University of Alabama Formula SAE 2005 ME490 Senior Design Status March 2 nd, 2005
March 2ndME490 Status Report Team Organization Garrett Davis – Clutch/Shifting, Engine Development & Suspension Matt Moody – Team Captain, Business Lead & Drivetrain Matt Stephens – Controls Lead & Engine Cooling Arnar Thors – Engine Development & Body/Composites
March 2ndME490 Status Report Formula SAE Collegiate Design Series Rules & Regulations – Dimensions (60in WB, track restriction) – 20mm Engine Restriction – Safety Req’ts – Time Constraints Benefits – Students – University
March 2ndME490 Status Report Illustration Intake Manifold Differential Carrier Anti-Roll Bars ECU – Engine Control Unit Shocks/Rockers Halfshafts/CV Joints
March 2ndME490 Status Report Accomplishments Engine – Final Intake Manifold Constructed – Exhaust Header Constructed – ECU Wiring Finished – Coolant System Designed/Assembled – Dyno Testing Completed – Fuel Tanks Constructed
March 2ndME490 Status Report Accomplishments Controls – Shifter/Clutch Concept Simplified – Shifter/Clutch Constructed – New Dash Constructed Frame/Body – Side Panels Constructed – Nose Mold in Processing
March 2ndME490 Status Report Accomplishments Drivetrain – Halfshafts Installed – CV Joints Broken
March 2ndME490 Status Report Accomplishments Business – SAE Presentation Award – Cost Report Submitted $19, Vehicle Cost
March 2ndME490 Status Report Accomplishments Area Totals Sub-Total Jig Time Labor for Assembly to VehicleTotal Brake System $ $ - $ $ Engine & Drivetrain 8, , Frame & Body , Instruments & Wiring 1, , Miscellaneous, Fit & Finish Steering System Suspension & Shocks 4, , Wheels & Tires 1, , Total Vehicle $ 18, $ $ $ 19,068.35
March 2ndME490 Status Report Problems General – Vendor Delays Throttle Body Sprockets Steel – Time Constraints Spring Break Other Classes
March 2ndME490 Status Report Future Plans Slack – Anti-Roll Bars (Davis) – Rear Rocker/Mount Refinement (Moody/Davis) Engine – Muffler Installation (Davis) – Wiring Clean-up (Thors) – Tuning/Refinement (Thors) Drivetrain – Differential Carrier Re-Design (Moody)
March 2ndME490 Status Report Future Plans Controls – Shifter/Clutch Refinement (Davis) – Steering Column Support (Moody) Frame/Body – Finalize Nose Mold/Lay Nose (Thors) – Install Body Panels (Thors) – Firewall Construction (Stephens)
March 2ndME490 Status Report Status
March 2ndME490 Status Report Status
March 2ndME490 Status Report Questions? Questions? Comments? Suggestions? Insults?