Copyright by Team 5- Group Document contains personal property from a team effort and Patent Protection will be supported, this is a message of intent.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Fasteners Mr. Lombardi. Fasteners Mr. Lombardi.
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
Service Technician Training
Essential reading: SPINČIĆ, A., PRITCHARD, B, An English Textbook For Marine Engineers 2, Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička.
Mechanical Department
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Tools Material Pre-Assembly Assembly Purpose Test 4/24/2015 JTOT Jet A – Thermal Oxidation Test Training Memphis Refinery Lab Tools Material Pre-Assembly.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
1 UBC International Training Fund Presents. Tensioning.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Yamaha oil pump rebuild
ME 330 Manufacturing Processes MECHANICAL ASSEMBLY: Joining Methods using Fasteners.
LEarNeR© Kit 1- Core LENR Reactor Description of hardware, fittings and raw metal that can be purchased. Prices, part numbers & vendors, high pricing for.
Fasteners, Gaskets, Seals, & Sealants
UBC International Training Fund
Objective of the session.
Solenoid Pressure Regulator Check Valve Hand-turn Valve Pipe Clamp L-Bracket Mounting Block Plastic Tubing AN Fitting AN T-Fitting Pressure Sensor Base.
Marine Auxiliary Machinery Chapter 8 Lesson 3 Actuator Main Parts.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Northwest Natural 12” Pipeline Integrity Project Team Members Jon Ziring Zack Lemmon Long Nguyen Academic Advisor Faryar Etesami NWN Sponsor Advisors Ross.
The art of Engineering TURBINE PARTS. The art of Engineering TURBINE PARTS Valve Parts A. Stems, Disc, Seats B. Crosshead Assembly, Crosshead Bushings,
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
Marine Oily Handling Devices and Pollution Prevention Chapter 5 Lesson 1 Alfa – Laval Separator (II)
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
Presented by Jon Pannell
DIESEL ENGINE ENGINE DEVELOPMENT DIRECTORATE
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
CYLINDER HEADS AND VALVES. 1.DEFINITION  Cylinder head is a casting that covers the top of a cylinder.
ME421 Heat Exchanger and Steam Generator Design Lecture Notes 6 Double-Pipe Heat Exchangers.
MECH1200 SEALS, GASKETS & SEALANTS. MECH1200 WHAT CAUSES LEAKS Causes of leakage –Worn or damaged seals –Worn or damaged gaskets –Worn or bent parts or.
Use of Residual Pressure Valves - Challenges and Opportunities for Indian subcontinent. Presented By: Rohit Behani.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Manufacturing the Base Plate #2. Contents of this presentation are for the machinist to view the best method of producing this foundational part to the.
(c) McGraw Hill Ryerson Constructed Fluid Systems By controlling fluids, humans attempt to do work or protect development.  Hydraulics = create.
INTO A LEarNeR© 7 KIT TO BE USED FOR THE PURPOSE OF LEARNING LENR AND RESULTING IN A USEFUL WATER HEATER POWERED BY A BATTERY 5/7/2012Copyright by Dale.
A patentable design. First Production Document Provisional U.S. Patent Draft 12/25/2015Copyright(c)2012 by Dale G. Basgall.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 23 Using Gas Welding Equipment.
Development of tritium breeder monitoring for Lead-Lithium cooled ceramic breeder (LLCB) module of ITER presented V.K. Kapyshev CBBI-16 Portland, Oregon,
Referenced product Dolphin 5 RE: Lui 2 review #001 12/26/2015Answers to Lui 001 Dolphin 5 by Dale.1.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
LAB #10. Governor Control Arm Using a 10mm socket install the two bolts that hold the governor control arm. Finger tighten then torque to 100 “#
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 13 Fastening Metal.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
CYLINDER HEADS AND VALVES. 1.DEFINITION  Cylinder head is a casting that covers the top of a cylinder.
Hub and Wheel Bearings Wheel bearings allow the wheel to turn freely. The bearings may be either tapered roller bearings or ball bearings. If the spindle.
Constructional Engine Components
Today’s Plan Fasteners Threading Fasteners.
STEP 1: ASSEMBLE ANGLE PLATES
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
HE (Heat Exchanger) fuel reactor
ENGINE MODE CODES.
Oxyacetylene Welding Processes
Automotive Engines Theory and Servicing
System One Pumps S1-101 Construction and Features
Automatic Transmissions and Transaxles
Automotive Engines Theory and Servicing
LEarNer© Burn Chamber Specific Areas Detail.
Welcome! Drafting 2323: Pipe Drafting
Valve Manifold Assembly/Disassembly
Universal Reactor Single core
4D-100, 4D-600 2½”- 10”.
Part II Design of Fasteners and Joints
880V 21/2”-10”.
Servo Pilot SFP-150 to 1500.
Automotive Engines Theory and Servicing
Presentation transcript:

Copyright by Team 5- Group Document contains personal property from a team effort and Patent Protection will be supported, this is a message of intent and to allow others reading this text to become aware that legal issues involved in the protection of this document require this notice.

LEarNeR© Kit 1Core This is a schematical embodiment of the backside of a LENR fuel (powder) single core housing and a method to use powder and H20 within enclosed chambers to create pressurized hydrogen gas. Also this method allows the usage of conventionally compressed hydrogen gas out of a sealed container. The only subject matter to be disclosed in this presentation is relating to “the reactor kit” and will not divert into the optimization possibilities. This is simply an experimenters starting point and a teaching tool. 7/16/2012Experimenter single core ( Lui Concept)2

Hardware & Fittings Hardware is defined as threaded fasteners ( bolts – screws – nuts) and fittings usually connect pneumatic or hydraulic conduits releasably and both are intended to fit into holes. These holes are precisely calculated as to “fit optimally” into and inner relationship locking arrangement using multiple variations of “threads”. This makes devices detachable forming smaller components and adds value to a product. When things are permanently affixed together by either welding or gluing or other same type methods it makes the product more specifically “custom”. 7/16/2012Experimenter single core ( Lui Concept)3

Kit Contents (outer) REACTOR ASSEMBLY – 1. BASE PLATE - 2. COOLANT TANK - 3. TANK RETAINER - 4. SEAL PLATE - 5. SEALING STUDS - 6. SHIELDING PLATE - 7. STUD NUT - 8. SHIELD PACK COOLANT INLET COOLANT OUTLET PIPE PLUG VALVE CAP LEVELER LEGS /16/2012Experimenter single core ( Lui Concept)4

Kit Contents ( inner ) GLOW PLUG REACTOR HOLDER REACTOR CHAMBER SEAL JET Note: SEAL JET 19. is not shown in this pic. SEAL JET 19. is part of the BASE PLATE 2. and it is the element part that seals the H20 and the hydrogen generator powder within their separate chamber conduits. 7/16/2012Experimenter single core ( Lui Concept)5

19. SEAL JET FIG. 14 is an exploded section whereas the FUEL CHAMBER 18. has been moved into place for loading hydrogen. This is accomplished when the GLOW PLUG 16. is tightened to it’s rotational torque value specified. The SEAL JET 19. is simply a pressed in seal of metal that blocks any H20 from wetting the loaded powder to produce hydrogen gas. Only after the 19. seal is forced downward by the installation of GLOW PLUG 16. does it allow the two to combine producing the hydrogen gas. 7/16/2012Experimenter single core ( Lui Concept)6

Assembly - Reactor The base plate 2 is the foundation, it can be loaded with H20 and powder in two separate containers which are kept separated from one another. This can be done at the factory of manufacture or at the location of assembly in the experimenters lab. The holder 17 is torqued to spec first into the baseplate 2. The two o-rings not shown are installed into the mill cut grove where the tank 3 is installed into part 2. The four tank retainers 4 are installed and tightened and shield pipe 10 is slid over tank 3. The four studs 6 are then installed into part 2 stud holes and tightened by hand. The cover 5 is then installed as well as 9 & 7. Nuts 8 are torqued to specification. 7/16/2012Experimenter single core ( Lui Concept)7

Loading for Reaction Reactor chamber 18 is then slid carefully into holder 17. Glow plug 16 is then installed and torqued to specification. This process moves jet 19 downward into a position that allows water to flow into the hydrogen generator powder compartment as well as forming a gas chamber for pressurization of the hydrogen gas. 7/16/2012Experimenter single core ( Lui Concept)8