EMC hurricane-NMMB (HNMMB) development plan Targets: 2015 continue development/tests 2016 tests/parallel real-time run 2017 real-time run.

Slides:



Advertisements
Similar presentations
Multi-physics Multi-IC Ensemble Plan for 2012 Hurricane Season Zhan Zhang and Vijay Tallapragada NCEP/EMC HFIP Regional Ensemble Conference Call March.
Advertisements

1 NCEP Operational Regional Hurricane Modeling Strategy for 2014 and beyond Environmental Modeling Center, NCEP/NOAA/NWS, NCWCP, College Park, MD National.
Line Efficiency     Percentage Month Today’s Date
WV Faculty Salaries Proposal. Full Professor WV salaries.
DTC AOP GSI October 1, FY09 Funding Resource/Tasks AFWA (February January 2010): – GSI code management and support (1.1FTE)
VisIt Software Engineering Infrastructure and Release Process LLNL-PRES Lawrence Livermore National Laboratory, P. O. Box 808, Livermore,
Outline Regional Hurricane NMMB Progress
Hurricane forecasts with Regional NMMB: Impact of HWRF Physics Weiguo Wang and Vijay Tallapragada EMC/NCEP/NOAA, College Park, MD Mar
PowerTeacher Gradebook. Introduction The Stamford Public School district acquired the Pearson PowerSchool suite of student information management tools.
Hurricane forecasts with Regional NMMB: Impact of HWRF Physics Weiguo Wang and Vijay Tallapragada EMC/NCEP/NOAA, College Park, MD TCRF/69th IHC Mar.
1 Short term plan to assist 2011 HWRF implementation HFIP Stream 1 Regional Hurricane Model Diagnostics Planning Meeting, 11/08/2010.
EMC’s Offsite Computing Update HPC RAC 05 January 2012.
Tolman, May 7, 2015MAPP Webinar, 1/14 Transition to operations at EMC What works and what does not work Hendrik L. Tolman Director, Environmental Modeling.
Progress Towards a High- Resolution HWRF Samuel Trahan, Vijay Tallapragada (EMC/NCEP/NOAA) S.G. Gopalakrishnan and X. Zhang (HRD/AOML/NOAA)
SKA/KAT SPIN Presentation Software Engineering (!?) Robert Crida.
I.Boulder Community GSI Code Repository II.GSI Regression Test Suite III.GSI Code Release IV.GSI Community Support V.Collaborative Efforts.
Object-Oriented Analysis & Design Subversion. Contents  Configuration management  The repository  Versioning  Tags  Branches  Subversion 2.
NHC Activities, Plans, and Needs HFIP Diagnostics Workshop August 10, 2012 NHC Team: David Zelinsky, James Franklin, Wallace Hogsett, Ed Rappaport, Richard.
DTC HWRF Task AOP2009 & AOP /01/2009 Ligia Bernardet.
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
Tolman, May 13, 2015JCSDA NWS overview, 1/11 JCSDA Activities and Plans NWS overview & plans Hendrik L. Tolman Director, Environmental Modeling Center.
HFIP Regional Ensemble Call Audio = Passcode = Meeting ID: September 2012 – Noon Mountain Time (1800 UTC)
Ligia Bernardet, S. Bao, C. Harrop, D. Stark, T. Brown, and L. Carson Technology Transfer in Tropical Cyclone Numerical Modeling – The Role of the DTC.
Donald Stark National Center for Atmospheric Research (NCAR) The Developmental Testbed Center (DTC) 15 January, 2014 Building the HWRF Components.
Oracle Data Integrator Agents. 8-2 Understanding Agents.
HFIP Regional Ensemble Call Audio = Passcode = 10606# Meeting ID = May 2012.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Transition to SVN server: follow up P.Hristov 24/01/2008.
Anonymous | Secure | User friendly
PDS4 Project Report PDS MC F2F UCLA Dan Crichton November 28,
Developmental Testbed Center: Governance highlights
Summary of G3 work to date
The SCEC CSEP TESTING Center Operations Review
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Jan 2016 Solar Lunar Data.
Colorado Plugfest Planning
Testing Plan Workshop Santa Cruz County BH
ACCESS NWP Version Releases
Analyzing patterns in the phenomena
2017 Safety Group 1 – 5 Year Program Timeline Guide
APPLICATIONS Received by SANTE/F: – MDR 7 – IVDR


North Carolina Piedmont Region Consortium Timeline
Geo units Formation Dates In New Zealand

FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
PBIS Update October 2005.
Harvard University and NASA/GFSC


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Births as per Civil Registration System,
Text for section 1 1 Text for section 2 2 Text for section 3 3
NEMSIS V3.5.0 Timeline developed at NEMSIS Annual Meeting 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
2016 Safety Group 1 – 5 Year Program Timeline Guide
2012 Safety Group 1 – 5 Year Program Timeline Guide
Budget Planning Calendar

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
TEL031 ODL Analytics Main Activities
Presentation transcript:

EMC hurricane-NMMB (HNMMB) development plan Targets: 2015 continue development/tests 2016 tests/parallel real-time run 2017 real-time run

TaskStatusLead/support Personnel NoteStart/Complete date Transition of HWRF physics suite to NMMB DoneWeiguo Lin … Update to 2015 hwrf version Need tests Update by June, 2015 HWRF nest motion algorithm to NMMB ShortlySam Weiguo … With some in-model diagnostic fields June/May to Sep, 2015 HWRF vortex initialization to NMMB almost Done Qingfu Lin… Need testsApril to June 2015 Ocean POM/HYCOM to NMMB ShortlyBin Dmitry Hyun-Sook Regional HycomPOM: April to Oct 2015 HYCOM: planned Ocean couplingShortlyDmitry Bin Zhan progress in nems’s NUOPC is slow. May need a hwrf- like coupler for use in a year April to Sep 2015 HWRF data assimilation PlannedMingjing, Jason Bin, Banglin GSI-EnKF ? Interface/data change April to Sep 2015 Post processing Graphics PlannedLin, Keqin Sam Weiguo.. now OK to use ncep-post,Sep to Oct, 2015 ScriptPlannedSam, Zhan Mingjing,Keqin HWRF-like Python scriptSep to Nov, 2015

Code management All source codes, scripts, utilities and libraries, etc. should be saved at EMC SVN repository ( Development will be conducted in “hnmmb/branches”. We already have a project in EMC SVN site. branches/ tags/ trunk/

Tentative structure of hnmmb/trunk: sorc/ EMCGSI/ vortex_init/ NMMB/ NPS/ nmmb-coupler/ pomtc/ hycom/ gfdl-vortextracker/ post/ util/ lib/ ush/ scripts/ graphics/ regression_tests/ Code management

Test plans Meaningful tests can start once the hwrf nest motion algorithm is ready in NMMB. When DA and ocean coupler not ready, we can insert HWRF vortex in the initial fields as an alternative and test phys and other configurations. Target: Preliminary retrospective tests start in August Real-time demo in Aug (without expectation of DA and ocean) Full system tests are expected to start in Dec. 2015