U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration www.dot.gov.

Slides:



Advertisements
Similar presentations
WCDR Thematic Panel Governance: Institutional and Policy Frameworks for Risk Reduction Annotated Outline UNDP – UNV – ProVention Consortium – UN-Habitat.
Advertisements

Armand Racine Consultant Chemicals Branch
Harmonized support to scaling up the national AIDS response Ini Huijts 7 th June 2006 ODI meeting, London.
Joint Session PHMSA’s Technical Advisory Committees Office of Pipeline Safety January 17, 2008 Arlington, VA.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Presentation to NACo Environment, Energy and Land Use Steering.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
Strategic Environmental Assessment: Where does Hong Kong stand? LAM Kin Che Chairman, Advisory Council on the Environment Head, Department of Geography.
Draft Action Plan Update – Agenda Item No. 5D Central Valley Flood Protection Board.
29e CONFÉRENCE INTERNATIONALE DES COMMISSAIRES À LA PROTECTION DES DONNÉES ET DE LA VIE PRIVÉE 29 th INTERNATIONAL DATA PROTECTION AND PRIVACY COMMISSIONERS.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2010 Pipeline Safety Trust Annual Conference New Orleans, Louisiana.
Congressional Reauthorization and PHMSA Rulemakings – Enough to avoid future tragedies? Carl Weimer, Executive Director Pipeline Safety Trust.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration PHMSA Office of Pipeline Safety Kenneth Y. Lee Engineering & Research.
Counter-Terrorism Implementation Task Force (CTITF) Open Briefing to Member States 27 July 2010 Conference Room 2 NLB.
Frequently Asked Questions (FAQ) prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Congressional Reauthorization and PHMSA Rulemakings Jeff Wiese.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 2010 NARUC Annual Conference Atlanta, Georgia November 15, 2010.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline and Hazardous Materials Safety Administration Program.
LOCAL GOVERNANCE IN THE 21 ST CENTURY: FRAUD, CORRUPTION AND ETHICS (THE UGANDA EXPERIENCE) PAPER PRESENTED AT TRAINING WORKSHOP HELD AT DOCKLANDS HOTEL.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration San Bruno – Lessons Learned Alan K. Mayberry, P.E. Deputy Associate.
The expected environmental challenges of the Rural Development programming period By Anna Barnett, DG Environment, European Commission at the.
National Preparedness All Hazards Consortium Corey Gruber Assistant Deputy Administrator, National Preparedness National Preparedness.
Learning journey Part 1: Welcome and introduction Part 2: Concepts, evidence, and good practice: Addressing gender-based violence and engaging men and.
Unite and Deliver An update Francesco Galtieri UN Development Operations Coordination Office (DOCO), New York JPO Workshop, Maputo, May 2009.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration USDOT – PHMSA HMEP Grants Major Audit Findings NASTTPO April 25,
InWEnt | Qualified to shape the future1 Capacity Development Programme in Industrial Disaster Risk Management Cooperation under the Programme on Advisory.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Regulatory and Compliance Landscape Western Region Gas Conference.
Northwest Center for Public Health Practice University of Washington School of Public Health and Community Medicine Essential Services.
MAP-21 Implementation and Reauthorization May 6, 2013 Providence, Rhode Island.
Pipeline Safety New Orleans Nov. 18, 2011 Getting to Zero.
Safeguarding Adults Board 6 th Annual Conference Safeguarding Adults and Personalisation: Opportunity and Challenge Jim Leyland – Service Manager, Personalisation.
Best Practices in Parent Center – State Collaboration to Improve Student Achievement Federation for Children with Special Needs and Massachusetts Department.
America’s Natural Gas Utilities’ Distribution Pipelines November 2, 2006 The Connection To the Customer.
SAFETEA-LU Reauthorization Process and USDOT’s Reform Proposal November 2008 Todd Kohr Office of the Assistant Secretary for Transportation Policy U.S.
Projects of National and Regional Significance Program.
Damage Prevention – Are States as engaged as they need to be ? Pipeline Safety Trust Meeting November 20, 2008 New Orleans, LA Glynn Blanton, PHMSA State.
U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration
Sub-theme 5: Workshop 1 The significance of preventive measures Hans G. Nilsson Sub-theme 5: Preventive measures: a national integrity system Workshop.
CBE PRESENTATION TO PARLIAMENT 09 June 2009 OVERVIEW 1. Introductions 2. Background to the CBE History 3. The CBE Mandate 4. CBE Vision and Mission 5.
Federal Transit Administration Office of Safety and Security TRANSIT BUS SAFETY AND SECURITY PROGRAM Mike Flanigon Federal Transit Administration U.S./
- 1 - Joint Gas and Liquid Pipeline Advisory Committee Performance Metrics Briefing Gas Pipeline Safety Data August 8, 2013.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
PLANNING CYCLE An Overview. CONTENT Expected achievements Expected achievements Why IWRM Planning? Why IWRM Planning? Why a strategic approach? Why a.
‘ By Abdou Karim LO Minister of State for Reform and Technical Assistance AfCoP/MfDR Co-Chair.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 1 Mike Israni Senior Technical Advisor Manager: Standards & Committees.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Advisory Committee Groundhog Day Jeff Wiese – OPS.
Office of Pipeline Safety Hazardous Liquid Pipeline Integrity Management July , 2002 Houston, Texas Welcome.
Senate Select Committee on Aging and Long Term Care Final Report and Progress in 2015 Suzanne Reed, Chief of Staff Senator Carol Liu (Chair)
Looking Forward + Carl’s Question Pipeline Safety Trust Annual Conference New Orleans, LA November 19, 2015.
High Consequence Areas & Pipeline Assessment Intervals Pipeline Safety Trust New Orleans, LA November 20, 2008 Elizabeth Komiskey, P.E. PHMSA/Office of.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE OF MINERAL RESOURCES. STATEGIC PLAN 2014/19 DATE: 8 JULY 2014 Programme Financial Administration.
Request for Proposals Q&A Webcast – February/March
Response to Secretary’s Call to Action. NAPSR The National Association of Pipeline Safety Representatives (NAPSR) is a non-profit organization.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention Update and Damage Prevention Rulemaking Sam.
Introduction to Silver Jackets Flood risk management teams reducing flood risk through integrated planning, response and recovery. No Adverse Impact Workshop.
Strategic Objective 4 To promote the exchange of experiences and regulatory knowledge between NRAs inside and outside PANDRH“ Lessons learned from international.
Practical IT Research that Drives Measurable Results Establish an Effective IT Steering Committee.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Pipeline Standards and Rulemaking Division: Current Rulemakings.
Building a Public Health Informatics Division. OSDH Public Health Informatics Division Identify the needs Develop the proposal Establish division Reality.
MIT University Skopje Ass. Prof. Oliver Andonov, PhD
Successes in Achieving Health and Human Services Equity in Minnesota
Data Impacts of Transportation Reauthorization: Data Community’s Plans and Strategies Pat Hu Chair, TRB National Transportation Data Requirements and Programs.
Update on the South Dakota Digital Cadastral Initiative
Interoperability of Data Systems Administration for Children & Families Office of Planning, Research & Evaluation Robert (Bob) Garcia Regional Administrator,
Support for the AASHTO Committee on Planning (COP) and its Subcommittees in Responding to the AASHTO Strategic Plan Prepared for NCHRP 8-36, TASK 138.
Susan Johnson CFOA Director Performance & Improvement
OECD good practices for setting up an RIA system Regional Capacity-Building Seminar on Regulatory Impact Assessment Istanbul, Turkey 20 November 2007.
Introduction of the new Canada Consumer Product Safety Act
PHMSA Update for the API RP1162 Rewrite Team
U. S. Department of Transportation
Presentation transcript:

U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration

How Do Pipeline Laws and Rules Can Made? Jeff Wiese Program Development Director

Background Think of the guidance triangle °Laws °Regulations °National Consensus Standards °Best Management Practices Think of the three legged stool °People °Process °Technology Think about limited asset allocation °Time, money, and people

PHMSA’s Goal To set a pipeline safety agenda that is °Focused on solving problems where new legal authority is required ­Risk based ­Data driven °Transparent °Collaborative But why °Pipeline safety laws are reauthorized every 4 years with possibility of oversight in between where problems arise °Congressional attention is limited °New mandates take a heavy toll and not all are tailored made °Regulatory development is time and resource intensive for all sides – needs to be focused

But How to Set the Agenda Strategically and in concert with our stakeholders °Evaluate risks, threats, and opportunities – focused on solving real problems °Present concepts in every possible public forum to test and improve them and to seek an informed consensus ­Public meetings ­Stakeholder conferences ­Technical advisory committee meetings ­Technical workshops Work to develop an Administration proposal

Past Proposals Our strategy was reflected in the 2002 reauthorization and preceding Administration proposal 2002 Pipeline Safety Improvement Act °Integrity management °Operator qualification °Research °Public awareness °Mapping °Administration proposal was picked up by Senator McCain in his 2000 proposal and, led to the 2002 PSIA

Current Proposal Administration’s proposal °Damage prevention ­9 point program developed by DIMP Team ­Civil enforcement authority ­Technology grants °Building state capacity by raising the current cap on state funding to 80% - incentivized along the lines of the Secretary’s program Other discussion points reflect our work °Low stress pipelines °Human factors (fatigue and control room risk reduction)

During the Reauthorization Iterative process of listening, discussing, educating, and collaborating to manage the best possible outcome The window is, however, open There are lots of other forces that shape the eventual outcome of the bill – if one is put forward °Political control of Congress °Congressional leadership changes °Other important actions that shape any eventual compromise

After the Reauthorization Repeat the process to address the mandates considering °Relative importance to our agenda °Time and money it will take °Relative alignment of stakeholders on solutions and options ­Regulation ­National consensus standard ­Best management practice development ­Report to Congress by the Administration °Administration priorities °Unexpected curve ball from left field All these factors are important, and none can be discarded

U. S. Department of Transportation Pipeline and Hazardous Materials Safety Administration