1/19/2006Frank Lenkszus Advanced Photon Source 1 ILC Timing Frank Lenkszus Controls Group Advanced Photon Source Argonne National Lab.

Slides:



Advertisements
Similar presentations
Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Introductory comments on: “ How will the low level rf systems required for bunch compression, cavity tuning, machine protection, etc. be designed so as.
Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
Synchronization System for LUX John Staples, LBNL 26 July 2004.
RF Synchronisation Issues
DESY MHF-p 1 Layout of the Synchronisation System for the VUV-FEL Dipl. Ing. Henning Christof Weddig DESY Hamburg.
Stefan Simrock 3 rd LC School, Oak Brook, IL, USA, 2008, Radio Frequency Systems 1 Timing and Synchronization S. Simrock and Axel Winter DESY, Hamburg,
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
WP06_AntennaIF. WP06_AntennaIF 3 principal modules switch amplifier (= ATA ‘PAM’) –includes attenuators (0-60 dB), power detector, and bias tee for the.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
RF Synchronization, control and stability Takuya Natsui.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
SJD/TAB1 EVLA Fiber Selection Critical Design Review December 5, 2001.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Volker Schlott SV84, LL-RF Workshop, CERN, October 11 th, 2005 Femto-Second Stable Timing and Synchronization Systems Volker Schlott, PSI Motivation –
Holger Schlarb, DESY Normal conducting cavity for arrival time stabilization.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Sophie BaronTTC1 TTC status February 2005 ATLAS electronics.
R&D Programme for RT Phase Feedback Giulio Morpurgo.
The PITZ Timing System Frank Tonisch DESY - Zeuthen.
R. Akre RF / Timing August 11, 2004 LCLS Drive Laser Timing Stability Measurements Department of Energy Review of the Linac.
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
Injection Locked Oscillators Optoelectronic Applications E. Shumakher, J. Lasri, B. Sheinman, G. Eisenstein, D. Ritter Electrical Engineering Dept. TECHNION.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Femtosecond phase measurement Alexandra Andersson CLIC Beam Instrumentation workshop.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
@ Fermilab ILC bunch-compressor and linac rf requirements Sergei Nagaitsev Fermilab Feb. 9, 2006.
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
High precision phase monitoring Alexandra Andersson, CERN Jonathan Sladen, CERN This work is supported by the Commission of the European Communities under.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
RF Phase Reference Distribution for the European XFEL Krzysztof Czuba Warsaw University of Technology, ISE For the RF Synchronization Team P. Jatczak,
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Possible LLRF Configuration in ILC Sigit Basuki Wibowo LLRF Workshop, Shanghai - Nov 5, 2015.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
Frequency Control through Pulse Width Modulation for NRF Cavities. As example at FLASH RF GUN Sven Pfeiffer for the LLRF team LLRF Workshop 2015 Shanghai,
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
Status of SPARC synchronization system and possible upgrades
RF acceleration and transverse damper systems
LCLS_II High Rep Rate Operation and Femtosecond Timing
LLRF Research and Development at STF-KEK
ILC Phase Reference Distribution R&D
Timing and synchronization at SPARC
RF Synchronisation Issues
WP02 PRR: Master Oscillator and RF Reference Distribution
CEPC RF Power Sources System
LCLS Drive Laser Timing Stability Measurements
LCLS RF Stability Requirements
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Linac Coherent Light Source (LCLS) Low Level RF Status
Breakout Session SC3 – Undulator
Presentation transcript:

1/19/2006Frank Lenkszus Advanced Photon Source 1 ILC Timing Frank Lenkszus Controls Group Advanced Photon Source Argonne National Lab

1/19/2006Frank Lenkszus Advanced Photon Source 2 Timing Functions Master oscillator distribution (1.3 GHz) 5 Hz timing fiducial distribution Programmable triggers for field hardware Mechanism to synchronize software processing to timing events Time fiducials for synchronized timestamps for software and hardware events. Develop pulse ID number to identify pulses within the 1 millisecond pulse train –ID number will accompany data relating to individual pulses

1/19/2006Frank Lenkszus Advanced Photon Source 3 Key Parameters that Influence Timing Bunch Compressor Phase Tolerance 0.03 to 0.1 degrees at 1.3 GHz Inter-linac timing tolerance100 femto-seconds

1/19/2006Frank Lenkszus Advanced Photon Source 4 Timing Global Specifications Timing Phase locked to RF System –Stability at the point of RF measurement and control: ~10 picoseconds –Short Term Stability for Bunch Compressor: ~100 femtoseconds Timing phase reference will be distributed via active phase stabilized redundant fibers in star configuration to sectors –Fiber cable has temperature coefficient: ~10 ppm/  C Timing phase reference to be dual redundant with auto failover –Timing phase reference distribution will use active phase stabilization Phase shifter will be based on fiber in a temperature controlled oven Will build on prior work for NLC and TELSA Local distribution (~500 meters) will be via coax Active phase stabilization scheme Phase averaging scheme 5 Hz timing fiducial will be encoded on timing phase reference by momentary phase shift –Others have used Amplitude Modulation.

1/19/2006Frank Lenkszus Advanced Photon Source 5 Timing Global Specifications (Cont.) Required timing triggers and other frequencies will be developed locally at sector locations from the distributed phase reference Local timing triggers will be developed by counting down phase reference Graded approach to timing trigger generation –High precision: (pico-second) –Medium precision (nano-second) –Low precision (microsecond) (Event System)

1/19/2006Frank Lenkszus Advanced Photon Source 6 Prior Work On Phase Reference Distribution TELSA –“First Generation of Optical Fiber Phase Reference Distribution System for TESLA”, Krzysztof, C., et al, TELSA Report NLC –A High Stability, Low Noise RF Distribution System”, Frisch, J., et al, Proceedings of 2001 PAC, Chicago, pp 816 – 818 –“R&D for the ILC Phase/Timing Distribution System”, Frisch, J. 10/20/04 KEK –KEK (“RF Reference Distribtution Using Fibre-Optic Links for KEKB Accelerator”, Natio, T. et al, PAC2001)

1/19/2006Frank Lenkszus Advanced Photon Source 7 TELSA Reference Distribution Specifications Short Term Stability (phase noise) << 1 ps, (10 fs at XFEL) Short term stability (minutes) < 1 ps at RF frequency ( GHz) Long term stability (days) < 10 ps ( GHz) System Length: up to 15 km Distributed frequencies MHz (Tests done at1.3GHz) High Reliability

1/19/2006Frank Lenkszus Advanced Photon Source 8 TESLA Features Use 1550 nm DFB Laser –Temperature controlled to 25  C Use SMF-28 fiber (Corning) –Loss 4.4 dB for 20 km fiber Phase Shifter –5km fiber inside an oven with 30  C temperature range Compensates for phase changes induced by 10  C temperature change of 15 km link Digital PID controller –Only PI gains used Transmit 1.3 GHz reference

1/19/2006Frank Lenkszus Advanced Photon Source 9 TESLA

1/19/2006Frank Lenkszus Advanced Photon Source 10 TELSA System Performance Integrated system test had problems –Had to reduce PID P gain to make system stable Caused by phase shifter dead-time –Couldn’t run tests for more than hours because of software malfunction Stability –Short Term Stability 0.3 psec –Long Term Stability 2 psec

1/19/2006Frank Lenkszus Advanced Photon Source 11 NLC Requirements Transmission length : 15 km Noise 10 sec to 10 kHz: < 0.12 psec RMS Stability < 1 hour:+/- 1 psec Stability Long Term:+/- 5 psec Temperature Stability:< 2x10 -8 /  C

1/19/2006Frank Lenkszus Advanced Photon Source 12 NLC Prototype Features Use 1550 nm DFB Laser –Laser pulsed at 3125 Hz to avoid interference between forward and reflected power. Use SMF-28 Single-mode fiber 15 km long Phase Shifter –6km fiber inside an oven –Oven continuously cooled by TEC cooler and heated by a wire grid. Prototype operated at 375 MHz carrier RF signals mixed down to 25 kHz IF and digitized at 200 kHz. Phase measured digitally in PC. PID loop implemented in PC to drive phase shifter All RF components and optical components were mounted in a temperature controlled oven. Test output signal filtered with 100 Hz bandwidth VCXO phase locked loop to reduce broadband noise.

1/19/2006Frank Lenkszus Advanced Photon Source 13 NLC Test Setup

1/19/2006Frank Lenkszus Advanced Photon Source 14 NLC Prototype Performance System Phase stability: 10 femtosecond per degree C per kilometer Phase Noise 0.1Hz to 10 kHz: 0.25 psec RMS –Later report of ~0.1 psec Stability < 1 hour:+/ psec Stability Long Term (1 month) :+/- 2 psec –Later report of +/- 1 psec Temperature Stability:< /  C

1/19/2006Frank Lenkszus Advanced Photon Source 15 Variations KEK (“RF Reference Distribtution Using Fibre-Optic Links for KEKB Accelerator”, Natio, T. et al, PAC2001) –Used Phase Stabilized Optical Fiber (PSOF) : 0.4ppm/  C (-10 to 30  C) –Used WDM (1310 (Forward) and 1550 (Reflected) nm to avoid crosstalk Avoids RF chopping –Distributes 509MHz –Temperature stabilized phase shifter Electronically controlled varactor diodes –Phase stability: ~ 2 degrees for 4.8 km PSOF cable

1/19/2006Frank Lenkszus Advanced Photon Source 16 Active Phase Stabilized Link

1/19/2006Frank Lenkszus Advanced Photon Source 17 Redundant Reference Transmission with Failover

1/19/2006Frank Lenkszus Advanced Photon Source 18 Sector Timing Distribution

1/19/2006Frank Lenkszus Advanced Photon Source 19 Sector Timing Controller

1/19/2006Frank Lenkszus Advanced Photon Source 20 Other Frequencies Other generated frequencies will be sync’d to 5 Hz timing fiducial 3.25 MHzInjector (1/ GHz) –Reference: BCD2005 General Parameters: 308 ns Linac Bunch Interval. 6.5 MHzInjector (Low Q option) (1/ GHz) –Reference: BCD2005 General Parameters: 154 ns Linac Bunch Interval 500 MHzDR(5/ GHz) 46.3 kHzElectron (6 km) DR Revolution Clock(500MHz/Harmonic #) kHzPositron (12 km) DR Revolution Clock (500MHz/Harmonic #) 54 MHzMode Locked Lasers (1/ GHz)

1/19/2006Frank Lenkszus Advanced Photon Source 21 Event System Bit serial system sends event codes Synchronous to 5 Hz and sub harmonic of 1.3 GHz Possible events –Start of Bunch Train –5 Hz –MPS Trip –Pulse Tic –Revolution Clock(s) (DRs) –GPS Clock Tick Event Receivers –Generate interrupt to processors to synchronize software processing –Time stamp counter –Low grade timing triggers on occurrence of specified events

1/19/2006Frank Lenkszus Advanced Photon Source 22 Numerology Items that influence flexibility in bunch pattern choice –Ratio of ML to DR RF (1300/500 => 13/5) –DR Harmonic number –Linac bunch spacing (nominal 308 nsec => 3.24 MHz) References that explore the relationships. –“Basic Timing Requirements for TELSA”, Kriens, W. TELSA Report –“Some Timing Aspects for ILC”, Ehrlichmann, H, DESY, Presented at GDE Freascati, December 2005.

1/19/2006Frank Lenkszus Advanced Photon Source 23 Some Timing Issues Fiber oven phase shifters are large and consume significant power (~ 1kW/fiber) Chop RF frequency or not – Avoid Circulator cross-talk –NLC chopped at 3125 Hz –TELSA – cross talk constant so don’t worry about it –KEK used WDM (1300/1500 nm) Bunch Compressor –Required stability at the cavities not demonstrated when transmitted over long distances Local reference distribution –Active Phase Stabilization Can we assume temperature stable enough through ½ sector so phase stabilizer not required for each local node. –Phase Averaging Requires directional couplers at each drop point.

1/19/2006Frank Lenkszus Advanced Photon Source 24 Local (IntraSector Reference Distribution) Reference: Frish, J. “R+D for the ILC Phase/Timing Distribution System”, 10/20/04

1/19/2006Frank Lenkszus Advanced Photon Source 25 Timing Questions Under what conditions should timing cause an MPS trip –Unrecoverable phase distribution error Interfaces/Timing Requirements: –MPS –BDS Timing Requirements for Accelerator Components –Table Number, Range, Resolution, Accuracy, Stability, Jitter –Kickers –Bpms –Laser Wire –Etc Bunch Compressor –Most stringent timing requirement Master Oscillator Specification

1/19/2006Frank Lenkszus Advanced Photon Source 26 Work to be done on Phase Distribution Establish stability/phase noise budget –Master Oscillator –Long haul distribution Bunch Compressor All other –Local (Intra Sector distribution) Prototype phase stabilized link building on NLC/TELSA work Extend prototype to redundant configuration –Develop and test auto failover Investigate options to distribute phase reference to Bunch Compressors

1/19/2006Frank Lenkszus Advanced Photon Source 27 Timing Requirements Gather list of devices requiring timing Develop table DeviceQuantityRangeResolutionJitterStabilityAccuracy

1/19/2006Frank Lenkszus Advanced Photon Source 28 Results of 1/17/2006 FERMI ILC RF and Controls Meeting LLRF LO to be 52 MHz (1.3GHz/25) LLRF ADC sampling frequency MHz (1.3GHz/15) 2% loss in Luminosity is driving Bunch Compressor specs. Bunch compressor (BC) requires a separate rf spec(0.03 deg, 0.08%) Rest of the system: –(+/-)0.5% energy error – brick wall limit! –0.5 deg, 0.5% uncorrelated –0.1 deg, 0.03% correlated For MO/phase reference distribution/reconstruction and no beam (pilot bunch) spec is –+/- 0.5 degrees rms (1 over 15 km over “long” time scale Beam based feedback (from cavity) will be used to stabilize locally distributed phase reference to the beam. Fermilab ILC Beam Test Facility Spec: –Rf specs for three cryomodules (24 cavities) powered by a single Klystron: 0.5%, 0.5 degree rms long term –Timing distribution jitter: 1 ps rms

1/19/2006Frank Lenkszus Advanced Photon Source 29 References “First Generation of Optical Fiber Phase Reference Distribution System for TESLA”, Krzysztof, C., et al, TELSA Report “A High Stability, Low Noise RF Distribution System”, Frisch, J., et al, Proceedings of 2001 PAC, Chicago, pp 816 – 818 “R&D for the ILC Phase/Timing Distribution System”, Frisch, J. 10/20/04 Larsen, R. S., Technical Systems Configurations – Electrical Subsystem: Instrumentation – Timing, Rev. 1, March 23, 2001 “Basic Timing Requirements for TELSA”, Kriens, W. TELSA Report “Some Timing Aspects for ILC”, Ehrlichmann, H, DESY, Presented at GDE Freascati, December 2005.