Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.

Slides:



Advertisements
Similar presentations
How to Use Stowe School District
Advertisements

DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
TFACTS Private Provider Case Assignment and Termination.
The PHENIX/EMCal(PbSc)/BB/TOF Laser User Instructions Sean Stoll (rev. 12/8/03)
1 Burn-in Viewer User’s Guide Version 2.0 February 17, 2005 LukasTomasek
E-Portfolio Using sites.Google.com. Why Google? Easy to use Easy to share Accessible Permanent.
Period Run Coordinator Shift Guide Period Run Coordinator Shift Guide Updated on PRC Guide.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
How to Get The Most Out of Outlook 2003 Michele Schwartzman Division of Customer Support Summer 2006.
Operating Systems Day 3. Changing Date & Time 1.Double click on digital clock on the notification area of a task bar (Click start button, Click control.
Configuring Task Scheduler Lesson 9. Skills Matrix Technology SkillObjective Domain SkillDomain # Understanding Task Scheduler Configure and manage the.
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
5. Data Manager 1. Introduction 2. Data Manager Duties 3. Quality Checking 4. Problem Reporting 5. Data Monitoring 6. Histogram Presenter 7. Trend Presenter.
Basic Administration.  Familiarize support staff with basic DSX administrative tasks  Provide expedited service to customers  Minimize the involvement.
For Version 6.0 and later Lattice3D Reporter Tutorial For Version 6.0 and later LATTICE TECHNOLOGY, INC.
User Interface Elements of User Interface Group View.
4 May I/O Control. 4 May What is I/O Control? A Doors feature that allows you to program input events to drive output responses – for example:
© 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice SISP Training Documentation Template.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
111 EMC CONFIDENTIAL—INTERNAL USE ONLY NMC -- NW Administration NMC Team NetWorker 7.3 TOI July 28, 2005.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
1. Insert the Resource CD into your CD-ROM drive, click Start and choose Run. In the field that appears, enter F:\XXX\Setup.exe (if “F” is the letter of.
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
Offline shifter training tutorial L. Betev February 19, 2009.
Diagnostic Pathfinder for Instructors. Diagnostic Pathfinder Local File vs. Database Normal operations Expert operations Admin operations.
Chapter 33 Troubleshooting Windows Errors. STOP Errors  When Microsoft Windows XP encounters a serious problem  And the operating system can't continue.
How to Run a Scenario In HP LoadRunner >>>>>>>>>>>>>>>>>>>>>>
OFFLINE TRIGGER MONITORING TDAQ Training 5 th November 2010 Ricardo Gonçalo On behalf of the Trigger Offline Monitoring Experts team.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Stefan Schlenker, CERN ATLAS Post-LS1 Operations Workshop, 24th June 2013, CERN DCS Tools during ATLAS Run 1 Questionnaire Results Stefan Schlenker, CERN.
PHOS DCS guide (for PVSS based products only) Alexander Mamonov Last update: 1 th October, 2010.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
Computing Fundamentals Module Lesson 7 — The Windows Operating System Computer Literacy BASICS.
RPC DQM status Cimmino, M. Maggi, P. Noli, D. Lomidze, P. Paolucci, G. Roselli, C. Carillo.
SCT DQ Training DQ Training 2011 Dr. Petra Haefner.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
1 User guide for Muon shifter part 2 : control of LV, HV, TELL1 Preliminary version 9-July-08 (to be checked by Michela) I have simply put together the.
PSEN Server Balance EN/ICE Procedures Jean-Charles Tournier EN/ICE/SCD 14-January-2016.
6. Shift Leader 1. Introduction 2. SL Duties 3. Golden Rules 4. Operational Procedure 5. Mode Handshakes 6. Cold Start 7. LHCb State Control 8. Clock Switching.
22-March-2010CSC DCS Instructions1 Top Level of CSC DCS UI Communication Status Majority Logic Subsystem Panel HV, LV, FEDS CSC End View * CSC * PCrates.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
JBMCambridge Workshop 6th to 7th January DAQ-DCS Communication.
1 TRT DCS: Shifter Basics Main goal – make sure TRT Detector is in good condition: - TRT FSM node: state READY and status OK - no alarms in the alarm screen.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
Windows Vista Configuration MCTS : Internet Explorer 7.0.
Introducing Scratch Learning resources for the implementation of the scenario
TRTViewer: the ATLAS TRT detector monitoring and diagnostics tool 4 th Workshop on Advanced Transition Radiation Detectors for Accelerator and Space Applications.
Inner Detector Combined Shift Tools and Procedures version 0.8 September 6th, 2011.
Run period 2010 Updated on C. Garabatos and C. Lippmann
ATLAS MDT HV – LV Detector Control System (DCS)
Shift instructions August 16, 2017 Antoni Aduszkiewicz
Offline shifter training tutorial
Offline shifter training tutorial
Inner Detector Combined Shift
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
Presentation transcript:

Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII – Problems 2

4

5

6

7

SCT Shift Desk ACR, CERN, Meyrin Shift Leader Desk ACR, CERN, Meyrin 9

TDAQ ScreenDQM Screen DCS and Alarm Screens 10

11

12

13 Short summary….. ******************************************* 15.00: start of shift 15.04: Recovered module Crate 22 Ch 4 which showed a trip error : end of run :05 Expert takes over DAQ to investigate XXX 18:30 DAQ tests concluded. The result is that blah blah blah... and more blah, blah, blah… Changes have been applied, blah, blah, blah… 18.40: SCT on stand-by 19.17: Start of Physics run : SCT on during LB : Monitoring the number of errors, stable and around 20-30,see separate report from MON shifter. … 21.12: Run Try a short cosmics run again (8 bins, 1000 triggers, timeout 60s) Result status -> no fail, but quite a few problematic modules? …

SCT Links General Information 14

Important Announcements Phones 15

16

17

Log Window Options Applications 19

Select the setup script (/det/tdaq/scripts/setup_TDAQ.sh will always point to the production release)1 Select the partition db file (i.e., /atlas/oks/tdaq /combined/partitions/ATLAS.data.x ml) 2 Get the partition(s) described in db (the Part Name list will be automatically filled) 3 Tell the DAQPanel to acquire the information 4 20

21

22 RootController Commands Tab Panels MRS Log Window Run Information & Settings

23 Change subscription Message format Clone table Start from DAQPanel – Main tab – MRS button

24

25

26 Data shows different options depending on the kind of display selected (Module Configuration in this case) Views: Geometry and ROD crates List of: Barrels/Wheels or Crates in the configuration Different module groups Each of the squares is a module

27 Example: SCT View SIDE Coordinates of the module under the mouse 0 – No Data 1 – Bad Data 2 – CLK/2 a – Corrupt Data A – ABCD Error code C – Config Readback mode E – Returning events J – Junk Data O – Other

28 You can access to the different menus using the toolbar or with a right click on the empty part of the screen - Module Configuration: Change modules in the configuration - Probe Data: Check for modules with errors and recover them. Using this display you can perform actions like Power Cycle, Reset, Configure… - Data Manager: Allows you to access to results and plots from a test - Test Results: Show test results for all the modules - DCS Conditions: Several of the DCS parameters related with the modules are available through the SctGui (Temperature, LV, HV,...)

29 How to check the ROD which is BUSY? Right Click at the TIM Module and select TTC Status - If Right Click on any of the Crates a menu will show three possibilities: - Clear Latch - Mask ROD Busy - Raise ROD error (manual stop-less removal) : Use this one if a busy appears and is not picked up by the automatic removal Only do this if DAQ EXPERT (162034) ask you to do it TTC Status

30 - In SctGui : Tools Menu  Physics Mode Scan - Need to be in Physics mode (standalone) or in ATLAS partition - Uses triggers to acquire events, number of events and crates can be selected - Results are displayed in the SctGui – Test Results Physics Mode

31

33 Also available on the Beam Intensity From LHC (P4) / bunch Beam Intensity From Beam Pick Up / bunch

34

35

36

37 How to see if SCT is in STANDBY? Masks Link to the LHC Handshake page

38 SCT Status : Injection Permit and HV Link to the LHC Handshake page Beam Protection OFF / ON

39 SCT Status : Injection Permit and HV Beam Flag Protection OFF / ON LHC Status

40

41

42

43

44

45

46 NO BEAM Short Interruption INJECTION PERMIT=FALSE PROTECTION ACTIVE STABLE BEAM=False NO BEAM Long Interruption INJECTION PERMIT=FALSE PROTECTION OFF STABLE BEAM=False INJECTION INJECTION PERMIT=True PROTECTION ACTIVE STABLE BEAM=False STABLE BEAM INJECTION PERMIT=False PROTECTION ACTIVE STABLE BEAM=True RAMP/SQUEEZE/.. INJECTION PERMIT=True PROTECTION ACTIVE STABLE BEAM=False Injection handshake warning Inject and dump cycle or lose the beam (no dump) LHC Page 1 announces NO BEAM for > 8hours NO YES 1) SL notifies ARC and shifters in the ACR 2) Shifters inform their SRC if instructed to 3) SRC requests to ARC to override STABLE BEAM flag 4) ARC checks LHC plan, gives permission for STABLE BEAM flag override 5) SRC can override STABLE BEAM flag and notifies SL 1) SL notifies ARC and shifters in the ACR 2) Shifters inform their SRC if instructed to 3) SRC requests to ARC to override STABLE BEAM flag 4) ARC checks LHC plan, gives permission for STABLE BEAM flag override 5) SRC can override STABLE BEAM flag and notifies SL SL Removes Injection Permit SL Removes Injection Permit Injection handshake warning 1) SL notifies ARC 2) Remove STABLE BEAM override 1) SL notifies ARC 2) Remove STABLE BEAM override LHC Page 1: Beam <2hours 1) SL notifies ARC 2) Remove STABLE BEAM override 3) SL goes through Injection handshake 1) SL notifies ARC 2) Remove STABLE BEAM override 3) SL goes through Injection handshake Beam dump ARC= ATLAS Run Coordinator. SRC= Sub system Run Coordinator SL = Shift Leader SL goes through Injection Handshake & brings ATLAS to STDBY, gives Injection Permit Beam dump Acronyms

47

48

50

51 Log in as yourself !

52 Log in as yourself ! Beam Flags Summary SCT Status Beam Status Alarms

53 Padlocks: Padlocks: No control, Free No control, Included Exclusive, Owner Shared, Owner Exclusive, NOT Owner Shared, NOT Owner No control, Locked Out Padlock background: Padlock background: Tree complete Excluded children (partitionable trees) Disabled children (non-partitionable ) Control: Control: No propagation, NO commands Propagation, NO commands Propagation (if Included), Commands by you Propagation (if Included), Commands by all Propagation (if Included), NO commands Propagation (if Included), Commands by all No propagation, NO commands Tree complete Excluded children (partitionable sub-trees) Disabled children (non-partitionable sub-trees or devices)

54 ON/OFF flag shows when FSI laser is ON (light in SCT), in the Barrel and/or both End-caps. Note FSI laser is usually ON, even when FSI partition is not running. Access under: SCT -> INFRASTRUCTURE -> FSI History plots show peak and mean power in each SCT region: fibres 0 & 1 are Barrel, fibres 2 & 3 are both End-caps.

55

56 Access to ROD Crates Power

57

59 Comment Help

60 OHP Configuration Buttons to OHP and DQM Main tab

61 If NULL monitoring could be not working or between updates Colors show the result of the Checks from DQM Links to different tabs

62 SCT Tree SCT tab Bad Module - RED

63 Mon Advanced tab Last Update (60 s) Press to get last update

64 Mon Advanced tab

65 > 35 hits > 70 % error rate < 90 % efficient > NO OUT + Masked Online

66

68

69