Session 5 Review A3 progress Error Proofing Visual Control Workplace organisation Standard Operating Procedures.

Slides:



Advertisements
Similar presentations
The Five Ss.
Advertisements

Toyota 5S System SCM 462 Dr. Ron Lembke.
Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
Understanding 5S.
5S training Office Environments.
 Sort the necessary from the unnecessary  Use the Red-Tag technique to highlight unneeded items  Manage all removed items Separate the essential from.
CONTINUAL IMPROVEMENT
Stability Tools 5S How do we do a 5S Sort ? What is 5S ? Why use 5S ?
Stability Tools TPM What is TPM ?
Who Put “Instructional Monitoring” On My To Do List? Suggestions for Principals M. Ann Levett, Ed.D.
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
A3 Reports. Aims & Objectives Target Audience : Anyone who has to write a report or proposal Purpose of Module : To confirm understanding and benefits.
Classroom Rules and Procedures Welcome to Mrs. Lyons’ English Language Arts, Reading, & Speech and Debate Class.
Business Operating System
Footloose Feedback.
Every patient matters STAFF INVOLVEMENT USING LEAN IMPROVEMENT.
Elimination of Waste Your Workplace - You are the expert - You know what your work site needs What is 5S? 5S.
Introduction to 6S.
SCM 494 Dr. Ron Tibben-Lembke
5S A guide to understanding and developing 5S in the workplace.
SCM 494 Dr. Ron Tibben-Lembke
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
JESSICA DIEKEMA MARKETING ASSISTANT Jacks Wholesale Windows 5S.
 There are five primary 5S phases: 1.Sort. 2.Straighten. 3.Shine. 4.Standardize. 5.Sustain. The 5 S's Kamalnathan, MIM.
Key Performance Indicators - KPI’s
SchedulingProducingControllingSchedulingProducingControlling.
Introduction to Lean1 LSSG Green Belt Training Lean: An Introduction.
Visual Workplace - A Prerequisite To Becoming World Class
5S Improving safety & efficiency
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to 5C TOTAL QUALITY MANAGEMENT 5C.
Chapter 4 5S.
What are the Benefits? Action AKA TPM, Total Preventative Maintenance Total Productive Maintenance Breakdowns 1 Setup / adjustment 2 Idling / minor stoppages.
Service Improvement and Culture Change in the Laboratory Services Reception Sarah E Ramsden MSc CSci FIBMS Objectives  To improve the quality of service.
Aluminum Die Casting Visual Workplace (6S).
Safety, Health & Environment
Visual Management Quick Review
Root Cause Analysis Training and Explanation 1.
Risk Management NDS Forum June 23 rd Example safety objective Objective 1: To protect the health, safety & welfare of employees and people at our.
Lean Manufacturing Visual Systems XYZ Company.
Quick Tour Through The 5 S’s of Visual Control Duke Rohe, FHIMSS.
QUALITY SYSTEM 5 S.
Total Productive Maintenance (TPM)
Standardization Control Kaizen Facilitation. Objectives Understand the need for standardization Explore different standardization approaches 2.
“Without the Cost of Waste …”
 What is Standard Work?  Types of Standard Work?  How to create Standards?  Simulation exercise.
Classroom Rules and Procedures Welcome to Ms. Flynn’s English Language Arts & Intensive Reading Class.
S Visual Workplace Process
5-S Quick Learning Module Industrial Solutions, Inc.
Time Card Training.
SchedulingProducingControllingSchedulingProducingControlling.
 What is Standard Work?  Types of Standard Work?  Groundwork for Standard Work.  What is Poka-Yoke?  How to create Standards?  Simulation exercise.
Operations Management Optimising operations. The aim of an OM system is to extract maximum productivity and quality from the production process. This.
5S Introduction – Workplace Organisation
Visual Management Visual Management.
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
BE-TL1-001-DRAFT-5S 5S Business Excellence DRAFT October 5, 2007.
Lean production, Kaizen & 5S K.B.Gopalam Aura Leadership Foundation Hyderabad.
5S Workplace Organization Northland Community & Technical College Presented by: Tim Bergerson, Robbi Brateng, Mitch Ostrom, Jesse Adkins, Bob Gooden,
Scientific data storage: How are computers involved in the following?
Analysis. This involves investigating what is required from the new system and what facilities are available. It would probably include:
May 2016 Safety Focus Extra. What is 5S and why do we want to do it? Simple but highly effective set of techniques that help organize and remove excess.
5S Improving safety & efficiency. 5S Translation Step JapaneseLiteral Translation English Step 1:SeiriClearing UpSort Step 2:SeitonOrganizingSet In Order.
HOUSE KEEPING A base for any improvement u Even before you plan the direction you need to take, you must remove any obstacles to get a clear view of the.
5S workplace organisation
Office 5S “S” by “S” Implementation guide Site clear = Clearing Up
Welcome to my presentation
5S TRAINING.
Continuous Improvement Coordinator
5S workplace organisation
Manufacturing Production Planning
Presentation transcript:

Session 5 Review A3 progress Error Proofing Visual Control Workplace organisation Standard Operating Procedures

Quality – Right First Time High level of waste generated from ‘rework’ Due to – Incorrect data – Incorrect process / Instructions – Errors – Changes made in one department have an adverse effect on another – Lack of training in the ‘full process’

Quality - How to Improve Give examples of quality issues seen within your department How can these be addressed

Quality - Improvements Standardised work / instructions Training Understanding of the ‘full process’ Own data 100% data accuracy Prevent errors

Can we Inspect Quality in Read this sentence: FINISHED FILES ARE THE RESULT OF YEARS OF SCIENTIFIC STUDY COMBINED WITH THE EXPERIENCE OF YEARS. Now count the F's in that sentence. Count them only once, only once: do not go back and count them again.

Error Prevention Known as Poke Yoke Aims to produce defect free products to the next process Identify and / or prevent error at source eg -can not start -cannot release -cannot pass

Practical Example Using the instructions card, grid and coding conventions please complete a Card 1 in 5 minutes. What difficulties did you have (concerns) What was the reason for them (causes) How can these be eliminated and improved (countermeasures) Try using a Cause, concern and countermeasure board (three columns)to collate your thoughts.

Example: Colour Coding

Example: Computer forms

Example: Filing

Visual Controls Industry – 3 minute rule – Anyone walking into the factory can immediately see if production is on time – If there are any quality issues – If the plant is functioning correctly Could I walk into your office and immediately know – Are all tasks on time – Are there any issues outstanding

Visual Controls Can be split into 2 types – Housekeeping and quality (this session) – Progress and monitors (next session)

Housekeeping & Quality : Examples Colours – Different coloured folders for each academic year – Red copies for urgent work to be done immediately (eg module change forms in registry) – Red Amber Green (RAG), but used more for monitoring

Visual Replenishment Systems

Cell Performance Board Takt Capacity Plan Production Plan Standard Ops OEE Delivery Reason codes Parts per person Downtime

Work Place Audit Board

Skill Matrix

Visual Management Conclusions Simple Communication Easily understandable Continuously updated Accessible to EVERYONE How can you use this within your area?

Workplace organisation (5’S) What is it? – A methodology of improving our workplace – Sort, Sweep, Set, Standardise and Sustain – A place for everything and everything in its place Why do it? – Makes for a better working environment – Makes it easier to see when things are missing – Makes it easier to find the everyday used objects/work

How do we carryout a 5’s activity Step one Sort Identify an area that is in need of improvement. Setup a RED tag auction area Remove all unwanted or unnecessary things from the immediate work place

My own work space sort

How do we carryout a 5’s activity Step Two Sweep Deep clean the area, leave no place untouched

My own workspace Sweep

How do we carryout a 5’s activity Step Three Set From the items remaining (the one’s you have not thrown or given away) identify which you use Every day, Once a week Once a month, Once a year only place the items that you use on a daily weekly basis back into the work area, all other items find suitable storage

My own workplace Set

How do we carryout a 5’s activity Step Four Standardise Place the items where they are going to be most accessible to everyone, if shared then gain consensus from the group You could mark around the items to show where they should be for later reference but only when everyone is agreed that this is the best layout Take a picture of the desired state as a reference

My own workplace Standardise

How do we carryout a 5’s activity Step Five Sustain, the most difficult and often the hardest part of 5’s Ensure everyone works to the new system and record changes that are made with improvements. To help, measure firstly on a weekly bases and then monthly basis the desired against the actual using your standard.

Sustain audit check list

Standard operating procedures What are they? A methodology of giving simple instructions Pictures Flow charts Written instructions Mixture of all of the above Why do we need them Repeatability Training aids Measurement guides Etc.

Standard operating procedures SOP Activity From the following verbal communication make an item using the equipment / materials provided

Standard Operating Procedures SOP Activity From the following SOP Make the item using the equipment / materials provided as part of a group process.