1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.

Slides:



Advertisements
Similar presentations
TEN-T support for Port projects under 2012 Annual Call INFO DAY 2012: Ports (AP) Jose Anselmo, DG MOVE Morten Jensen, TEN-T Executive Agency Brussels,
Advertisements

Fired And Unfired Pressure Vessels
Alternative energy for shipping in Nordic waters
PROYECTO NEREIDAS VISIÓN EUROPEA DE LOS PROYECTOS TEN-T ALEXIO PICCO – CIRCLE Malaga 03/04/2014.
Conversion to LNG Challenges and Opportunities for Washington State Ferries David Moseley WSDOT Assistant Secretary, Ferries Division Royal Norwegian Embassy.
Line Efficiency     Percentage Month Today’s Date
Facilitating trade growth and optimising operations at Port Hedland.
Eidesvik Offshore ASA - Kjell M Sandaker Experiences with Gas and Fuel Cells in ship machinery Incentra – rådsmøte, Haugesund – 2011.
Transport Financing TEN-T maritime projects with EU innovative instruments State of Play for Connecting Europe Facility and Juncker Plan Matthieu Bertrand,
Safety Standards for LNG Fueled Vessels Marine Chemist Qualification Board Baltimore, MD October 23, 2014 CAPT John W. Mauger Office of Design & Engineering.
1 LNG-REFIT “EIGER – NORDWAND” Ad Schroot, LNG in de binnenvaart en milieu Co-financed by European Union Trans-European Transport Network (TEN-T) Ad Schroot.
Transport Henrik Drake "Ports and Inland Navigation" European Commission, DG Mobility and Transport (DG MOVE ) Common Issues Meeting on RIS Zagreb, 13.
Opportunities for EU companies in South East Asia
Conversion to LNG Challenges and Opportunities for Washington State Ferries David Moseley WSDOT Assistant Secretary, Ferries Division Royal Norwegian Embassy.
LNG carriers and bunkering vessels
February 2016 CMAL Project Updates Uig triangle 1 New Dual Fuel Ferry.
Support to the Ministry of Education of the Republic of Azerbaijan for Further Adherence of the Higher Education System to the European Higher Education.
Deployment timelines LHCb CMS ATLAS 2007 Dec Nov Oct Sep Aug Jul Jun
Double walled High pressure fuel pipes
Jan 2016 Solar Lunar Data.
LNG fueled Ships, Considerations & Perspectives
IT Strategy Roadmap Template
Monthly Report For January 2017
Small methanol engines
PIANC SMART RIVERS 2017, Pittsburgh
Evgeniy Dolgikh A year of massive commissioning of LNG powered vessels and LNG bunkering facilities 24 November 2017, St. Petersburg.
Q1 Jan Feb Mar ENTER TEXT HERE Notes
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall


Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Thailand Inland Water Transport System

Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
Jan Sun Mon Tue Wed Thu Fri Sat
Electricity Cost and Use – FY 2016 and FY 2017
Center for Vision (CVN) on Block 33 Move Planning & Logistics Timeline

Safety Group Program Timeline
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE

Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Objective - To make a line graph.
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
Safety Group Program Timeline
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline

2013 Safety Group Advantage Program Timeline
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Bas Kelderman (EICB) L’innovation pour «verdir» le transport fluvial
Change Management E2E Roadmap
Presentation transcript:

1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

o Privately owned company o Founded in 1982 o Headquarters in Sliedrecht o Branch offices : o Sliedrecht (NL) o Antwerp (B) o Brussels (B) o Basel (CH) o Strasbourg (F) o Ottmarsheim (F) o Lille (F) o Number of employees : 140 o Danser owned vessels: 4 o Danser chartered vessels: 60 o Transported in 2013: > 1,0 million TEU Company profile 2 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

Operating Area 3 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

“ Eiger-Nordwand” Built 2000 Overall lenght177 meter Width11,45 meter Draft2,56 meter Tonnage5300 tonnes Capacity (4 layers) 348 TEU Engines 2x 900 kW Vessel particulars 1st LNG Refit on Inland Vessel 4 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

Project Targets Meet customer demand; green transportation Meet upcoming legislation by ports and governments Meet Danser Group strategy: Frontrunner in clean & safe transportation Emission meeting (expected) CCR4 requirements Pilot for LNG refit on 4 more container vessels How: Installation Dual-Fuel propulsion system (Wärtsilä Engine, Tank/ Coldbox) Increased performance; fully redundant Safety leading parameter in overall design 5 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

REFIT Arrangement Proven design of all major components, based on multiple years of experience Dual-Fuel Engine: automatic switch over to gasoil in case of failure/ alarm Dual-Fuel Engine: designed for LNG as main fuel (minimum 95%) Dual-Fuel Engine with a/o double wall piping; gas safe Machinery Room ! Gas detection and auto shut down of main LNG valve Double redundant ventilation Trained crew & management 6 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

Project Summery Feb 2012 Jun 2012 July 2012 Dec 2012 Feb 2013 Mar 2013 Aug 2013 Sept 2013 Oct 2013 Feb 2014 Apr 2014 Jun 2014 Jul 2014 Start project, initial discussions Conceptual design by project team Presentation to LRoS Introduction to Ministery of Infrastructure (IL&T, I&M) Submission call for TEN-T project Start detailed design Presentation at ADN meeting in Geneve Presentation at CCR meeting in Strasbourg HAZID study by LROS Recommendation of CCR is recieved Start refit Tests, commissioning & trials Refitted ship started its normal operations 7 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

Reflecting current operations Between 20-25% reduction on fuel costs 95-99% LNG Building up confidence of crew on “working with” – “sailing on” LNG Less noise generation Bunkering time reduced to 3 hours 8 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa

THANK YOU QUESTIONS ? 9 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa