Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design.

Slides:



Advertisements
Similar presentations
Aeronautics airplane aileron balloon aircraft clouds 1.
Advertisements

Prospectus about Land Rover type reconnaissance car.
Design Presentation Spring 2009 Andrew Erdman Chris Sande Taoran Li.
Investigating the Use of a Variable-Pitch Wind Turbine to Optimize Power Output Under Varying Wind Conditions. Galen Maly Yorktown High School.
SD-May1014 Team: Michael Peat, Kollin Moore, Matt Rich, Alex Reifert Advisors: Dr. Nicola Elia and Dr. Phillip Jones.
Development of Guidance and Control System for Parafoil-Payload System VVR Subbarao, Sc ‘C’ Flight Mechanics & Control Engineering ADE.
National Soaring Museum Glider Simulation Zeb Ford-Reitz Chris Guy Matt Mullin Karen Roth Stefan Schmid Faculty Coach: Professor Hawker Sponsors: National.
Project Status Update II R09230: Open Architecture, Open Source Unmanned Aerial Vehicle for Imaging Systems A. Benjamin Wager (ME) B. Michael Skube (ME)
Phase V Presentation Group 7 Thomas Kudej Marko Sutovic Timothy Smith.
02/10/2004By: Strobridge & Sulkoski1 G.U.S.T.E.R. Mechanical Design Project Presentation.
EDGE™ MAV Control System - P Management Review (MSD I) Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
UHM CanSat Team Members: Chris Ho: Team master, software Tyson Fukuyama: Hardware.
12/13/2003By: Strobridge & Sulkoski1 G.U.S.T.E.R. General Universal System for Testing External Rotors.
EDGE™ MAV Control System - P09122 Final Project Review Erik Bellandi – Project Manager Ben Wager – Lead Engineer Garrett Argenna – Mechanical Engineering.
Wind power is useful in many forms of energy, as in using wind mills for mechanical power, wind pumps for pumping water or drainage, sails to propel ships,
Kyle Ball Matthew Douglas William Charlock Single Line Tethered Glider Jon Erbelding Paul Grossi Sajid Subhani 9/9/2013 Problem Definition Presentation.
The Effects of Weather on Aircraft Part 2 of 2. Video Delta Flight 191 Aug 2, 1985 Causes and Effects
Single Line Tethered Glider
Where: I T = moment of inertia of turbine rotor.  T = angular shaft speed. T E = mechanical torque necessary to turn the generator. T A = aerodynamic.
S/W Project Management
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
These courseware materials are to be used in conjunction with Software Engineering: A Practitioner’s Approach, 6/e and are provided with permission by.
MAV activities in flight dynamics and control 1 Prof A.V. Efremov, Ph. D., D. of Sc., The Head of Flight Dynamics and Control Department, Moscow Aviation.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
Low Altitude Balloon Experiment in Technology (LABET) Group Members – Richard George – Industrial Technology Mike Svendsen – Computer Engineer Steve Towey.
AEM 5333 UAV Search and Surveillance. Mission Description Overhead surveillance and tracking – Humans on foot – Moving vehicles Onboard GPS transceiver.
Voice of the Engineer R15901: AIRBORNE WIND ENERGY BASE STATION.
Parameter/State Estimation and Trajectory Planning of the Skysails flying kite system Jesus Lago, Adrian Bürger, Florian Messerer, Michael Erhard Systems.
The model of the procedural simulator for the UAV’s operators training (Модель процедурного тренажеру для підготовки операторів безпілотних літальних апаратів)
Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.
R15901: airborne wind energy plane
Unit 1, Day 6. Project  Title: Too Fly for Junior High  Unit: #1 – Scientific Skills  Driving Question: How can we, as scientists, use the scientific.
through Introduction  Particle Imaging Velocimetry (PIV) uses a sheet laser beam to illuminate particles that cross the sheet.  The particles.
M. A. R. S. Mars Aerial Reconnaissance Simulation.
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team Rochester Institute of Technology College of Engineering P /2/
P16462: Wind Energy Base Station Sarah Collmus // Laura Arciniegas // Kevin Larkin // Kevin Collins // Suk Lee // Aleksandr Kim// Michael Ostaszewski.
Introduction Class: Aviation I (AVAT11001) Lecture: Tuesdays B1/G.04 9am-11am Tutorial: Thursdays B1/G.16 9am-11am Lecturer: –Name: Ron Bishop –Office:
P15080: Flow Culture System Multi-Disciplinary Senior Design Problem Definition Review September 11, 2014 Collin Burkhart – Lead Mechanical Engineer Katelyn.
Magnetic Levitation 8th Grade Technology Transportation Unit Eric Wasacz, Ken Bouwens Thomas Rozelle.
E-NABLE Hand Test Rig P16061 David Schwartz, Tia Parks, Shannon Barry, Samantha Mason, Charles Rumfola.
MSD1 WEEK 3 REVIEW By: Group P AGENDA  About Team P15462  Underlying Mission  Existing Systems  Project Background  Problem Statement  Deliverables.
Software Project Management Iterative Model & Spiral Model.
Tethered Glider P14462 Project Review
MSD 1 WEEK 3 REVIEW Team Rochester Institute of Technology College of Engineering P154629/11/
P16104 Microfluidic Spectroscopy for Proteins within CubeSats.
Ted Hench Electronics. Our goals  Meet minimum contest guidelines with ability to expand  Stay within budget Balance the capability of our team with.
MSD 1 WEEK 6 SYSTEM DESIGN REVIEW Team Rochester Institute of Technology College of Engineering P /2/
Tim Southerton Brian Grosso Matthew Morris Lalit Tanwar Kevin Meehan Alex Reid.
Electrophotographic Cascade Development Apparatus Team 15503:Zach Foggetti (ME) Dalton Mead (ME) Bridget Kearney (EE) Ruishi Shen (ISE) Tom Wossner (ME)
Team-Based Development ISYS321 Managing the Information Systems Project.
P16462: Wind Energy Base Station MSD II Phase I Update 2/5/2016 Team Members Aleksandr Kim Laura Arcinegas Kevin “KC” Collins Sarah Collmus Kevin “Kevlar”
Engineering design is the process of devising a system, component, or process to meet desired needs. It is a decision-making process (often iterative),
Messanger IMDL 2014 with A. Antonio Arroyo, PhD Eric M. Schwartz, PhD By: Revant shah 03/20/2014.
Wind and Water Power pp Wind generators  Horizontal Axis— higher positioning of rotor blades  Vertical Axis— catches wind closer to the ground.
Navigation Technology
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
EDGE™ Preliminary Project Plan P09102 – METEOR Stage Separation System JJ Guerrette (ME)
P Tethered Glider ACKNOWLEDGMENTS INTRODUCTION TEAM MEMBERS
Single Line Tethered Glider
MSD 1 Week 6 System design Review
Provide, Tethered, Continuous, Recorded Flight
Single Line Tethered Glider
Multidisciplinary Senior Design I: Problem Definition Review
Deck 12 Accounting Information Systems Romney and Steinbart
Introduction To Technology
The lifting power of air
P16462: Wind Energy Base Station MSD II Phase 5 Review 5/6/2016
P16462: Wind Energy Base Station MSD II Phase 4 Review 4/15/2016
Team P16228: Magnetically Levitated Propeller
Presentation transcript:

Tethered Glider - Base Station Group P16462 Sarah Collmus Laura Arciniegas Kevin Collins Aleksandr Kim Michael Ostaszewski Kevin Larkin Sukmin Lee Design Engineer Drafting Engineer Systems Engineer Aero Engineer Stress Simulation Engineer Controls Engineer Electronics Engineer Project Manager Facilitator Pilot Purchaser Publisher Communications Publisher

Background Problem Statement and Deliverables Use Scenarios Customer Needs Engineering Requirements Project Plan Risk Management Questions Agenda

Current wind gathering systems cannot go much higher due to cost constraints associated with the base An alternate method would be to use a glider tethered to a base station Potential to reach higher altitudes Potential to reduce costs in base construction Background - Need for Project

Background - Similar Projects Ampyx PowerMakani Power ●Comparable energy generation with a 90% reduction in materials ●Glider travels in random flight path ●Weather sensor information to decide if lanch / land needed ●Automated launch and land capabilities ●Grounded generator turned by tether reeling in and out ●Generates 50% more energy with 90% less material ●Kite simulates tip of turbine blade (vertical flight path) ●Computers use GPS to find optimal flight path ●Rotors act as propellers to launch kite ●In flight, rotors allowed to free-rotate, and send energy down tether to generator

Background - Previous MSD groups Current project is the 3rd iteration of the Wind Energy System focused on horizontal flight paths - previous two attempted a vertical path ●P Wind Energy Base Station ○Glider gradually lost altitude with every cycle ●P Wind Energy Glider ○Glider was not able to attain desired flight path Recommendations by previous groups ●Two point bridle system ●Some form of automation to fly or a skilled pilot

Problem Statement

Create the base station to that a purchased glider would be tethered to The base should be designed to be portable and 360 degree motion about a vertical axis. Base station must have a reel system to reel in/out the glider while maintaining a taut tether Video recordings of all official trials Deliverables Ampyx Technology Concept

Use Scenarios Goal of this project is more of a “proof of concept.” Further research will be required before the system can be cleared for use..

Customer Requirements

Engineering Requirements

Project Plan - Phase I Phase 1: Problem DefinitionTasks Date CompleteReason not Completed Push to Phase II? Send out PO for the plane and other materials if not included with the plane9/10/ Meet with graduate student Glen Gavi9/3/ Gather & run Gavi's simulations- Program not acquirable until week 1 of Phase II, Glen out of townYes Translate simulation data- Program not acquirable until week 1 of Phase II, Glen out of townYes Talk to Dr. Kempski about acquiring a transmitter and an ESC-New plane comes with transmitterNo Final Date for all Phase 1 tasks9/10/2015

Project Plan - Phase II Phase 2: Systems DesignTasks Set A - Plane Flight Date completeSet B - Design and ProgrammingDate complete Assemble the planeGather & run Gavi's simulations Find a place in Rochester to test flightsTranslate simulation data Practice Untethered Flight Learn basic computer coding program for flight simulation Research on reel systems Determine how to keep tether taught upon launch Research launch and land systems of RC planes Concept designs of base Final Date for all Phase 2 tasks10/1/2015

Risk Management 1=least 4=most

Thank you! Questions?