LNG carriers and bunkering vessels

Slides:



Advertisements
Similar presentations
MARINE ENGINEERING SERVICES PRESENTATION
Advertisements

INTERTANKO,ATHENS 13th April
Tehnologija transporta tekućih tereta Liquid Cargo Handling Technology Sem: V (Year: 3rd) Literature ISGOTT – International.
Alternative energy for shipping in Nordic waters
Transport Systems Ships.
Kvaerner Masa-Yards Copyright of Kvaerner Masa-Yards Inc. Finland, whose property this document remains. No part thereof may be disclosed, copied, duplicated.
SHIP PROPULSION.
KUIPERS SHIPBUILDING B.V. NEW TECHNOLOGY PORTS AND TERMINALS KUIPERS SHIPBUILDING B.V. VISION: CREATE LOGISTICS ALTERNATIVES. ECONOMICALLY AND ENVIRONMENTALLY.
United States Coast Guard Marine Safety, Security, and Stewardship Applying Industry Standards to LNG Marine Fuel Systems Applying Industry Standards to.
Conversion to LNG Challenges and Opportunities for Washington State Ferries David Moseley WSDOT Assistant Secretary, Ferries Division Royal Norwegian Embassy.
SMALL SCALE LNG PROSPECTS
Eidesvik Offshore ASA - Kjell M Sandaker Experiences with Gas and Fuel Cells in ship machinery Incentra – rådsmøte, Haugesund – 2011.
Gas Transmission Pipelines
A Study on Future Multipurpose Vessel for the Northern Baltic Sea Golam Mortuja LAIVA 2025 Espoo.
Liquefied Natural Gas Fuel tank
Steam Power Plant.
WAVESPEC Limited A Braemar Seascope Plc. Group Company October 2005 Factors involved in selecting a propulsion system for your LNG shipping project Presentation.
Langley Meek Commercial Development, GDF SUEZ Gas NA NAMEPA “Fast Forward Into the Future of Maritime” February 18, 2015 The Future of LNG as Fuel 1.
The WA105 17m3 LArCryostat pre-experience M.Ne. Status Tender done for the membrane part, 1 German firm selected A lot of time wasted to renegotiate the.
Ship-Type Operations UNITAS ISM Code Training Material.
Ship-Type Operations UNITAS ISM Code Training Material.
Safety Standards for LNG Fueled Vessels Marine Chemist Qualification Board Baltimore, MD October 23, 2014 CAPT John W. Mauger Office of Design & Engineering.
1 LNG-REFIT “EIGER – NORDWAND” Ad Schroot, LNG in de binnenvaart en milieu Co-financed by European Union Trans-European Transport Network (TEN-T) Ad Schroot.
C F MACHINERY Trade & Services – Import & Export Steel Welded Pipes and Shapes.
LNG Hazards.
Study on future fuels for cargo vessels in the Baltic Sea
LNG Technology.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
SMS 105 – BV Rules.
Environment and Reduction of Emissions The Application in Ships
LNG systems for natural gas propelled ships Jaroslaw Polinski, Maciej Chorowski, Pawel Duda, Janusz Skrzypacz Wrocław University of Technology, Poland.
SELECTING THE BEST FOR SUPPLYING FROM WEST. Who we are TRANS ARK GROUP Trans Ark Procurement Design Service Training Offshore Expert Bureau Consulting.
Attracting Green Ships May About RightShip The Current Environment The Existing Vessel Design Index Accuracy of data Factoring in relative CO 2.
special training requirements for personnel on certain types of ships
23 rd World Gas Conference 5 – 9 June 2006 Amsterdam Full Scale Qualification Trials and Certification of the AMPLITUDE-LNG LOADING SYSTEM Phillip COX.
GL – Your competitive edge Take the lead through innovation Fuel Cells in maritime Applications - Challanges, Chances and Experiences
NON SEA WATER BALLAST BUNKER TANKER INVENTED & DESIGNED BY XED
EUROPEAN DRY CARGO SHIPPING TRENDS. Personal Introduction Jonathan Challacombe FICS CMILT MNI DMS PgCertLTHE Associate Professor in Maritime Studies and.
Conversion to LNG Challenges and Opportunities for Washington State Ferries David Moseley WSDOT Assistant Secretary, Ferries Division Royal Norwegian Embassy.
RISK, QUALITY AND RELIABILITY – RQR ‘07
Comprehensive Evaluations of LNG Transfer Technology for Offshore LNG Development.
1 LNG REFIT “EIGER – NORDWAND” Ben Maelissa, 25 September 2014 Co-financed by European Union Trans-European Transport Network (TEN-T) Ben Maelissa.
23. November 2015 – Skibsteknisk Selskab
DESIGN & DETAILED ENGINEERING CONSULTANT
On our way to become Scandinavia’s preferred LNG supplier Gass- og energiteknologi ,000 ton/år – Risavika, Sola – byggeprosjekt, transport & marked.
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Lesson Two Ship Design. Contents Design essentials Design Procedure advances factors concepts requirements Detailed operation.
February 2016 CMAL Project Updates Uig triangle 1 New Dual Fuel Ferry.
UNI EN ISO ALBA GROUP is an organized company, which is now able to carry out the whole production process to manufacture turnkey systems, equipment.
1 Short Sea Shipping Focal points meeting Brussels Arnaud Leroy Senior Project Officer.
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
CEN/TC 282 Installation and equipment for LNG
Double walled High pressure fuel pipes
LNG fueled Ships, Considerations & Perspectives
MEDITERRANEA DI NAVIGAZIONE SPA
Low temperature chiller Market Survey
Evgeniy Dolgikh A year of massive commissioning of LNG powered vessels and LNG bunkering facilities 24 November 2017, St. Petersburg.
EXCALIBUR 4500 m3 Ethylene Carrier
The Engine Perspective
Black Shark DWT at 98%m3 Bitumen/Asphalt/Pitch Carrier
Tehnologija transporta tekućih tereta Liquid Cargo Handling Technology Sem: V (Year: 3rd) Literature ISGOTT – International.
ABB in Marine Industry A short introduction
MEDITERRANEA DI NAVIGAZIONE SPA
KING ARTHUR 4500 m3 Ethylene Carrier 02/12/2018.
M/t COSMO 4 February 2019.
Firefighting equipment
FISKERSTRAND HOLDING AS
Chart Ferox, a.s. Děčín LNG Terminal Hamburg.
Gas Transmission Pipelines
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

LNG carriers and bunkering vessels Marco La Valle ConferenzaGNL - ROMA 11/06/2015 LNG carriers and bunkering vessels M.E.S. MARINE ENGINEERING SERVICES

M.E.S. – Marine Engineering Services S.r.l. Introduction INTRODUCTION ESTABLISHMENT 1986 SPECIALIZED Gas Carriers Chemical Tankers Bitumen Carriers MARKET Italy Turkey Vietnam China Korea Indonesia Poland The Netherlands Finland M.E.S. – Marine Engineering Services S.r.l. Established on 1986 by Ing Giorgio La Valle (40 years experience in gas carriers design) Specialized in gas carriers, chemical tankers and bitumen carriers About 100 ships built with MES design Market: worldwide Headquarters: Trieste (Italy) 2

COMPANY PROFILE See VIDEO See some Picture Head Office – TRIESTE Trieste (ITALY) 500 m2 Abt. 30 workstations COMPANY PROFILE See VIDEO See some Picture Head Office – TRIESTE 500 m2 – abt. 30 workstations

SURVEY DURING SHIP CONSTRUCTION CONSULTANCY SPECIALISTIC CALCULATIONS Activity ACTIVITY ACTIVITY Design: Concept Design Basic Design Detailed Engineering Specialistic Calculation Survey: On-site (up to 18 surveyors at full capacity) ACTIVITY DESIGN SURVEY DURING SHIP CONSTRUCTION CONSULTANCY SPECIALISTIC CALCULATIONS LOADING COMPUTER OTHERS…

10 x 25000 dwt – AVIC DINGHENG SHIPYARD Activity ACTIVITY ACTIVITY Design: Concept Design Basic Design Detailed Engineering Specialistic Calculation Survey: On-site (up to 18 surveyors at full capacity) ACTIVITY 10 x 25000 dwt – AVIC DINGHENG SHIPYARD 5

2 x 19800 dwt – NINGBO XINLE SHIPYARD Activity ACTIVITY ACTIVITY Design: Concept Design Basic Design Detailed Engineering Specialistic Calculation Survey: On-site (up to 18 surveyors at full capacity) ACTIVITY 2 x 19800 dwt – NINGBO XINLE SHIPYARD 6

KEY POINTS HIGH PERFORMANCES QUALITY CONTINUOUS FEEDBACK EXPERIENCE 7 speed-power ratio (low consumptions, up to 25÷30%less than competitors) main dimensions optimization (reduce total ship cost) QUALITY Drawings / Documentation Details Support / Assistance ISO9001 CONTINUOUS FEEDBACK Production (Shipyard) Production (Survey activity) During ship’s life (Shipowners) G&H production Assistance for equipment tenders (Shipyard/Shipowner) EXPERIENCE 40 years in ship design Gas carriers Management Survey Innovation 7

see the complete REFERENCE LIST on our web page: Products PRODUCTS PRODUCTS Gas carriers Chemical tankers Bitumen carriers Ro-Ro Ferry Various PRODUCTS see the complete REFERENCE LIST on our web page: www.mes.it Chemical tankers: from 5500 dwt up to 40000 dwt Gas carriers: from 2500 cbm up to 12000 cbm 40000 cbm Bitumen carriers: from 6000 dwt up to 7000 dwt LNG bunkering vessels 8

Gas carriers: Bunkering vessels: PRODUCTS 2500 cbm ÷ 12000 cbm Chemical tankers Bitumen carriers Ro-Ro Ferry Various PRODUCTS see the complete REFERENCE LIST on our web page: www.mes.it Gas carriers: 2500 cbm ÷ 12000 cbm 40000 cbm Bunkering vessels: 600 cbm ÷ 40000 cbm

MAIN DIMENSIONS 3000 m3 LNG bunkering vessel CHARACTER. LNG (-163°C) at 5 bars 3000 m3 LNG bunkering vessel MAIN DIMENSIONS Lenght overall : abt. 90.0 m Lenght between perpendiculars : abt. 85.0 m Breadth : abt. 15.0 m Installed Power : 2700 kW Service Speed : 14.3 knots @ 1570 kW

3000 m3 LNG bunkering vessel MAIN 3000 m3 LNG CHARACTER. steel grade selection insulation single or twin screw twin skeg 3000 m3 LNG bunkering vessel

3000 m3 LNG bunkering vessel REFERENCES 3000 m3 LNG 8 sisterships already built (3300 cbm LPG) 3000 m3 LNG bunkering vessel

7500 m3 LNG bunkering vessel . 7500 m3 LNG Bunkering Vessel Lpp = 111.0m B = 18.6m TDES = 6.0m SpeedSERV = 13 kn with Power = 1500 kW PowerINST = 3180 kW . 7500 m3 LNG bunkering vessel

SUPER GREEN SHIP – 40.000 m3 LNG Super Green Ship MAIN CHARACTER. Lpp =179.7 m B = 30.0 m DraftDES = 8.50 m SpeedSERV=16.0 kn PowerINST= 7700 kW Medium Size Worldwide navigation harbours with limitations (max dimensions; low draft; etc..) USE: Gas distribution door2door Terminal on-shore FSRU MAIN CHARACTER. Bilobe tanks 9% Nickel Insulation: poliurethane Onboard regasification plant unit Twin screw / twin skeg Higher safety Low draft Slow steaming Low consumption Dual Fuel SUPER GREEN SHIP – 40.000 m3 LNG

SUPER GREEN SHIP – 40.000 m3 LNG Super Green Ship MAIN CHARACTER. Lpp =179.7 m B = 30.0 m DraftDES = 8.50 m SpeedSERV=16.0 kn PowerINST= 7700 kW Medium Size Worldwide navigation harbours with limitations (max dimensions; low draft; etc..) USE: Gas distribution door2door Terminal on-shore FSRU MAIN CHARACTER. Bilobe tanks 9% Nickel Insulation: poliurethane Onboard regasification plant unit Twin screw / twin skeg Higher safety Low draft Slow steaming Low consumption Dual Fuel SUPER GREEN SHIP – 40.000 m3 LNG

SUPER GREEN SHIP – 40.000 m3 LNG Super Green Ship MAIN CHARACTER. Lpp =179.7 m B = 30.0 m DraftDES = 8.50 m SpeedSERV=16.0 kn PowerINST= 7700 kW Medium Size Worldwide navigation harbours with limitations (max dimensions; low draft; etc..) USE: Gas distribution door2door Terminal on-shore FSRU MAIN CHARACTER. Bilobe tanks 9% Nickel Insulation: poliurethane Onboard regasification plant unit Twin screw / twin skeg Higher safety Low draft Slow steaming Low consumption Dual Fuel SUPER GREEN SHIP – 40.000 m3 LNG

SUPER GREEN SHIP – 40.000 m3 LNG Super Green Ship MAIN CHARACTER. Lpp =179.7 m B = 30.0 m DraftDES = 8.50 m SpeedSERV=16.0 kn PowerINST= 7700 kW Medium Size Worldwide navigation harbours with limitations (max dimensions; low draft; etc..) USE: Gas distribution door2door Terminal on-shore FSRU MAIN CHARACTER. Bilobe tanks 9% Nickel Insulation: poliurethane Onboard regasification plant unit Twin screw / twin skeg Higher safety Low draft Slow steaming Low consumption Dual Fuel SUPER GREEN SHIP – 40.000 m3 LNG

Insulation: poliurethane Onboard regasification plant unit Super Green Ship Super Green Ship 40,000 m3 LNG MAIN CHARACTER. Bilobe tanks 9% Nickel Insulation: poliurethane Onboard regasification plant unit Twin screw / twin skeg Higher safety Low draft Slow steaming Low consumption Dual Fuel SUPER GREEN SHIP – 40.000 m3 LNG MAIN CHARACTERISTICS Bilobe Tanks 9% Nickel Insulation: poliurethane Onboard regasification plant unit Twin screw / twin skeg Higher safety Low draft Slow steaming Low consumption Dual Fuel

TRANSFORMATION LPG  LNG CARRIER 3700 m3 LNG Bunkering Vessel PRESENT WORK LPG  LNG new bilobes 2  3 tanks lenghtening (+20m) D.F. M.E. D.F. A.E. GVU LNG plant TRANSFORMATION LPG  LNG CARRIER DUAL FUEL PROPELLED EXISTING SHIP 3000 m3 LPG carrier (-48°C) SHIP MODIFIED 3700 m3 LNG carrier (-163°C)

TRANSFORMATION LPG  LNG CARRIER 3700 m3 LNG Bunkering Vessel PRESENT WORK LPG  LNG new bilobes 2  3 tanks lenghtening (+20m) D.F. M.E. D.F. A.E. GVU LNG plant TRANSFORMATION LPG  LNG CARRIER DUAL FUEL PROPELLED EXISTING SHIP 3000 m3 LPG carrier (-48°C) SHIP MODIFIED 3700 m3 LNG carrier (-163°C)

TRANSFORMATION LPG  LNG CARRIER 3700 m3 LNG Bunkering Vessel PRESENT WORK LPG  LNG TRANSFORMATION LPG  LNG CARRIER DUAL FUEL PROPELLED SHIP MODIFIED General Arrangement Capacity Plan Midship Section Stability Longitudinal Strenght Scantling Plans Freeboard E.N. E.R. arrangement (new M.E., GVU, LNG propulsion plant) F.E.M. thermal calculations

TRANSFORMATION LPG  LNG CARRIER 3700 m3 LNG Bunkering Vessel PRESENT WORK LPG  LNG TRANSFORMATION LPG  LNG CARRIER DUAL FUEL PROPELLED SHIP MODIFIED General Arrangement Capacity Plan Midship Section Stability Longitudinal Strenght Scantling Plans Freeboard E.N. E.R. arrangement (new M.E., GVU, LNG propulsion plant) F.E.M. thermal calculations

Double Wall tank for D.F. propulsion Dual Fuel Propulsion Double wall tank (150 cbm) Inner vessel Outer vessel Vacuum +MLI 150 cbm double wall tank for dual fuel propulsion Tank Connection Space Outer shell Double Wall Pipes Connection Inner shell Cradle

WARTSILA & FINCANTIERI RO-RO PAX DUAL FUEL SOLUTIONS FOR D.F. PROPULSION Double wall tanks 9%Nickel Insulation: Vacuum + M.L.I. FEM analysis CO-OPERATION WITH WARTSILA & FINCANTIERI Necessity to reduce at minimum possible the B.O.G. and maximixe the holding time double wall tank (vacuum insulation + M.L.I.) cooling down calculations and FEM process simulations (Transient thermal analysis) thermal stress analysis 24

RO-RO FERRY - FINCANTIERI STQ QUEBEC FINCANTIERI SCOPE OF SUPPLY RO-RO FERRY - FINCANTIERI SCOPE OF SUPPLY Scantling plans (Ship structure) Sistem schematics (P&ID) Ventilation Outfitting LNG Bunkering station Assistance & consultancy Hazid/Hazop assistance LNG tanks design + Temperature Distribution Analysis (Wartsila)

RO-RO FERRY - FINCANTIERI STQ QUEBEC FINCANTIERI MAIN CHARACTER. Dual fuel Propulsion Transport of passengers Transport of cars/trucks RO-RO FERRY - FINCANTIERI MAIN DIMENSIONS Lenght overall : abt. 130.00 m Lenght between perpendiculars : abt. 22.40 m Breadth : abt. 22.40 m Service Speed : abt. 20.0 knots Installed Power : 20,000 kW No. max passengers : 800 No. CEU (car equivalent units) : 180 Crew : 35 Ice Class : 1AS FS

RO-RO FERRY - FINCANTIERI STQ QUEBEC FINCANTIERI MAIN CHARACTER. Dual fuel propulsion Transport of passengers Transport of cars/trucks RO-RO FERRY - FINCANTIERI LNG TANKS Capacity : 2 x 280 m3 Indipendent type IMO C Support cradles Max Pression : 9 bar Double Wall Insulation by vacuum in combination with M.L.I. Double wall pipes

RO-RO FERRY - FINCANTIERI STQ QUEBEC FINCANTIERI MAIN CHARACTER. Dual fuel propulsion Transport of passengers Transport of cars/trucks RO-RO FERRY - FINCANTIERI BUNKER STATION Bunkering by trucks Semi-enclosed space Airlock Hazardous Area Mechanical ventilation OCIMF Regulations Gas detection Dry Powder

RO-RO FERRY - FINCANTIERI STQ QUEBEC FINCANTIERI F.E.M. thermal calculations RO-RO FERRY - FINCANTIERI LNG TANKS Capacity : 2 x 280 m3 Indipendent type IMO C Support cradles Max Pression : 9 bar

Double wall pipes F.E.M. thermal calculations STQ QUEBEC FINCANTIERI

FINCANTIERI STQ FERRY http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html

FINCANTIERI STQ FERRY http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html

FINCANTIERI STQ FERRY http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html

FINCANTIERI STQ FERRY http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html

Gas handling needs specialistic knowledge: CONCLUSION CONCLUSION CONCLUSION Gas handling needs specialistic knowledge: thermodynamics safety concepts /Rules …. materials / metallurgy / special welding technological limits assembly Designer to give specialistic assistance to the Client: HAZID (design) / HAZOP (operative risks) transfer / bunkering gas freeing / gassing-up / cooling down

THANKS FOR THE ATTENTION Contacts THANKS FOR THE ATTENTION Visit us on the web : www.mes.it Follow us on (Marine Engineering Services Srl) M.E.S. – Marine Engineering Services S.r.l. info@mes.it techdep@mes.it