MN Transmission for Renewable Energy Standard NM SPG Update 4/3/07.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

(One) Utility IRP Planners Perspective Phillip Popoff Manager, Integrated Resource Planning Puget Sound Energy June 22, 2010.
IBM Corporate Environmental Affairs and Product Safety
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Wind Energy and Transmission South Dakota Legislative Briefing Pierre, South Dakota January 18, 2006 Beth Soholt Director Wind on the Wires.
EDDIE TERRILL AIR QUALITY DIVISION DEPT. OF ENVIRONMENTAL QUALITY AUGUST 21, 2014 EPA’s 111(d) Clean Power Plan Rule: A DEQ Perspective.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
Expanding and Modernizing the Electrical Grid: Essential Infrastructure for the Midwest’s Clean Energy Future Des Moines Public Library Des Moines, IowaOctober.
EirGrid Customer Conference 2009 October 13, 2009 Dublin, Ireland Session 2: Key Industry Challenges “If you love wind, you have to at least like transmission”
Minnesota’s Better Energy Future Mike Bull, Assistant Commissioner, Renewable Energy The Next Generation Energy Initiative.
Sustaining Community Based Programs CYFAR Conference Boston, 2005.
IS&T Project Management: How to Engage the Customer September 27, 2005.
2011 SIGnetwork Regional Meetings Guidance in Structuring a Communities of Practice.
May 22-23, 2008 ACC BTA Workshop May 22-23, 2008 Regional Renewable Energy Transmission Initiatives Laurie Woodall K.R. Saline and Associates, PLC Arizona.
Remarks of Ron Binz, Public Policy Consulting Senior Policy Advisor, Center for the New Energy Economy July 26, 2012 PV, CSP, DG and FIT; CO2, IOU, TOU.
Dispatches from the Front: The Colorado Clean Air-Clean Jobs Act Platts 5 th Annual Rockies Gas and Oil Conference Ron Binz Public Policy Consulting April.
CapX 2020 Transmission Initiative Progress Through An Alliance Approach American Public Power Association E & O Technical Conference Atlanta, Georgia April.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Oregon Renewable Energy Action Plan April 2005 with Geothermal Energy highlights by Carel DeWinkel Senior Policy Analyst.
1. Unmanned Aircraft Systems (UAS) Webinar presentation January 2014 Transport Canada Ron Carter (Chief, Standards) Department of Transportation James.
1 1 CURRENT ENERGY POLICY CHALLENGES. THE 2030 ENERGY AND CLIMATE FRAMEWORK DG Energy, European Commission.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
CHEN is an emerging trade association dedicated to sustainable rural economies through community-based energy development. We are a non-profit organization.
High Plains Express Initiative Jerry Vaninetti, Vice President Trans-Elect Development Company, LLC Arizona Corporation Commission Fifth Biennial Transmission.
Protecting Communities Co-Chairs Cathy Pratt- City of St. Peters Greg Ford- Williams Gas Pipeline;INGAA.
Project Life Cycle.
Market Implementation Board Presentation July – v1.1F 1 Texas Nodal Market Implementation ERCOT Board of Directors Meeting Program.
R / I Workshop Agenda Introductions and housekeeping1:00pm Objectives and scope1:10pm Background  Public Utilities Code :15pm.
Establishing a Humanitarian Response Depot
Statewide Health Improvement Program (SHIP) Minnesota Department of Health Cara McNulty, MS SHIP Manager
1 Chair’s Report on the 2011 Annual Plan Priorities Dan Tonsmeire May 18, 2011.
Iowa State University Ames, IA July 5, 2011 Wind on the Wires – Wind and Transmission Issues Beth Soholt Wind on the Wires
Update On Mississippi River Delta Management Plan Presented at August 20, 2009, Meeting of Governor’s Advisory Commission on Coastal Protection, Restoration.
Evaluating and Enhancing Lake Michigan Nearshore Monitoring John Hummer and Guan Wang Great Lakes Commission Summer Webinar July 24, 2013.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
Updated 1/28/2011.
R E T I Coordinating Committee California’s Renewable Energy Transmission Initiative: Status Update California Public Utilities Commission California Energy.
CALIFORNIA ENERGY COMMISSION California Bioenergy Action Plan Southern California Emerging Waste Technologies Forum Los Angeles, California July 27, 2006.
What do we mean by “Energy?
1 This project is co-financed by the European Union STATUS OF RENEWABLE ENERGY IN THE MEDITERRANEAN AND CURRENT CHALLENGES; MedReg Perspective By Prof.
Grid Modernization in Minnesota Presentation for More Than Smart Webinar Chris Villarreal Minnesota Public Utilities Commission August 4,
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
CCCB Evaluation Toolkit: Overview and Update on Progress Angela Moore, MPH 2009 NCCCP & NPCR Collaborative Meeting April 16, 2009.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation ERCOT Board Of Directors – August 15, 2006 TPTF Meeting August.
Stakeholder Event 19 March 2015 SCOTT MARKWICK Tel: Mob:
Progress on CAADP Implementation CAADP Stakeholders Seminar 20 October 2011 Pretoria, South Africa. NEPAD Planning and Coordinating Agency.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
COMPREHENSIVE SYSTEM OF PERSONNEL DEVELOPMENT Roger Berman, SETRC Supervisor Denise Jaffe, SETRC Trainer Alison Telsey, SETRC Trainer.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
Demand-side Management (DSM) as a Resource Midwest Energy Policy Conference October 2015 Bill Grant, Deputy Commissioner Division of Energy Resources.
Development of the Vermont Health Information Technology Plan November 1, 2006 Vermont Information Technology Leaders.
May 3, 2016 Presented by: Jamila Piracci, Vice President, OTC Derivatives Alessandra Riccardi, Director of Capital and Risk NFA Webinar: Margin Model Approval.
Siting Updates and the CEQ Meeting March 18, 2013 Linda Davis Western Governors’ Association.
Commission Chairperson Phil Montgomery Presentation to Alaska Delegation September 5, 2014 Integrating Wisconsin’s Grid: an Energy Policy Perspective Public.
2/10/05 California Integrated Waste Management Board1 Consideration Of A Report to the Legislature: Plastic Trash Bag Program And A Comprehensive Approach.
Eric Peirano, Ph.D., TECHNOFI, COO
Eric Peirano, Ph.D., TECHNOFI, COO
SACREEE FOR MARKET-BASED ADOPTION OF RENEWABLE ENERGY AND ENERGY EFFICIENCY SADC Renewable Energy Entrepreneurship Support Facility Workshop 27 April.
Transmission Development Where do we go from here?
Beth Soholt Director Wind on the Wires
Presentation transcript:

MN Transmission for Renewable Energy Standard NM SPG Update 4/3/07

Issue In 2007, the MN Legislature passed, and the Governor signed legislation regarding “Transmission for Renewable Energy Standard”. 216B.1691

Key Components of RES Transmission Legislation Study and develop plans for transmission network enhancement to support RES standards and milestones. Incorporate and build upon past studies (Wind Integration). Collaborate with MISO. Convene and regularly consult with stakeholders (transmission planners, renewable generation technology experts) to review study methods, assumptions, results and ongoing efforts. Submit a report to PUC on status of efforts by 11/01/07.

Report Requirements Description of analysis undertaken and results, including critical issues that need to be addressed in order to meet RES and milestones. Comprehensive conceptual plan (Roadmap) to going planning efforts to meet RES and milestones. Specific transmission line proposals necessary to meet RES and milestones. Description of how the RES transmission projects are incorporated into the Biennial Plan.

Report Requirements Cont’d Five-year action plan that identifies specific actions that are –Necessary to implement the specific proposals –Refine and further develop transmission plans Includes initiating CON or other regulatory proceedings

Milestones Utilities –201212% –201617% –202020% –202525% Xcel –201015% –201218% –201625% –202030%