STBD. BOAT DECK MONITOR HEAVY CORROSION FOUND INSIDE ELECTRICAL MOTORS RENDERING THE MONITOR NON-OPERATIONAL.

Slides:



Advertisements
Similar presentations
Tie rods or Tie bolts To understand the role played by tie rods, it is necessary to appreciate what is happening inside the cylinder of the engine. When.
Advertisements

Inspected in port Shanghai from 26th to 28th Sept by NCL
Manitoba School Bus Pre-Trip Inspection
Case Study PVC Column Replacement My Steel Casing has Disappeared.
Lesson 31 Main Engine Repair (II).  1. Crankpin bearing overhaul  2. Fuel pump removal & re-installation  3. Cylinder head removal/replacement  4.
Put a drop of oil inside the wire holder caps – stops rust.
Online Auction Wednesday. 2Estate Maintenance Quantity : 7 MT Lot No 1 – Cross Member.
Boating is fun… we’ll show you how America’s Boating Course 3 rd Edition 1Trailering Chapter 4 Section 14 >>
Mako-Lube Applications Docks and Ports. Company Profile Premium Quality European manufactured products  Well established and extensive product range.
Starboard Side: Looking Forward Notch accessed by removing small Teak pieces A fore/Aft floor support was fit into this notch, which was, of course, one.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Coop Training : Central Heavy Equipment Department In Aramco King Fahd.
Office of Marine Safety Stability and Flooding Eric Stolzenberg.
CAFS On-Line Orientation
Objectives : ANALYZE home maintenance techniques.
Cargo Gear Survey … …………………......……………... ILO 32 ………………….…..……………………………. ILO ………………………………... TNS 15 Regulations.
The Development of Specialized Skills Ship-Handling & Navigation Operation of Deck Equipment, ie. Anchors, Knot Tying, Line Handling Dealing with Emergencies,
Exposure to chemicals - Maersk Drilling Norway CAKE.
What do you think is made of iron? Iron does go rusty, it flakes away, which allows more iron to rust. Rust = Corrosion.
 2009 Watch keeping principle Watch keeping principle- Simple mistakes leads to serious damages.
MANAGEMENT CULTURE ISM 2.0 YOU ARE THE BOSSES, ACT LIKE THAT!! SAFETY CULTURE HAS TO BE IMPROVED ZERO TOLERANCE ON SAFETY VIOLATIONS ONBOARD MANAGEMENT.
Scavenge fires Oily carbon deposits build up in the scavenge trunking during normal operation of the engine. Drains are provided in order to remove such.
exhaust regulator valve
CH-47D Auxiliary Power Unit
Introduction Topic: Internal Gear/Lobe Pump Name: Matthew Stoangi Objective: To provide a clear understanding of the mechanics involved within an internal.
Puesta Del Sol II Progress and Update Report May, June, & July, 2000.
TH-57 Fuel System Review.
Aztec Sensible Cooling System  Series ASC 1A01  Indirect Cooler –No direct contact of water into the supply air –Stainless steel cooling tower –Fill.
DIESEL FUEL FILL 1.Secure Fireboat 2 to fueling dock, fueling vessel, or vessel to receive fuel (Fig ). 2.Develop communications as needed, including.
Fire Fighting Systems Fi Fi Mains ●White System: This system has a lower output as far as volume goes. This main supplies 3x Eductor/Hydrants (500 gpm).
Weekly Checks Monday – VSP Room Tuesday – Pilothouse System Controls Wednesday – Starboard / Engine Room Thursday – Foam Room Friday – Port / Engine Room.
BOAT Regulatory Gross Tonnage – 199 Registered Length – 96’7” Registered Breadth – 29’ Registered Depth - 13’3” Draft – 14’ 6” Air Draft – 46’
Power Distribution System General Location. Power Distribution The Main Switchboard is the hub of the electrical distribution system. Everything ties.
Red/Green Fire Fighting Systems Fi Fi Mains ●Red System: Port Side Fire Main supplies two Monitors. M7 (6000) gpm on centerline on the fwd Wheelhouse top.
A/C Power Systems General Locations. This module will cover the General Locations of the A/C Power Systems through out the vessel. The A/C Power Systems.
Internal Communications Systems
LESSON ONE CYLINDERS & CRANKCASE.
Fire/General Service/Ballast Pumping Systems
Machinery Cooling Water System Locations and Operations.
Roll up Door CHECK GEAR OIL CAPACITY MAINTAIN AT FILLER PLUG LEVEL
Forward & Aft Searchlight Operate Forward & Aft Searchlight.
Getting Underway – Engine room
Engine Performance BASIC MAINTENANCE AND LIGHT REPAIR.
Life Line. Belay Line Canteens Clean and change water.
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 1 Towards Ecal Assembly Julien Bonis
Shore Power Connection Check the connection on the boat Check the breaker on the dock ON OFF.
ENGINEERING ADVENTUREwww.BLOODHOUNDSSC.com BLOODHOUND SSC ATSM AIR INLET ASSEMBLY FOR THE AMAD GEARBOX The following explains the ATSM assembly and some.
 Is the room or platform from which the ship can be commanded. When a ship is underway the bridge is manned by an OWO (officer of the watch) aided usually.
Knowing about Electric Fuel Pumps. An electric fuel pump is a device used to power an automobile's engine by directing the fuel through electronic means.
Sub:- Fluid Power Engineering Topic :- Hydraulic crane
Ferrari Testarossa 1987 OS Giken Clutch Replacement Document Version
Temperature Test Allows monitoring of temperature changes.
Possible causes of water pump failure
Fuel-Injection Systems
CAP SANTE INTERNATIONAL PROJECTS
Friday – port side engine room weekly checks
Objectives : ANALYZE home maintenance techniques
TH-57 Fuel System Review.
TIPS TO MAINTAIN YOUR NEW AUDI CAR. THESE ARE THE THINGS TO BE TAKEN CARE TO AVOID DAMAGES FOR YOUR HEAVY INVESTMENT CAR, PEOPLE SEARCH MORE USED AUDI.
Stainless Steel Water Well Casing.
RESCUE BOAT DAVIT CME Models: D & D
FULL SAIL MARINE Projects
Camera Connections 1 4 Connect camera to outlets inside grey box in the Pedestal. Turn Monitors on to channel 31. Turn toggle switch on, Aft plenum toggle.
WATER DISPLAY Deck Operations.
Rusting.
CAFS On-Line Orientation
Chapter 11 Lesson 3 Engine Top End.
Floor Plan A horizontal section view of a structure taken about 4’ from floor level, It shows all exterior and interior walls, doors, windows, patios,
4 Chapter Power Tools and Equipment. 4 Chapter Power Tools and Equipment.
Fuel-Injection Systems
Presentation transcript:

STBD. BOAT DECK MONITOR HEAVY CORROSION FOUND INSIDE ELECTRICAL MOTORS RENDERING THE MONITOR NON-OPERATIONAL

MONITOR ELECTRIC MOTOR CONSEQUENCE OF SALT WATER IN ELECTRIC MOTORS RUST IN GEAR HOUSING RUST MIXED WITH OIL

MONITOR ELECTRIC MOTOR RUST IN GEAR HOUSING

MONITOR ELECTRIC MOTOR BEARING COMPLETELY RUSTED RUST MIXED WITH OIL

CRANE PEDESTAL HYD. ASSEMBLY SUPPORTING BRACKET COMPLETELY RUSTED SALT DEPOSIT FOUND UNDER BRACKET BENDING BRACKET HIGH PRESSURE HYDRAULIC BOX RUSTED CONSEQUENCE OF SALT WATER IN CRANE HYDRAULIC COMPONENTS

CAPSTAN CORRODED FITTINGS ON AERIAL LADDER FROM CRANE CONSEQUENCE OF SALT WATER IN ALL FITTINGS SECURING THE LADDER

CRANE CONTROLS CONSEQUENCE OF SALT WATER IN CRANE HYDRAULIC CONTROLS HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO CRANE HYDRAULIC CONTROLS CONSEQUENCE OF SALT WATER IN CRANE HYDRAULIC CONTROLS

HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO ELECTRICAL WIRING CRANE BASKET ELEC. BOX HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO ELECTRICAL WIRING CONSEQUENCE OF SALT WATER IN CRANE BASKET ELEC. BOX

CRANE PEDESTAL HEAVY CORROSION DUE TO EXCESSIVE SALT WATER INTAKE ON GEARS AND ELECTRICAL COMPONENTS

HEAVY CORROSION ON STRUCTURAL MEMBERS BULLWARK DOOR BRACKET 10 MONTHS AFTER HAUL OUT HEAVY CORROSION ON STRUCTURAL MEMBERS CONSEQUENCE OF SALT WATER ON STRUCTURAL MEMBERS

MULTI-PURPOSE ROOM WINDOW WINDOW NEED TO BE TAKEN OUT DURING HAUL OUT RUST COMPROMISES INTEGRITY OF STRUCTURE OF BOAT

HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO THE AFT PLENUM AFT PLENUM GUIDE RODS CONSEQUENCE OF SALT WATER IN AFT PLENUM COMPONENTS HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO THE AFT PLENUM

AIR INTAKE TO MAIN ENGINE ROOM CONSEQUENCE OF SALT WATER IN AFT PLENUM COMPONENTS HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO THE AFT PLENUM MAIN ENGINE ROOM INTAKES

AIR INTAKE TO MAIN ENGINE ROOM HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO THE AFT PLENUM CONSEQUENCE OF SALT WATER IN AFT PLENUM COMPONENTS

STAINLESS STEEL ROLLING DOOR HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO STAINLESS STEEL ROLLING DOOR IN THE EQUIPMENT ROOM CONSEQUENCE OF SALT WATER IN CRANE HYDRAULIC CONTROLS

CONSEQUENCE OF SALT WATER INSIDE THE FWD AND AFT CAPSTAN

FORWARD PLENUM DIALECTRIC COUPLING HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO FORWARD PLENUM CONSEQUENCE OF SALT WATER SORROUNDING THE ENTIRE FLOOR AREA OF THE FORWARD PLENUM

FORWARD PLENUM AFT SEARCHLIGHT ELECTRICAL RELAY BOX CORRODED RELAYS HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER INTO FORWARD PLENUM ELECTRICAL BOX CONSEQUENCE OF SALT WATER MAKING ITS WAY INSIDE A SECURE ELECTRICAL BOX LOCATED ABOVE THE FLOOR IN THE FORWARD PLENUM THROUGH ELECTRICAL WIRING

RESCUE PLATFORM CONTROLS HEAVY CORROSION DUE TO THE INTAKE OF SALT WATER OLD CONTROLS HYDRAULIC CONTROLS HAD TO BE REPLACED DUE TO EXCESSIVE CORROSION

RESCUE PLATFORM HYD. MOTORS RESCUE PLATFORM OUT OF SERVICE FOR ONE YEAR WAITING ON PARTS HEAVY CORROSION DUE TO EXCESSIVE SALT WATER INTAKE EXPENSIVE REPLACEMENT HYDRAULIC MOTORS HAD TO BE REPLACED DUE TO EXCESSIVE CORROSION

MAST SIREN COMPLETELY CORRODED HEAVY CORROSION DUE TO EXCESSIVE SALT WATER INTAKE

STAINLESS STEEL STACKS PAINTED SEVERAL TIMES DUE TO SALT DEPOSIT FIREBOAT STACKS STAINLESS STEEL STACKS PAINTED SEVERAL TIMES DUE TO SALT DEPOSIT

EXHAUST MUFFLERS AIR EXHAUST FROM ENGINE ROOM HEAVY CORROSION DUE TO EXCESSIVE SALT WATER INTAKE

PORT SIDE PUMP CLUTCH COUPLER LENGTH OF CRACK PORT SIDE PUMP CLUTCH COUPLER