IceTop DAQ: 1 David Seckel – 8/27/2003, College Park, MD IceTop DAQ David Seckel University of Delaware.

Slides:



Advertisements
Similar presentations
Instrumentation - Results from first season and plan for 2005 A. Karle Iceube Collabration meeting Berkeley March 19, 2005.
Advertisements

Anisotropy in Cosmic Ray Arrival Directions Using IceCube and IceTop Frank McNally ISCRA.
TeVPA, July , SLAC 1 Cosmic rays at the knee and above with IceTop and IceCube Serap Tilav for The IceCube Collaboration South Pole 4 Feb 2009.
SUSY06, June 14th, The IceCube Neutrino Telescope and its capability to search for EHE neutrinos Shigeru Yoshida The Chiba University (for the IceCube.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
IceCube 1400 m 2400 m AMANDA South Pole IceTop Skiway 80 Strings 4800 PMT Instrumented volume: 1 km3 (1 Gt) IceCube is designed to detect neutrinos of.
The IceCube High Energy Telesope The detector elements Expected Sensitivity Project Status Shigeru Yoshida Dept. of Physics CHIBA Univ. ICRC 2003.
Neutrino Astronomy at the South Pole David Boersma UW Madison “New Views of the Universe” Chicago, 10 December 2005.
July 10, 2007 Detection of Askaryan radio pulses produced by cores of air showers. Suruj Seunarine, Amir Javaid, David Seckel, Philip Wahrlich, John Clem.
IceCube System Testing
IceTop Tank Calibration Abstract This report outlines the preliminary method developed to calibrate IceTop tanks using through going single muon signals.
TeV Particle Astrophysics II 600 Down: What’s Up with IceCube? Status and Future of the IceCube Neutrino Observatory Kael Hanson for the IceCube Collaboration.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
July 29, 2004 IceTop DAQ D. Seckel. IceTop Review DAQ July Delaware D. Seckel Outline II = {tasks for InIce DAQ} IT = {tasks for IceTop DAQ} A.
Ground Level Enhancement of May 17, 2012 Observed at South Pole SH21A-2183 Takao Kuwabara 1,3 ; John Bieber 1 ; John Clem 1,3 ; Paul Evenson 1,3 ; Tom.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: “DOM MB to Event Builder”
Greg Sullivan University of Maryland Data Filtering and Software IceCube Collaboration Meeting Monday, March 21, 2005.
First Results from IceCube Physics Motivation Hardware Overview Deployment First Results Conclusions & Future Plans Spencer Klein, LBNL for the IceCube.
ILC Trigger & DAQ Issues - 1 ILC DAQ issues ILC DAQ issues By P. Le Dû
NSF Baseline Review February 10-12, 2004 IceTop Tom Gaisser Bartol Research Inst., Univ. of Delaware Jan 28, 2004T. Gaisser, L3 Lead for IceTop1.
AMANDA and IceCube neutrino telescopes at the South Pole Per Olof Hulth Stockholm University.
IceCube Data Acquisition :: Status Presentation before the IceCube Science Advisory Committee W. R. Edwards / K. Hanson for DAQ Mar 29, 2006 – Madison,
David Seckel, IceTop Status, Mons, Oct. 22, 2003 IceTop: PY2 Bartol Res. Univ. Delaware: Xinhua Bai, John Clem, Paul Evenson, Tom Gaisser, Andrew.
Nov 30, 2003Tom Gaisser The IceTop component of IceCube Perspective from the South Pole.
PMT Output, ATWD input, and Trigger Comparator Input Issues IceCube Note _105 Gerald Przybylski Lawerence Berkeley National Laboratory August 22, 2002.
Preliminary MC study on the GRAND prototype scintillator array Feng Zhaoyang Institute of High Energy Physics, CAS, China GRAND Workshop, Paris, Feb. 015.
Why Neutrino ? High energy photons are absorbed beyond ~ 150Mpc   HE  LE  e - e + HE s are unique to probe HE processes in the vicinity of cosmic.
The Status of IceCube Mark Krasberg University of Wisconsin-Madison RICH 2004 Conference, Playa del Carmen, Mexico Dec 3, 2004.
Erik Blaufuss University of Maryland Data Filtering and Software IceCube Collaboration Meeting Monday, March 21, 2005.
Paul Evenson June CAU Kiel April 20, 2010 Solar Physics with the IceTop Air Shower Array Paul Evenson University of Delaware Department of Physics.
March 02, Shahid Hussain for the ICECUBE collaboration University of Delaware, USA.
1 Cosmic Rays in IceCube: Composition-Sensitive Observables Chihwa Song a, Peter Niessen b, Katherine Rawlins c for the IceCube collaboration a University.
IceCube Software System Design Methodology DAQ S/W Workshop 28 Oct 2002 John Cavin.
DAQ: Status and Plans David Nygren Berkeley Collaboration Meeting March 21, 2005.
Jan 16, 2004Tom Gaisser 1.3 Cost & schedule review The IceTop component of IceCube Area--solid-angle ~ 1/3 km 2 sr (including angular dependence of EAS.
Azriel Goldschmidt AMANDA/IceCube Collaboration Meeting Laguna Beach, CA March 2003 String-18 Progress and Plans.
NSF Baseline Review February 10-12, 2004 IceTop Tom Gaisser Bartol Research Inst., Univ. of Delaware Jan 28, 2004T. Gaisser, L3 Lead for IceTop1.
David Seckel, IceTop Baseline Review, Madison, Dec. 4, 2003 IceTop Baseline Review Dec. 4, Madison WI.
RICE David Seckel, NeSS02, Washington DC, Sept ,/2002 R adio I ce C herenkov E xperiment PI presenter.
IceCube Calibration Overview Kurt Woschnagg University of California, Berkeley MANTS 2009 Berlin, 25 September identical sensors in ultraclean,
IceTop Collaboration Meeting Uppsala, Oct. 9, 2004Tom Gaisser1 IceTop IceTop station 2004 test tanks Calibration Verification 04/05 DOM operation Summary.
5 June 2002DAQ System Engineering Requirements 1 DAQ System Requirements DOM Main Board Engineering Requirements Review David Nygren.
Nov 30, 2003Tom Gaisser The IceTop component of IceCube Perspective from the South Pole.
IceTop DAQ: 1 David Seckel – 8/27/2003, College Park, MD IceTop Data Handler and Triggers David Seckel University of Delaware.
DOM MB Test Results at LBNL Main Board Readiness Status Review LBNL, July 2003 Azriel Goldschmidt.
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
Physical Description of IceTop 3 Nov IceTop Internal Review Madison, November 3-4, 2010 Physical Description of IceTop Paul Evenson, University.
POCC activities AMS02 meeting at KSC October 11 th 2010.
South Pole Astro April 4, 2011 Tom Gaisser1 125 m Cosmic-ray physics with IceCube IceTop is the surface component of IceCube as a three-dimensional cosmic-ray.
Mar 20, 2005 Trigger Configuration (w/P. Toale, S-H. Seo, D. Swarnkar) D. Seckel, Univ. of Delaware.
IceCube DAQ Mtg. 10,28-30 IceCube DAQ: Implementation Plan.
IceTop Design: 1 David Seckel – 3/11/2002 Berkeley, CA IceTop Overview David Seckel IceTop Group University of Delaware.
INSIDE – Update meeting PET DAQ 24 March Refresh from the last meetings Objectives of the PET DAQ – Provide a full in-beam (full-beam) PET system.
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
1 Cosmic Ray Physics with IceTop and IceCube Serap Tilav University of Delaware for The IceCube Collaboration ISVHECRI2010 June 28 - July 2, 2010 Fermilab.
Bergische Universität Wuppertal Jan Auffenberg et al. Rome, Arena ARENA 2008 A radio air shower detector to extend IceCube ● Three component air.
7/1/2016IEEE RT 2009 Beijing A Topological Muon Trigger for IceCube Christian Bohm, Sebastian Euler 1, Per-Olof Hulth, Hossein Kavianipour, David Nygren.
IceTop Status: 1 David Seckel – 3/30/2003 Laguna Beach Berkeley, CA Status of IceTop: 3.2 Bartol Res. Univ. Delaware: Tom Gaisser, Xinhua Bai,
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
The dynamic range extension system for the LHAASO-WCDA experiment
DAQ Requirements M. Villa 21/02/2011.
Doug Cowen/High-Level Analysis Preparation/SAC Meeting
Baby-Mind SiPM Front End Electronics
completed in austral season South Pole completed in austral season.
IceCube System Testing
T. Gaisser, L3 Lead for IceTop
IceCube: Neutrino telescope & cosmic-ray detector
Results on the Spectrum and Composition of Cosmic Rays
String-21 Flasher Analysis
Presentation transcript:

IceTop DAQ: 1 David Seckel – 8/27/2003, College Park, MD IceTop DAQ David Seckel University of Delaware

IceTop DAQ: 2 David Seckel – 8/27/2003, College Park, MD IceTop DAQ description Collect IceTop data using DOM/DOM Hub architecture Provide Science Data –Buffer data for inclusion in events –Provide trigger for showers - E s > 300 TeV –Provide trigger for horizontal showers - E s > 100 PeV (?) “Standard” IceCube functions (rapcal, monitoring…) Interface to IceCube DAQ

IceTop DAQ: 3 David Seckel – 8/27/2003, College Park, MD IceTop DAQ components IceTop Data Handler IceTop Data Handler HG Chan LG Chan. Tank 1 LG Chan HG Chan Tank 2 Station 1 Station 2 Station 80 DOM Hubs (10) IceTop Data Handler (SP) Vert. Sh. Trigger Global Trigger InIce DATA InIce Trig.Gen. On line ICETOP DAQ Hor. Sh. Trigger Common Event Builder DAQ Control Monitoring DOMs (320) 100 kB/s 32 MB/s 10 Hz

IceTop DAQ: 4 David Seckel – 8/27/2003, College Park, MD Software Configuration Items IceTop FPGA application DOM mainboard application DOM-Hub application IceTop post-hub processes –IceTop Data Handler –Shower Trigger –Horizontal Shower Trigger

IceTop DAQ: 5 David Seckel – 8/27/2003, College Park, MD Requirements I Science –Station hits – both tanks –Tank hits – muon like –Timing accuracy (10 ns) –Dynamic Range PE Calibration (HG&LG) –Single PE –Flasher –Muon peak & Shower Threshold –HG/LG overlapping dynamic range –Pedestal

IceTop DAQ: 6 David Seckel – 8/27/2003, College Park, MD Requirements II Data Handling –IceTop buffered data (32 MB/s, 1 min 2 GB) –Orderly Progression of IceTop Data (critical availibility ?) Triggering –IceTop shower trigger (10 Hz) –IceTop horizontal shower trigger (<< 1 Hz) Constraints –IceTop DOM – DOM Hub communication bandwidth (100 KB/s/DOM) –Redundancy (reconfigure HG LG) Interface –Monitoring data –IceTop DAQ configuration –IceTop DAQ control