –Specify vibratory whenever possible –“Proofing” –No impact hammer when ESA fish <2 gm present –Sound attenuation for impact/steel piles See Appendix 7 More Information About Specs Later

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Use tide cycles Dewater area Seasonal Timing Acoustic Isolation

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 If water velocity is 1.6 fps or less, surround the pile being driven with a bubble curtain (per Appendix 7), that must distribute small air bubbles around 100% of the pile perimeter for the full depth of the water column.

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 If water velocity is greater than 1.6 fps, surround the pile being driven by a confined bubble curtain that must distribute air bubbles around 100% of the pile perimeter for the full depth of the water column.

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Bubble Curtain Requirements (Appendix 7) –Due to water depth there may be a need for multiple bubble rings –Rings should be no more than 20 in from the outside surface of the pile –The ring should be flush with the bottom substrate and attached to a frame –In a confined bubble curtain, spacers or pile guides should be included to keep the walls of the system from touching the pile being driven Pile Driving Sound Attenuation

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Confined bubble curtain: –Sufficient room at top, above the maximum water level expected So when the air delivery system is adjusted properly, curtain does not act as a water pump –Install pressure meters At all inlets of aeration pipelines and at points of lowest pressure in each branch of the aeration pipeline –Install main line flow meters at each compressor and at each branch of the aeration pipelines at each inlet –See Appendix 7 more more details Pile Driving Sound Attenuation (cont.)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Performance: –Unconfined bubble curtains In Washington, effective up to 17 dB attenuation (9 to 12 dB more typical) –Confined bubble curtains In Washington, lack of data Other locations, effective 9 dB to 30 dB –Expectations for FAHP Env. Inspections Monitoring Pile Driving Sound Attenuation (cont.)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Removal Requirements: (pgs 37-38) –Use vibratory hammer when possible –If using crane, “wake up” (vibrate/wiggle) –Non-creosote pile Try to remove all in work zone See pg 37 for more details If breaks during removal & in a shipping/dredging channel, mark locations of broken piles with GPS Data in Project Completion Report Page # references are for May 2013 User’s Guide

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Removing creosote piles: –Minimize sediment disturbance & turbidity –Floating boom, equipment out of water, etc. (see pg 37-38) –Dispose as Hazardous Waste Pile Removal (cont.)

ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013