18.03.2004 SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.

Slides:



Advertisements
Similar presentations
Status of EC-C assembly at Liverpool C Buttar EC PAR, Nikhef Nov 04.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
IBL IST G&S Integration Ned Spencer, UCSC July 15, /15/11IBL IST G&S Integration1.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
ITS TGeo geometry Status and challenges By Bjørn S. Nilsen The Ohio State University.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Vertex2002, Kailua-Kona, HI 11/07/02 B. Quinn1 Carbon Fiber Grounding Issues in the DØ Run IIb Silicon Detector Design Breese Quinn Marvin Johnson, Mike.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
S Temple CLRC1 End-cap Mechanics FDR Cooling Structures Steve Temple, RAL 1 November 2001.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
The SPD geometry in AliRoot Alberto Pulvirenti University & INFN Catania In collaboration with: Domenico Elia (INFN Bari) Outline:  Implementation  Volumes.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
High Power Dumps – RDR 10 atm. Cylinder water vessel with copper plate back end, 1.5m diameter x 6.5m long, in a 15 x 3 x 4 m^3 shielded enclosure, with.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
ATLAS SCT End-Cap C Integration 1.Introduction: to the SCT within ATLAS 2.End-Cap C Reception at CERN 3.Final Assembly 4.Integration with the TRT 5.Combined.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
Mario Sitta 1 CERN – Mon. 7 Jul., 2008 Status of ITS v11Hybrid geometry Mario Sitta Univ. Piemonte Orient. & INFN Alessandria.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Mon. 20 October 2003 SO/EUS Proto-consortium Meeting Mechanical Design Dr Douglas Griffin 1 Solar Orbiter Extreme Ultaviolet Spectrometer Conceptual Mechanical.
13 January 2004V. Manzari - Quark Matter Oakland1 The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the.
Marcello Lunardon - ALICE Gluing Meeting 010/03/2003 Study of glues for the assembly of the ALICE Silicon Pixel Detectors Status at The PADOVA.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
. Si upgrade workshop, 9 June Hubert van Hecke Si Upgrade - Mechanics Review of Hytec study Mounting scheme Services.
FP420 R&D Project – Brainstorming session on mechanics 28 March 06 1 D. D. INFN To/CERN PH CMM FP420 Integration Environment.
Thermal Screen Grounding CERN - Dec. 10 th, 2003 Enzo Carrone The thermal screen grounding and the tracker: a scary concert Enzo Carrone.
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
ITS week CERNR. Dima ALICE SPD, INFN-PD Assembling the complete stave on the Carbon Fiber Sector Support.
D. Greenfield CLRC1 End-cap Mechanics FDR Baseline Design Overview Debbie Greenfield, RAL 1 November 2001.
Stave Core Electrical Considerations Ned Spencer (UCSC), Sergio Diez (DESY), David Lynn (BNL) Local Support Assembly, AUW Nov
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
1 CERN - 19/03/2016 Claudio Bortolin CLAUDIO BORTOLIN INFN – PD / CERN.
Low Mass Alice Pixel Bus Rui de Oliveira TE/MPE/EM 6/9/20161Rui de Oliveira Alice worshop.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Thermal jumble! (Action list review) C. Marinas IFIC-Valencia DEPFET-Valencia 1 Valencia
T-THERMO-MECHANICAL MODEL FOR THE LC FORWARD TRACKER Ciemat, October 27 th, FPA2013ILC workshop D. Moya, I. Vila, Instituto de Física de Cantabria (CSIC-UC.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
SPS High Energy LSS5 Thermal contact & cooling aspects
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EC: 7 DISK concept Preliminary considerations
Update of MVD services and requests
End-cap Mechanics FDR Overview of the Project
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Hybrid Pixel R&D and Interconnect Technologies
? ENDCAP: Mechanics IFIC-Valencia.
Installation step 4. (3 days)
C.Clerc ILD session, ALCPG /03/2010
ALICE PD group meeting Andrea Francescon.
Requirements of the support mechanics
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
Hybrid Mechanical/Thermal Design ideas
Presentation transcript:

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical screening of the carbon fiber support structures (CFSS and ES) for the SPD. Considering the tests results of the D0 vertex detector (Grounding and shielding Techniques for Large Scale Experiments; M. Johnson Fermilab; M. Quinn talk at the Vertex02 conference: Carbon Fiber Grounding Issues in the DØ Run IIb Silicon Detector Design. We made some tests on a small sample of CFSS evaporating a thin aluminum film to short circuit the carbon fibres embedded in the epoxy resin and than we tested at different frequencies the same D0 results. Then we need an electricall screening for: CFSSESBeam Pipe?

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 2 CFSS: we suppose to sputter a thin film (T h =0.15  m) of Titanium (other solutions: Aluminum, Copper, Silver but..) with a rectangular shape of 20x50 mm to short circuit all carbon fibres. Screening surfaces Suggested solutions: The electrical connections is done by means of metallic washers crimped onto the CFSS. A thin copper foil will connect the CFSS to the ES obtaining two grounding connections/CFSS. External Screen (ES): we suppose to sputter a thin film of aluminum (T h =0.15  m) all over the internal skin of the cylinder. This was already foreseen for the thermal decoupling of the ES to the SDD. Mechanical connections of the copper foils is also provided at the CFSS fixation points. A global grounding line is then routed through the services cones to the service patch panels where we suppose to have the general grounding of the different parts. Beam Pipe (BP): we have to define if the BP protection against liquid drops could be used also for an electrical screening (if we assume it is needed).

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 3 The complete Military Standard Codes for Composites is available, The evaporation of the aluminum film was performed in the LNL with a small sample of the CFSS (the evaporation vessel does not fit with the SPD CFSS dimensions. The evaporation tests and the final treatments on the CFSS will be done at CERN (MME TS group – S. Calatroni): They should deliver the piece mid April 04). Their sputtering unit can also fit with the cylinder dimensions, while not for the external cones (it is not needed for the grounding of the system). Beam Pipe screening : possible solution A cylinder gloove made by a carbon fibre tissue (min. 60 mm thick) cocured to a Kapton foil of about 25 mm thick. Material budget problems?

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 4 RB24 and RB26 Harness.

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 5 Movable service channels RB24 side

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 6 Transveral section of the SPD ten sectors at the CFSS endcaps.

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 7 Service RB24 Capillar tubes CuNi 1.5/1.8 mm Optical fibers: 18 fibers/sector LV cables MCM & bus lines

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 8

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 9 Assembly sequence: MCM cables (1) Bus cables (2) Cooling line (C4F10) (3) Air ducts (two ducts) (4) Optical fibers.(5) RB26 side: service patch panels

SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 10 Services dimensions at RB26.