1 LHCb CALO meeting 4.02.09 Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.

Slides:



Advertisements
Similar presentations
Service Board Production Test Rafael Nobrega LHCb Roma1.
Advertisements

1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ Proposal of the ECAL CW base modification + Anatoli, Michail ( Michail Soldatov.
Local Trigger Control Unit prototype
Motor Control Lab Using Altera Nano FPGA
BTeV RICH HV System. The RICH HV System Power One 24V – 1.2A TNG Matsusada HVPS HPD.
1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
The High Voltage, Monitoring and Control systems of the Hadronic and Electromagnetic calorimeters are essentially slow control based, and therefore are.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
CaRIBOu Hardware Design and Status
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
HV-Splitter for RENO Project S. Stepanyan, 김우영 경북대학교 Y.Kim Sejong University May-2008.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
ERC - Elementary Readout Cell Miguel Ferreira 18 th April 2012
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
SPD Very Front End Electronics Sonia Luengo Enginyeria i Arquitectura La Salle (EALS) Barcelona (SPAIN)
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
ASIC Activities for the PANDA GSI Peter Wieczorek.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
1 Overview of the HCAL LED monitoring PRR note CALO meeting Anatoli Konoplyannikov ABSTRACT In this note the design and integration of the LED.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
Distributed Low Voltage Power Supply System for Front End Electronics of the TRT Detector in ATLAS Experiment E.Banaś a, P.Farthouat b, Z.Hajduk a, B.Kisielewski.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
October 12th 2005 ICALEPCS 2005D.Charlet The SPECS field bus  Global description  Module description Master Slave Mezzanine  Implementation  Link development.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
F. Arteche EMC: Electronics system integration for HEP experiments (Grounding & Shielding)
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
LHCb Outer Tracker Electronics 40MHz Upgrade
Calorimeter Mu2e Development electronics Front-end Review
Analog FE circuitry simulation
DCH FEE 28 chs DCH prototype FEE &
Presentation transcript:

1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification HVSB board block diagram Board consideration Planning of the board development and production CALO HV Status bits for ODIN

2 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] CALO HV Status bits for ODIN Introduction All calorimeter HV systems (ECAL-HCAL, PRS) are based on CW DC – DC convertors. The pumping middle voltages are produced by Agilent power supplies. The HV_LED_DAC boards distribute the 80 V power to ECAL and HCAL CW bases and PRS HV boards equipped with CW convertors are used the 150 V. The current consumption from middle voltage power depends of a HV value. For HV PHYSICS settings expected current consumption is about: 3 mA per channel for PRS ; 0.3 A for one sub-detector side of 100 channels. 0.5 mA per CW base for ECAL; 1.5 A for one sub-detector side of 3008 channels. 0.6 mA per CW base for HCAL; 0.4 A for one sub-detector side of 744 channels. ECAL and HCAL MV power is distributed to a group of CW bases. From 16 to 40 bases in one group are powered by one line. Each power line has the over current protection relay that goes off when a current is over limit and after this the 100 V power supply current is changed on 10 – 35 mA. This estimation shows a needed sensitivity of a current monitoring circuitry that will be produced the HV Status bits for ODIN. In case if a part of the CW bases is OFF or the MV power supply current is high (near the current limit setting) we can set the ODIN status bit to ON (it will mean detector in Bad condition). Design of a simple electronics board for a power supply current measurement and transmission the status bits with needed levels to ODIN is under progress now.

3 HCAL,ECAL,PRS 100 V Power Supplies Rack with CALO MV Agilent Power Supplies 100 V power long distance cables to detectors ODIN LVDS RJ45 cables Sketch of the possible implementation sending status bits to ODIN Barack D3 to Electronics platform New electronics board “HV Status Board” ( HVSB ) HVSB board functionality:  Fast measurement MV power supply currents.  Produce the “warning” LVDS signal (one bit per sub-detector) to the ODIN in case when the power current is out of range.  Board equipped with DAC, comparator and logic IC’s.  The Specs mezzanine will be used for DC levels measurement by DCU-ADC and communication with ECS. SPECS RJ45 cable to control PC in D2 SPECS Mezzanine LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] CALO HV Status bits for ODIN Additional LV power supply for HVSB board

4 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] CALO HV Status bits for ODIN Logic FPGA ACTEL or ALTERA LVDS drivers to ODIN Block diagram of HVSB board SPECS Mezzanine 12 DAC IC’s 6 chan. DCU-ADC ECAL_A MV line ECAL_C MV line HCAL_A MV line HCAL_C MV line PRS_A MV line PRS_C MV line I to V Converter Parallel Bus I2C bus Max levelMin 12 comparators Status Indicators SPECS Bus

5 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] CALO HV Status bits for ODIN Board consideration There is one open question concerning of the power supplies DC decoupling. There are two possibility. First one is connect the ground lines of the MV power supplies together or other one is use an opto-coupling technique for keeping the ground lines separated. In the first case an analog part of the HVSB board is much simple, but some tests will be needed for verifying EMC noise. In the second case an analog part is more complicated and linear optocoupled amplifier can be used. For example a linear Amplifiers the IL300 Optocoupler produced by Vishay Semiconductors could be used for implementation the current to voltage converter. Positive Unipolar Photovoltaic Amplifier Schematic of the linear optocoupled amplifier.

6 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Detector HV Status bits for ODIN HVSB board consideration Mechanical implementation and board powering. Mechanical implementation of the HVSB board could be similar the HV_LED_DAC implementation with simple non standard mechanics. The board will be inserted into the rack with MV Agilent power supplies. The low voltage power supply (Agilent PS) will be placed under the HVSB board in the same rack (see sketch on slide 3). SPECS Mezzanine Logic FPGA Status Indicators Drivers to ODIN Analog Circuits Input/Output MV connectors LV Pwr Specs RJ45 Sketch of the HVSB printed circuit board with main components placement

7 Conclusion & Planning  The possible solution of the CALO sub-detector status bit realization has been presented. The solution is based on the MV power supply current measurement.  Together with Cyril perform an analog part simulation and prototype test of the HVSB board.  Order needed electronic components.  Start a board development using CADENCE software at CERN and LAPP.  Develop firmware for control logic FPGA.  Develop PVSS project for monitoring and control HVSB board.  Develop a DIM server for an additional LV power supply and integrate power control into existing PVSS project. CALO HV Status bits for ODIN LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ]